CFC 281 Floor coverings prices in the canton of Bern — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Floor coverings (linoleum, synthetic, cork)” (CFC 281) for the canton of Bern. ACIP chapter no. 22 contains 296 entries, of which 223 are priced items in Swiss francs, excluding VAT (HT), spread over 11 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Bern, the regional ACIP coefficient is 1.02 (cantonal modifier +2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 102.80 CHF/h on a daywork basis.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker102.80CHF/h
- Foreman / team leadern/aCHF/h
- Helper80.35CHF/h
- Apprentice50.25CHF/h
- Regional ACIP coefficient1.02Bern
Prices of the key items of CFC 281 floor coverings in the canton of Bern
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.02; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Special paving SOL-DS-0310 · Carrying out on a sound concrete substrate a monolithic wearing screed of the second class with a thickness of twenty-five to… | m² | 57.25 | 67.35 | 84.20 | — | |
| Linoleum and synthetic floors SOL-LS-0030 · Supply and glued laying of natural linoleum floor covering with marbled decor in rolls of two hundred centimetres of… | m² | 81.65 | 96.10 | 120.10 | — | |
| Wood block paving SOL-PB-0060 · Supply and laying of industrial end-grain wood paving, not impregnated, planed on all four faces, with a height of six… | m² | 115.40 | 135.75 | 169.70 | — | |
| Resilient flooring for gymnasiums and multipurpose halls SOL-RS-0050 · Supply and laying of a jointless resilient sports floor covering with a total thickness of seventeen millimetres… | m² | 137.60 | 161.85 | 202.35 | — | |
| Underlays SOL-CO-0030 · Supply and glued laying of an insulating lower layer in cork agglomerate on roll jute cloth of two… | m² | 56.50 | 66.45 | 83.05 | — | |
| Cork parquet SOL-PL-0010 · Supply and glued laying over a cement screed of cork parquet with fine natural grain coated with a layer… | m² | 100.95 | 118.80 | 148.45 | — | |
| Special paving SOL-DS-0320 · Application over stair treads of a cement mortar finish with extra-hard mineral aggregates of… | ml | 109.35 | 128.60 | 160.80 | — | |
| Special paving SOL-DS-0300 · Carrying out on a sound concrete substrate a monolithic wearing screed of the second class with a thickness of twenty-five to… | m² | 37.80 | 44.45 | 55.60 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 22 (ACIP code shown); the family has 74 entries for the first item. The 223 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Bern)
- Average hourly rate observed (skilled worker)
- 102.80 CHF/h
- Regional ACIP coefficient
- 1.02
- Range of the chapter's rates (from helper to foreman)
- 80.35 to 102.80 CHF/h
- Hub reference agreement
- collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
- Wage zone of the ACIP reference: Blue (City/JB: Red).
- Reference employer charges: 33,3 % for structural work, 24,3 % for finishing work and building services; family allowance rate (CAF): 1,9 %.
- Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Berne (city) +5 %, Bienne 0 %, Interlaken +6 %, Gstaad +20 %.
- The locality with the highest uplift in the canton in the reference is Gstaad (+20 %): the page's cantonal coefficient does not reflect it.
- In the hub's reference, the zone of the canton of Bern is given as “Blue (City/JB: Red)”; the price modifier used here is that of the canton (+2 %), with no separate value for the French-speaking part of the canton (Bernese Jura, Jura bernois). Bienne is listed at 0 %.
Source: ACIP 2026 workbook no. 22 (Floor coverings) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 281 (CFC) and 664, 651 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 281 floor coverings (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: floor coverings in the canton of Bern
What is the daywork hourly rate for floor coverings in the canton of Bern?
According to the 2026 ACIP price list, a skilled worker is charged 102.80 CHF/h on a daywork basis in the canton of Bern and a helper 80.35 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 22 multiplied by the regional coefficient 1.02.
What is the regional ACIP coefficient for Bern?
The ACIP coefficient of Bern is 1.02 (cantonal modifier +2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94.
How much does the item “Special paving” cost in the canton of Bern?
The ACIP item SOL-DS-0310 (Special paving, unit m²) is estimated at 67.35 CHF/m² excl. VAT in the canton of Bern, with a range of 57.25 to 84.20 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 66.05 CHF/m².
Which collective agreement applies to floor coverings in the canton of Bern?
The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Bern, the wage zone shown is “Blue (City/JB: Red)” and the reference employer charges are 24,3 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 281 floor coverings prices in the other cantons
See also the CFC 281 prices: Vaud (coefficient 1.00, skilled worker 100.80 CHF/h), Geneva (coefficient 1.12, skilled worker 112.90 CHF/h), Valais (coefficient 0.95, skilled worker 95.75 CHF/h), Fribourg (coefficient 0.98, skilled worker 98.80 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 97.80 CHF/h), Jura (coefficient 0.94, skilled worker 94.75 CHF/h).
Other trades in the canton of Bern
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.25: 25. Resilient Floors & Resins
- Tool 6.21: 21. Screeds (Cement/Anhydrite)
- Downloadable pack: Site Memo: Tolerances in SIA Standards
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
