Skip to content
Website
ACIP · Art Construction Price Index CFC 281 ACIP chapter no. 25 2026 edition

CFC 281 Parquet prices in the canton of Neuchâtel — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Parquet and wooden floors” (CFC 281) for the canton of Neuchâtel. ACIP chapter no. 25 contains 124 entries, of which 80 are priced items in Swiss francs, excluding VAT (HT), spread over 9 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Neuchâtel, the regional ACIP coefficient is 0.97 (cantonal modifier −3 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 114.50 CHF/h on a daywork basis and a foreman or team leader 126.75 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker114.50CHF/h
  • Foreman / team leader126.75CHF/h
  • Helpern/aCHF/h
  • Apprentice47.75CHF/h
  • Regional ACIP coefficient0.97Neuchâtel

Prices of the key items of CFC 281 parquet in the canton of Neuchâtel

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.97; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Boards PAR-LA-0460 · Supply and glued laying of engineered parquet with oak facing on a plywood base in straight boards of… m² 201.35 236.85 296.10 —
Wood mosaic PAR-MB-0040 · Supply and jointless glued laying over finely float-finished cement screed of an oak mosaic parquet… m² 87.55 103.00 128.75 —
Sanding and impregnation PAR-PI-0050 · Complete impregnation and sealing treatment of parquet floors including careful mechanical sanding with grits… m² 34.40 40.50 50.60 —
Battening PAR-LM-0030 · Supply and laying of a support false battening mechanically fixed by nailing with a powder-actuated tool on slab… m² 33.75 39.70 49.65 —
Dry screeds PAR-CP-0010 · Supply and glued laying on screed in straight boards of an engineered parquet with oak facing previously sanded… m² 154.05 181.25 226.55 —
Prefinished parquet PAR-PF-0010 · Supply and loose floating laying of an engineered parquet with oak facing previously sanded and impregnated in… m² 148.20 174.35 217.95 —
Boards PAR-LA-0450 · Supply and glued laying of engineered parquet with oak facing on a plywood base in straight boards of… m² 165.20 194.35 242.90 —
Wood mosaic PAR-MB-0020 · Supply and jointless glued laying over finely float-finished cement screed of an oak mosaic parquet… m² 87.20 102.60 128.20 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 25 (ACIP code shown); the family has 44 entries for the first item. The 80 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Neuchâtel)

Average hourly rate observed (skilled worker)
114.50 CHF/h
Regional ACIP coefficient
0.97
Range of the chapter's rates (from helper to foreman)
114.50 to 126.75 CHF/h
Hub reference agreement
collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,1 % for structural work, 25,1 % for finishing work and building services; family allowance rate (CAF): 2,75 %.
  • Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Neuchâtel (city) −2 %, La Chaux-de-Fonds −4 %.

Source: ACIP 2026 workbook no. 25 (Parquet) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 281 (CFC) and 664 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 281 parquet (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: parquet in the canton of Neuchâtel

What is the daywork hourly rate for parquet in the canton of Neuchâtel?

According to the 2026 ACIP price list, a skilled worker is charged 114.50 CHF/h on a daywork basis in the canton of Neuchâtel and a foreman or team leader 126.75 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 25 multiplied by the regional coefficient 0.97.

What is the regional ACIP coefficient for Neuchâtel?

The ACIP coefficient of Neuchâtel is 0.97 (cantonal modifier −3 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Jura 0.94, Bern 1.02.

How much does the item “Boards” cost in the canton of Neuchâtel?

The ACIP item PAR-LA-0460 (Boards, unit m²) is estimated at 236.85 CHF/m² excl. VAT in the canton of Neuchâtel, with a range of 201.35 to 296.10 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 244.20 CHF/m².

Which collective agreement applies to parquet in the canton of Neuchâtel?

The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Neuchâtel, the wage zone shown is “Red” and the reference employer charges are 25,1 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 281 parquet prices in the other cantons

See also the CFC 281 prices: Vaud (coefficient 1.00, skilled worker 118.05 CHF/h), Geneva (coefficient 1.12, skilled worker 132.20 CHF/h), Valais (coefficient 0.95, skilled worker 112.15 CHF/h), Fribourg (coefficient 0.98, skilled worker 115.70 CHF/h), Jura (coefficient 0.94, skilled worker 110.95 CHF/h), Bern (coefficient 1.02, skilled worker 120.40 CHF/h).

Other trades in the canton of Neuchâtel

Hub tools and pack for this trade

Price this chapter in Soumission. The 80 items of ACIP chapter no. 25, adjusted for the canton, directly in your quotes. Discover Soumission