CFC 228 Shutters and blinds prices in the canton of Jura — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Roller shutters, blinds and boxes” (CFC 228) for the canton of Jura. ACIP chapter no. 21 contains 396 entries, of which 190 are priced items in Swiss francs, excluding VAT (HT), spread over 10 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Jura, the regional ACIP coefficient is 0.94 (cantonal modifier −6 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 107.95 CHF/h on a daywork basis.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker107.95CHF/h
- Foreman / team leadern/aCHF/h
- Helpern/aCHF/h
- Apprenticen/aCHF/h
- Regional ACIP coefficient0.94Jura
Prices of the key items of CFC 228 shutters and blinds in the canton of Jura
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.94; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Shutter boxes STR-CV-0310 · Supply and laying of a blind box projecting from the facade with lower throat of seven centimetres type four in sheet… | ml | 233.80 | 275.05 | 343.80 | — | |
| Pelmets STR-LA-0540 · Supply and laying of a vertical pelmet with inclined face type two in folded sheet, including the galvanised supports and… | ml | 131.00 | 154.10 | 192.65 | — | |
| Wooden roller shutters STR-VR-0030 · Base price proportional to the area for the supply and installation of an unpainted wooden roller shutter curtain with… | m² | 126.90 | 149.30 | 186.65 | — | |
| Slatted blinds STR-SL-0040 · Base price proportional to the area for the supply and installation of a stacking blind with edged and profiled slats… | m² | 115.90 | 136.35 | 170.45 | — | |
| Fabric blinds STR-ST-0050 · Fixed base rate per element for the supply and installation of a loggia or balcony blind of… | pc | 419.45 | 493.45 | 616.80 | — | |
| Wooden roller shutters STR-VR-0040 · Fixed base rate per element for the supply and installation of an unpainted wooden roller shutter with dovetail profile… | pc | 310.15 | 364.90 | 456.15 | — | |
| Slatted blinds STR-SL-0010 · Fixed base rate per element for the supply and installation of a stacking blind with flexible adjustable slats in… | pc | 281.30 | 330.95 | 413.65 | — | |
| Blackout blinds STR-SO-0010 · Supply and fitting of a full blackout blind comprising a winding axis housed in an upper box… | m² | 474.25 | 557.95 | 697.40 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 21 (ACIP code shown); the family has 115 entries for the first item. The 190 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Jura)
- Average hourly rate observed (skilled worker)
- 107.95 CHF/h
- Regional ACIP coefficient
- 0.94
- Range of the chapter's rates (from helper to foreman)
- 107.95 to 107.95 CHF/h
- Hub reference agreement
- not linked
- Wage zone of the ACIP reference: Red.
- Reference employer charges: 34,5 % for structural work, 25,5 % for finishing work and building services; family allowance rate (CAF): 3,1 %.
- This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 21. The applicable collective agreement must be checked with your trade association.
- Locality modifiers of the ACIP reference: Delémont −5 %, Porrentruy −6 %.
- Workbook 21 gives a floor rate and a ceiling rate for the skilled fitter: the average of the two is used.
Source: ACIP 2026 workbook no. 21 (Shutters blinds) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 228 (CFC) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 228 shutters and blinds (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: shutters and blinds in the canton of Jura
What is the daywork hourly rate for shutters and blinds in the canton of Jura?
According to the 2026 ACIP price list, a skilled worker is charged 107.95 CHF/h on a daywork basis in the canton of Jura (excl. VAT). These rates are those of ACIP chapter no. 21 multiplied by the regional coefficient 0.94.
What is the regional ACIP coefficient for Jura?
The ACIP coefficient of Jura is 0.94 (cantonal modifier −6 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Bern 1.02.
How much does the item “Shutter boxes” cost in the canton of Jura?
The ACIP item STR-CV-0310 (Shutter boxes, unit ml) is estimated at 275.05 CHF/ml excl. VAT in the canton of Jura, with a range of 233.80 to 343.80 CHF/ml (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 292.60 CHF/ml.
Which collective agreement applies to shutters and blinds in the canton of Jura?
The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 21; the collective agreement that applies in the canton of Jura must be checked with your trade association.
See also
CFC 228 shutters and blinds prices in the other cantons
See also the CFC 228 prices: Vaud (coefficient 1.00, skilled worker 114.85 CHF/h), Geneva (coefficient 1.12, skilled worker 128.65 CHF/h), Valais (coefficient 0.95, skilled worker 109.10 CHF/h), Fribourg (coefficient 0.98, skilled worker 112.55 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 111.40 CHF/h), Bern (coefficient 1.02, skilled worker 117.15 CHF/h).
Other trades in the canton of Jura
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.30: 30. Blinds & Shutters
- Downloadable pack: Quote & Bid Template by CFC
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
