CFC 213 Steel structures prices in the canton of Vaud — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Steel structures” (CFC 213) for the canton of Vaud. ACIP chapter no. 7 contains 353 entries, of which 315 are priced items in Swiss francs, excluding VAT (HT), spread over 16 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Vaud, the regional ACIP coefficient is 1.00 (cantonal modifier 0 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 117.30 CHF/h on a daywork basis and a foreman or team leader 130.20 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker117.30CHF/h
- Foreman / team leader130.20CHF/h
- Helper110.40CHF/h
- Apprenticen/aCHF/h
- Regional ACIP coefficient1.00Vaud
Prices of the key items of CFC 213 steel structures in the canton of Vaud
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.00; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Trimmers, trusses and girders CMT-CF-0390 · Straight girders with solid web, built up and welded, of constant height, simple, with end plates… | t | 2'426.30 | 2'854.45 | 3'568.05 | — | |
| Plate girders in welded built-up sections CMT-PA-0190 · Castellated beams made of sections assembled by welding or cut or welded into hexagonal cells, without… | t | 3'247.85 | 3'821.00 | 4'776.25 | — | |
| Columns and posts CMT-CP-0160 · Bare columns with solid web, built-up and welded, straight lengths of constant or variable section, with plates… | t | 3'758.00 | 4'421.15 | 5'526.45 | — | |
| Truss elements CMT-EF-0210 · Solid-web trusses of variable height, built up then welded, continuous with connections made by welds… | t | 2'830.55 | 3'330.05 | 4'162.55 | — | |
| Plate girders in rolled sections CMT-PO-0140 · Plate girders in rolled sections with a yield strength of two hundred and thirty-five, continuous between beams… | t | 1'658.65 | 1'951.35 | 2'439.20 | — | |
| Roof and floor sheeting CMT-TT-0060 · Laying of profiled sheets for roof and floor, unloading, storage, distribution and laying included, fixing by screws… | m² | 15.05 | 17.70 | 22.15 | — | |
| Supports and anchorages CMT-AA-0040 · Plate serving as a support or anchorage intended to be placed in the formwork and without installation, with holes of… | pc | 142.40 | 167.55 | 209.45 | — | |
| Stairs, landings, walkways CMT-EP-0050 · Stair tread and riser made of folded sheet of four millimetres thickness, tread dimensions three… | pc | 117.20 | 137.90 | 172.40 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 7 (ACIP code shown); the family has 85 entries for the first item. The 315 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Vaud)
- Average hourly rate observed (skilled worker)
- 117.30 CHF/h
- Regional ACIP coefficient
- 1.00
- Range of the chapter's rates (from helper to foreman)
- 110.40 to 130.20 CHF/h
- Hub reference agreement
- not linked
- Wage zone of the ACIP reference: Blue (Lausanne: Red).
- Reference employer charges: 34,8 % for structural work, 25,8 % for finishing work and building services; family allowance rate (CAF): 3,4 %.
- This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 7. The applicable collective agreement must be checked with your trade association.
- Locality modifiers of the ACIP reference: Lausanne +5 %, Nyon/Morges +5 %, Montreux/Vevey +3 %, Villars +10 %.
- The locality with the highest uplift in the canton in the reference is Villars (+10 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 7 (Steel structures) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 213, 272 (CFC) and 321, 632 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 213 steel structures (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: steel structures in the canton of Vaud
What is the daywork hourly rate for steel structures in the canton of Vaud?
According to the 2026 ACIP price list, a skilled worker is charged 117.30 CHF/h on a daywork basis in the canton of Vaud, a foreman or team leader 130.20 CHF/h and a helper 110.40 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 7 multiplied by the regional coefficient 1.00.
What is the regional ACIP coefficient for Vaud?
The ACIP coefficient of Vaud is 1.00 (cantonal modifier 0 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Trimmers, trusses and girders” cost in the canton of Vaud?
The ACIP item CMT-CF-0390 (Trimmers, trusses and girders, unit t) is estimated at 2'854.45 CHF/t excl. VAT in the canton of Vaud, with a range of 2'426.30 to 3'568.05 CHF/t (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 2'854.45 CHF/t.
Which collective agreement applies to steel structures in the canton of Vaud?
The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 7; the collective agreement that applies in the canton of Vaud must be checked with your trade association.
See also
CFC 213 steel structures prices in the other cantons
See also the CFC 213 prices: Geneva (coefficient 1.12, skilled worker 131.40 CHF/h), Valais (coefficient 0.95, skilled worker 111.45 CHF/h), Fribourg (coefficient 0.98, skilled worker 114.95 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 113.80 CHF/h), Jura (coefficient 0.94, skilled worker 110.25 CHF/h), Bern (coefficient 1.02, skilled worker 119.65 CHF/h).
Other trades in the canton of Vaud
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.08: 08. Steel Construction
- Downloadable pack: Quote & Bid Template by CFC
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.