Skip to content
Website
ACIP · Art Construction Price Index CFC 221 / 273 ACIP chapter no. 18 2026 edition

CFC 221 Windows and joinery prices in the canton of Jura — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Windows, doors and joinery” (CFC 221 / 273) for the canton of Jura. ACIP chapter no. 18 contains 808 entries, of which 576 are priced items in Swiss francs, excluding VAT (HT), spread over 28 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Jura, the regional ACIP coefficient is 0.94 (cantonal modifier −6 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 106.05 CHF/h on a daywork basis and a foreman or team leader 114.85 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker106.05CHF/h
  • Foreman / team leader114.85CHF/h
  • Helper97.90CHF/h
  • Apprentice46.30CHF/h
  • Regional ACIP coefficient0.94Jura

Prices of the key items of CFC 221 windows and joinery in the canton of Jura

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.94; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Double-glazed or insulating windows and French windows MEN-FE-0190 · Two-casement window, without glazing bars, frame up to fifty-five millimetres, sill piece… pc 1'021.15 1'201.35 1'501.70 —
Single-glazed windows and French windows MEN-FP-0660 · Simple double-casement glazed door, without glazing bars, casement of twenty-six millimetres, frame of… m² 345.55 406.55 508.20 —
Cupboards MEN-AR-0080 · Plain cupboard front above a two-door frame, type in medium-density fibreboard lined on the side… m² 234.00 275.30 344.10 —
Skirting boards and trims MEN-PL-0040 · Skirting without capping up to sixteen millimetres thick, laid above walls, plugs included, from seven to… ml 24.70 29.05 36.30 —
Doors MEN-PO-0020 · Solid door on surface-mounted frame of section eighty by thirty-two millimetres to be painted, with… pc 581.85 684.50 855.65 —
Mouldings and handrails MEN-MM-0230 · Straight handrail of rectangular section, screwed over metalwork, corner joints not included, one hundred… ml 234.15 275.45 344.35 —
Assembled wood panelling MEN-BS-0020 · Smooth wood panelling without boarding, nineteen-millimetre chipboard, one visible face, oak veneer m² 391.70 460.85 576.05 —
Insulation MEN-IS-0040 · Installation and supply of mineral wool boards of standard type, without vapour barrier, laid in walls… m² 30.40 35.75 44.70 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 18 (ACIP code shown); the family has 42 entries for the first item. The 576 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Jura)

Average hourly rate observed (skilled worker)
106.05 CHF/h
Regional ACIP coefficient
0.94
Range of the chapter's rates (from helper to foreman)
97.90 to 114.85 CHF/h
Hub reference agreement
collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,5 % for structural work, 25,5 % for finishing work and building services; family allowance rate (CAF): 3,1 %.
  • Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Delémont −5 %, Porrentruy −6 %.

Source: ACIP 2026 workbook no. 18 (Joinery) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 221, 273 (CFC) and 371, 622 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 221 windows and joinery (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: windows and joinery in the canton of Jura

What is the daywork hourly rate for windows and joinery in the canton of Jura?

According to the 2026 ACIP price list, a skilled worker is charged 106.05 CHF/h on a daywork basis in the canton of Jura, a foreman or team leader 114.85 CHF/h and a helper 97.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 18 multiplied by the regional coefficient 0.94.

What is the regional ACIP coefficient for Jura?

The ACIP coefficient of Jura is 0.94 (cantonal modifier −6 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Bern 1.02.

How much does the item “Double-glazed or insulating windows and French windows” cost in the canton of Jura?

The ACIP item MEN-FE-0190 (Double-glazed or insulating windows and French windows, unit pc) is estimated at 1'201.35 CHF/pc excl. VAT in the canton of Jura, with a range of 1'021.15 to 1'501.70 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 1'278.05 CHF/pc.

Which collective agreement applies to windows and joinery in the canton of Jura?

The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Jura, the wage zone shown is “Red” and the reference employer charges are 25,5 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 221 windows and joinery prices in the other cantons

See also the CFC 221 prices: Vaud (coefficient 1.00, skilled worker 112.80 CHF/h), Geneva (coefficient 1.12, skilled worker 126.35 CHF/h), Valais (coefficient 0.95, skilled worker 107.15 CHF/h), Fribourg (coefficient 0.98, skilled worker 110.55 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 109.40 CHF/h), Bern (coefficient 1.02, skilled worker 115.05 CHF/h).

Other trades in the canton of Jura

Hub tools and pack for this trade

Price this chapter in Soumission. The 576 items of ACIP chapter no. 18, adjusted for the canton, directly in your quotes. Discover Soumission