CFC 224 Roofing prices in the canton of Geneva — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Roofing (tiles, slate, fibre cement)” (CFC 224.0) for the canton of Geneva. ACIP chapter no. 11 contains 262 entries, of which 213 are priced items in Swiss francs, excluding VAT (HT), spread over 13 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 148.10 CHF/h on a daywork basis.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker148.10CHF/h
- Foreman / team leadern/aCHF/h
- Helper121.80CHF/h
- Apprenticen/aCHF/h
- Regional ACIP coefficient1.12Geneva
Prices of the key items of CFC 224 roofing in the canton of Geneva
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Battens COU-LA-0190 · Carrying out ventilation counter-battening with battens of forty-five by fifty millimetres and a spacing of… | m² | 15.35 | 18.05 | 22.55 | — | |
| Fibre-cement facade cladding COU-RF-0320 · Supply and laying of edge trim of two hundred and fifty millimetres for corrugated fibre-cement facade in… | ml | 107.65 | 126.65 | 158.35 | — | |
| Fibre-cement roofing COU-CF-0010 · Carrying out a double-lap roofing on boarding without battens or counter-battens in fibre-cement slates in standard colour of… | m² | 128.85 | 151.60 | 189.50 | — | |
| Corrugated fibre cement COU-FC-0200 · Supply and laying of a top flashing for corrugated fibre-cement roofing in coloured finish | ml | 98.10 | 115.40 | 144.25 | — | |
| Flemish or double-interlocking tile roofing COU-CO-0200 · Reworking of a roof with the existing Flemish tiles as double-interlocking tiles, including the replacement of the… | m² | 80.85 | 95.15 | 118.95 | — | |
| Plain tile roofing COU-CT-0220 · Reworking of a roof in existing plain tiles in double-lap roofing with replacement of the battens of twenty-four… | m² | 135.10 | 158.95 | 198.65 | — | |
| Slate roofing COU-CA-0010 · Carrying out a double-lap roofing in natural slate of the grey-blue natural slate type of four hundred and five by two… | m² | 280.15 | 329.60 | 412.00 | — | |
| Concrete roofing COU-CB-0060 · Carrying out roofing in sanded Flemish concrete tiles including battening of twenty-seven by forty millimetres… | m² | 100.75 | 118.55 | 148.20 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 11 (ACIP code shown); the family has 21 entries for the first item. The 213 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Geneva)
- Average hourly rate observed (skilled worker)
- 148.10 CHF/h
- Regional ACIP coefficient
- 1.12
- Range of the chapter's rates (from helper to foreman)
- 121.80 to 148.10 CHF/h
- Hub reference agreement
- not linked
- Wage zone of the ACIP reference: Red.
- Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
- This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 11. The applicable collective agreement must be checked with your trade association.
- Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
- The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 11 (Roofing) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 224.0 (CFC) and 363 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 224 roofing (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: roofing in the canton of Geneva
What is the daywork hourly rate for roofing in the canton of Geneva?
According to the 2026 ACIP price list, a skilled worker is charged 148.10 CHF/h on a daywork basis in the canton of Geneva and a helper 121.80 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 11 multiplied by the regional coefficient 1.12.
What is the regional ACIP coefficient for Geneva?
The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Battens” cost in the canton of Geneva?
The ACIP item COU-LA-0190 (Battens, unit m²) is estimated at 18.05 CHF/m² excl. VAT in the canton of Geneva, with a range of 15.35 to 22.55 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 16.10 CHF/m².
Which collective agreement applies to roofing in the canton of Geneva?
The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 11; the collective agreement that applies in the canton of Geneva must be checked with your trade association.
See also
CFC 224 roofing prices in the other cantons
See also the CFC 224 prices: Vaud (coefficient 1.00, skilled worker 132.25 CHF/h), Valais (coefficient 0.95, skilled worker 125.65 CHF/h), Fribourg (coefficient 0.98, skilled worker 129.60 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 128.30 CHF/h), Jura (coefficient 0.94, skilled worker 124.30 CHF/h), Bern (coefficient 1.02, skilled worker 134.90 CHF/h).
Other trades in the canton of Geneva
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.10: 10. Roofing (Tiles/Slate)
- Downloadable pack: Quote & Bid Template by CFC
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
