Skip to content
Website
ACIP · Art Construction Price Index CFC 224.0 ACIP chapter no. 11 2026 edition

CFC 224 Roofing prices in the canton of Bern — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Roofing (tiles, slate, fibre cement)” (CFC 224.0) for the canton of Bern. ACIP chapter no. 11 contains 262 entries, of which 213 are priced items in Swiss francs, excluding VAT (HT), spread over 13 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Bern, the regional ACIP coefficient is 1.02 (cantonal modifier +2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 134.90 CHF/h on a daywork basis.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker134.90CHF/h
  • Foreman / team leadern/aCHF/h
  • Helper110.95CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient1.02Bern

Prices of the key items of CFC 224 roofing in the canton of Bern

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.02; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Battens COU-LA-0190 · Carrying out ventilation counter-battening with battens of forty-five by fifty millimetres and a spacing of… m² 13.95 16.40 20.55 —
Fibre-cement facade cladding COU-RF-0320 · Supply and laying of edge trim of two hundred and fifty millimetres for corrugated fibre-cement facade in… ml 98.05 115.35 144.20 —
Fibre-cement roofing COU-CF-0010 · Carrying out a double-lap roofing on boarding without battens or counter-battens in fibre-cement slates in standard colour of… m² 117.35 138.05 172.55 —
Corrugated fibre cement COU-FC-0200 · Supply and laying of a top flashing for corrugated fibre-cement roofing in coloured finish ml 89.35 105.10 131.40 —
Flemish or double-interlocking tile roofing COU-CO-0200 · Reworking of a roof with the existing Flemish tiles as double-interlocking tiles, including the replacement of the… m² 73.65 86.65 108.30 —
Plain tile roofing COU-CT-0220 · Reworking of a roof in existing plain tiles in double-lap roofing with replacement of the battens of twenty-four… m² 123.05 144.75 180.90 —
Slate roofing COU-CA-0010 · Carrying out a double-lap roofing in natural slate of the grey-blue natural slate type of four hundred and five by two… m² 255.15 300.20 375.25 —
Concrete roofing COU-CB-0060 · Carrying out roofing in sanded Flemish concrete tiles including battening of twenty-seven by forty millimetres… m² 91.75 107.95 134.95 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 11 (ACIP code shown); the family has 21 entries for the first item. The 213 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Bern)

Average hourly rate observed (skilled worker)
134.90 CHF/h
Regional ACIP coefficient
1.02
Range of the chapter's rates (from helper to foreman)
110.95 to 134.90 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Blue (City/JB: Red).
  • Reference employer charges: 33,3 % for structural work, 24,3 % for finishing work and building services; family allowance rate (CAF): 1,9 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 11. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Berne (city) +5 %, Bienne 0 %, Interlaken +6 %, Gstaad +20 %.
  • The locality with the highest uplift in the canton in the reference is Gstaad (+20 %): the page's cantonal coefficient does not reflect it.
  • In the hub's reference, the zone of the canton of Bern is given as “Blue (City/JB: Red)”; the price modifier used here is that of the canton (+2 %), with no separate value for the French-speaking part of the canton (Bernese Jura, Jura bernois). Bienne is listed at 0 %.

Source: ACIP 2026 workbook no. 11 (Roofing) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 224.0 (CFC) and 363 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 224 roofing (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: roofing in the canton of Bern

What is the daywork hourly rate for roofing in the canton of Bern?

According to the 2026 ACIP price list, a skilled worker is charged 134.90 CHF/h on a daywork basis in the canton of Bern and a helper 110.95 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 11 multiplied by the regional coefficient 1.02.

What is the regional ACIP coefficient for Bern?

The ACIP coefficient of Bern is 1.02 (cantonal modifier +2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94.

How much does the item “Battens” cost in the canton of Bern?

The ACIP item COU-LA-0190 (Battens, unit m²) is estimated at 16.40 CHF/m² excl. VAT in the canton of Bern, with a range of 13.95 to 20.55 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 16.10 CHF/m².

Which collective agreement applies to roofing in the canton of Bern?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 11; the collective agreement that applies in the canton of Bern must be checked with your trade association.

See also

CFC 224 roofing prices in the other cantons

See also the CFC 224 prices: Vaud (coefficient 1.00, skilled worker 132.25 CHF/h), Geneva (coefficient 1.12, skilled worker 148.10 CHF/h), Valais (coefficient 0.95, skilled worker 125.65 CHF/h), Fribourg (coefficient 0.98, skilled worker 129.60 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 128.30 CHF/h), Jura (coefficient 0.94, skilled worker 124.30 CHF/h).

Other trades in the canton of Bern

Hub tools and pack for this trade

Price this chapter in Soumission. The 213 items of ACIP chapter no. 11, adjusted for the canton, directly in your quotes. Discover Soumission