ACIP · Art Construction Price Index CFC 222 ACIP chapter no. 10 2026 edition

CFC 222 Sheet-metal work prices in the canton of Jura — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Sheet-metal work” (CFC 222) for the canton of Jura. ACIP chapter no. 10 contains 633 entries, of which 469 are priced items in Swiss francs, excluding VAT (HT), spread over 13 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Jura, the regional ACIP coefficient is 0.94 (cantonal modifier −6 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 115.20 CHF/h on a daywork basis and a foreman or team leader 128.75 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker115.20CHF/h
  • Foreman / team leader128.75CHF/h
  • Helper101.90CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient0.94Jura

Prices of the key items of CFC 222 sheet-metal work in the canton of Jura

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.94; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Gutters FER-CH-1370 · Supply and laying of an angled bottom for a recessed valley with a girth of thirty-three centimetres pc 106.10 124.85 156.05 —
Downpipes and ventilation FER-DV-1090 · Supply and laying of a chimney pipe as a one-metre element in rolled copper, with a diameter of ten centimetres pc 162.60 191.30 239.10 —
Trims and coverings FER-GR-0270 · Supply and laying of a shelf with covering laid on the roof in three to four layers, with a girth of… ml 71.15 83.70 104.65 —
Branch connections FER-NA-0020 · Supply and laying of a simple straight outlet intended for the half-round gutter with a diameter of seven point five… pc 85.40 100.50 125.60 —
Roof skylights FER-CT-0120 · Supply and laying of a pivoting roof window in lacquered finish for a roof pitch of twenty to… pc 933.00 1'097.65 1'372.05 —
Flashings FER-AB-0140 · Supply and laying of flashing assembled by welding or by folded seams in rolled lead one millimetre thick intended… ml 81.60 95.95 119.95 —
Valley flashings FER-NO-0030 · Supply and laying of a valley flashing with a girth of twenty-five centimetres and a length of thirty-three… pc 15.30 18.00 22.50 —
Gutters FER-CH-1260 · Supply and laying of straight-cut three-fold drip flashing with fixing tabs laid on the timber, with a… ml 63.55 74.80 93.45 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 10 (ACIP code shown); the family has 102 entries for the first item. The 469 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Jura)

Average hourly rate observed (skilled worker)
115.20 CHF/h
Regional ACIP coefficient
0.94
Range of the chapter's rates (from helper to foreman)
101.90 to 128.75 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,5 % for structural work, 25,5 % for finishing work and building services; family allowance rate (CAF): 3,1 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 10. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Delémont −5 %, Porrentruy −6 %.

Source: ACIP 2026 workbook no. 10 (Sheet-metal work) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 222 (CFC) and 362 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 222 sheet-metal work (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: sheet-metal work in the canton of Jura

What is the daywork hourly rate for sheet-metal work in the canton of Jura?

According to the 2026 ACIP price list, a skilled worker is charged 115.20 CHF/h on a daywork basis in the canton of Jura, a foreman or team leader 128.75 CHF/h and a helper 101.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 10 multiplied by the regional coefficient 0.94.

What is the regional ACIP coefficient for Jura?

The ACIP coefficient of Jura is 0.94 (cantonal modifier −6 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Bern 1.02.

How much does the item “Gutters” cost in the canton of Jura?

The ACIP item FER-CH-1370 (Gutters, unit pc) is estimated at 124.85 CHF/pc excl. VAT in the canton of Jura, with a range of 106.10 to 156.05 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 132.80 CHF/pc.

Which collective agreement applies to sheet-metal work in the canton of Jura?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 10; the collective agreement that applies in the canton of Jura must be checked with your trade association.

See also

CFC 222 sheet-metal work prices in the other cantons

See also the CFC 222 prices: Vaud (coefficient 1.00, skilled worker 122.55 CHF/h), Geneva (coefficient 1.12, skilled worker 137.25 CHF/h), Valais (coefficient 0.95, skilled worker 116.40 CHF/h), Fribourg (coefficient 0.98, skilled worker 120.10 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 118.85 CHF/h), Bern (coefficient 1.02, skilled worker 125.00 CHF/h).

Other trades in the canton of Jura

Hub tools and pack for this trade

Price this chapter in Soumission. The 469 items of ACIP chapter no. 10, adjusted for the canton, directly in your quotes. Discover Soumission