ACIP · Art Construction Price Index CFC 272 ACIP chapter no. 19 2026 edition

CFC 272 Metalwork prices in the canton of Jura — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Metalwork and locksmithing” (CFC 272) for the canton of Jura. ACIP chapter no. 19 contains 824 entries, of which 725 are priced items in Swiss francs, excluding VAT (HT), spread over 25 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Jura, the regional ACIP coefficient is 0.94 (cantonal modifier −6 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 106.20 CHF/h on a daywork basis and a foreman or team leader 124.20 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker106.20CHF/h
  • Foreman / team leader124.20CHF/h
  • Helper100.60CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient0.94Jura

Prices of the key items of CFC 272 metalwork in the canton of Jura

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.94; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Aluminium windows CME-FA-0800 · Three-part window assembly, made up of two posts, two casements and one… pc 3'102.45 3'649.95 4'562.40 —
Steel windows CME-FE-0230 · Two-casement window, one of which is a hinged casement and a large casement reserved solely for cleaning, in accordance with the… pc 3'988.10 4'691.85 5'864.85 —
Single glazing, steel CME-VS-0070 · Single glazing on fixed frame only, without transoms and glazing bars, glass fixed directly on the frame… pc 1'156.85 1'361.00 1'701.20 —
Fences and gates CME-BP-0900 · Double-leaf gate of one metre fifty width, posts of a section of thirty by thirty millimetres, two… pc 2'458.15 2'891.95 3'614.95 —
Metal doors CME-PM-0240 · Metal door, frame and casing in profiled aluminium, leaf thickness fifty millimetres, of origin… pc 4'822.90 5'674.00 7'092.50 —
Purlins, supports, handrails CME-FS-0350 · Metal handrails and rails, supports invoiced separately, in steel tube of section sixty by forty… ml 118.35 139.25 174.10 —
Solid doors, non-standard CME-PP-0050 · Solid single-leaf door with double sheet and insulation, construction similar to that of the single-sheet door, up to… pc 2'685.40 3'159.30 3'949.10 —
Guardrail CME-GC-0300 · Closing of the handrail or guard rail of type E, horizontal section pc 54.95 64.65 80.85 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 19 (ACIP code shown); the family has 128 entries for the first item. The 725 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Jura)

Average hourly rate observed (skilled worker)
106.20 CHF/h
Regional ACIP coefficient
0.94
Range of the chapter's rates (from helper to foreman)
100.60 to 124.20 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,5 % for structural work, 25,5 % for finishing work and building services; family allowance rate (CAF): 3,1 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 19. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Delémont −5 %, Porrentruy −6 %.

Source: ACIP 2026 workbook no. 19 (Metalwork) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 213, 272 (CFC) and 321, 632 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 272 metalwork (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: metalwork in the canton of Jura

What is the daywork hourly rate for metalwork in the canton of Jura?

According to the 2026 ACIP price list, a skilled worker is charged 106.20 CHF/h on a daywork basis in the canton of Jura, a foreman or team leader 124.20 CHF/h and a helper 100.60 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 19 multiplied by the regional coefficient 0.94.

What is the regional ACIP coefficient for Jura?

The ACIP coefficient of Jura is 0.94 (cantonal modifier −6 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Bern 1.02.

How much does the item “Aluminium windows” cost in the canton of Jura?

The ACIP item CME-FA-0800 (Aluminium windows, unit pc) is estimated at 3'649.95 CHF/pc excl. VAT in the canton of Jura, with a range of 3'102.45 to 4'562.40 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 3'882.90 CHF/pc.

Which collective agreement applies to metalwork in the canton of Jura?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 19; the collective agreement that applies in the canton of Jura must be checked with your trade association.

See also

CFC 272 metalwork prices in the other cantons

See also the CFC 272 prices: Vaud (coefficient 1.00, skilled worker 113.00 CHF/h), Geneva (coefficient 1.12, skilled worker 126.55 CHF/h), Valais (coefficient 0.95, skilled worker 107.35 CHF/h), Fribourg (coefficient 0.98, skilled worker 110.75 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 109.60 CHF/h), Bern (coefficient 1.02, skilled worker 115.25 CHF/h).

Other trades in the canton of Jura

Hub tools and pack for this trade

Price this chapter in Soumission. The 725 items of ACIP chapter no. 19, adjusted for the canton, directly in your quotes. Discover Soumission