CFC 287 Site cleaning prices in the canton of Vaud — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “End-of-construction cleaning” (CFC 287) for the canton of Vaud. ACIP chapter no. 28 contains 119 entries, of which 107 are priced items in Swiss francs, excluding VAT (HT), spread over 12 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Vaud, the regional ACIP coefficient is 1.00 (cantonal modifier 0 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 93.90 CHF/h on a daywork basis and a foreman or team leader 93.95 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker93.90CHF/h
- Foreman / team leader93.95CHF/h
- Helper69.90CHF/h
- Apprenticen/aCHF/h
- Regional ACIP coefficient1.00Vaud
Prices of the key items of CFC 287 site cleaning in the canton of Vaud
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.00; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Cleaning of floors NET-NS-0300 · Clinker or raw terracotta tile, sweeping, cleaning with a hard brush and vacuuming | m² | 4.50 | 5.30 | 6.65 | — | |
| Cleaning of windows NET-NF-0040 · Insulating or single-glazed window, frames cleaned on all sides, glass cleaned on both sides, metal frame… | m² | 13.75 | 16.15 | 20.20 | — | |
| Cleaning of sanitary appliances NET-NA-0080 · Cleaning of sanitary appliance, taps and fittings included, toilet bowl or Turkish-style toilet | pc | 13.40 | 15.75 | 19.70 | — | |
| Cleaning of stairs NET-NC-0030 · Tread and riser, skirting boards included, dimension up to one hundred and fifty centimetres, lino or polyvinyl chloride… | m² | 4.30 | 5.05 | 6.30 | — | |
| Cleaning of skirting boards NET-NE-0010 · Mineral skirting, natural or reconstituted, rinsing after cleaning | ml | 2.95 | 3.45 | 4.30 | — | |
| Cleaning of walls NET-NP-0010 · Textile-covered wall, vacuum cleaning | m² | 1.90 | 2.25 | 2.80 | — | |
| Cleaning of heating and ventilation installations NET-NI-0040 · Heating element with valve included, washing and wiping | m² | 2.70 | 3.20 | 4.00 | — | |
| Cleaning of built-in elements NET-EE-0020 · Indoor and outdoor cupboards, shelving and side panels included, measured on the front surface… | m² | 6.65 | 7.80 | 9.75 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 28 (ACIP code shown); the family has 42 entries for the first item. The 107 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Vaud)
- Average hourly rate observed (skilled worker)
- 93.90 CHF/h
- Regional ACIP coefficient
- 1.00
- Range of the chapter's rates (from helper to foreman)
- 69.90 to 93.95 CHF/h
- Hub reference agreement
- not linked
- Wage zone of the ACIP reference: Blue (Lausanne: Red).
- Reference employer charges: 34,8 % for structural work, 25,8 % for finishing work and building services; family allowance rate (CAF): 3,4 %.
- This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 28. The applicable collective agreement must be checked with your trade association.
- Locality modifiers of the ACIP reference: Lausanne +5 %, Nyon/Morges +5 %, Montreux/Vevey +3 %, Villars +10 %.
- The locality with the highest uplift in the canton in the reference is Villars (+10 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 28 (Cleaning) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 287 (CFC) and 691 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 287 site cleaning (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: site cleaning in the canton of Vaud
What is the daywork hourly rate for site cleaning in the canton of Vaud?
According to the 2026 ACIP price list, a skilled worker is charged 93.90 CHF/h on a daywork basis in the canton of Vaud, a foreman or team leader 93.95 CHF/h and a helper 69.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 28 multiplied by the regional coefficient 1.00.
What is the regional ACIP coefficient for Vaud?
The ACIP coefficient of Vaud is 1.00 (cantonal modifier 0 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Cleaning of floors” cost in the canton of Vaud?
The ACIP item NET-NS-0300 (Cleaning of floors, unit m²) is estimated at 5.30 CHF/m² excl. VAT in the canton of Vaud, with a range of 4.50 to 6.65 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 5.30 CHF/m².
Which collective agreement applies to site cleaning in the canton of Vaud?
The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 28; the collective agreement that applies in the canton of Vaud must be checked with your trade association.
See also
CFC 287 site cleaning prices in the other cantons
See also the CFC 287 prices: Geneva (coefficient 1.12, skilled worker 105.15 CHF/h), Valais (coefficient 0.95, skilled worker 89.20 CHF/h), Fribourg (coefficient 0.98, skilled worker 92.00 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 91.10 CHF/h), Jura (coefficient 0.94, skilled worker 88.25 CHF/h), Bern (coefficient 1.02, skilled worker 95.80 CHF/h).
Other trades in the canton of Vaud
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
Hub tools and pack for this trade
- Tool 6.35: 35. Construction Cleaning
- Downloadable pack: As-Built Documentation (DOE) & Maintenance Log Pack (SIA 469)
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
