Skip to content
Website
ACIP · Art Construction Price Index CFC 211.1 ACIP chapter no. 4 2026 edition

CFC 211 Scaffolding prices in the canton of Neuchâtel — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Facade and roof scaffolding” (CFC 211.1) for the canton of Neuchâtel. ACIP chapter no. 4 contains 58 entries, of which 31 are priced items in Swiss francs, excluding VAT (HT), spread over 6 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Neuchâtel, the regional ACIP coefficient is 0.97 (cantonal modifier −3 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 114.95 CHF/h on a daywork basis and a foreman or team leader 134.60 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker114.95CHF/h
  • Foreman / team leader134.60CHF/h
  • Helpern/aCHF/h
  • Apprentice46.55CHF/h
  • Regional ACIP coefficient0.97Neuchâtel

Prices of the key items of CFC 211 scaffolding in the canton of Neuchâtel

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.97; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Facade scaffolding ECH-EF-0060 · Light tubular-frame scaffolding for painting work, useful width of sixty centimetres, useful load of… m² 24.20 28.45 35.60 —
Temporary roofs ECH-TP-0040 · Erection, two-month hire and removal of a temporary timber roof under plastic sheeting on rafters, without boarding… m² 139.95 164.65 205.80 —
Cornices and mobile scaffold towers ECH-CT-0080 · Provision of a protected passage, pedestrian protection tunnel at the foot of the scaffolding, ceiling rate ml 219.95 258.75 323.45 —
Facade scaffolding ECH-EF-0190 · Installation of inclined access ladders fitted with handrails and a hinged starting element ml 48.45 57.00 71.25 —
Facade scaffolding ECH-EF-0130 · Light scaffolding with timber poles and metal brackets for painting, useful width of sixty centimetres, load… m² 20.75 24.40 30.50 —
Temporary roofs ECH-TP-0090 · Installation of a protective screen in reed matting or nylon netting with frame intended for the temporary roof, rate… m² 41.45 48.75 60.95 —
Temporary roofs ECH-TP-0050 · Erection, two-month hire and removal of a temporary timber roof under plastic sheeting on rafters, without boarding… m² 161.00 189.40 236.75 —
Facade scaffolding ECH-EF-0220 · Protective front or side sheeting of the scaffolding with tarpaulin or plastic sheet m² 14.60 17.15 21.45 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 4 (ACIP code shown); the family has 10 entries for the first item. The 31 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Neuchâtel)

Average hourly rate observed (skilled worker)
114.95 CHF/h
Regional ACIP coefficient
0.97
Range of the chapter's rates (from helper to foreman)
114.95 to 134.60 CHF/h
Hub reference agreement
National Agreement for the Structural Building Trades (CN)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,1 % for structural work, 25,1 % for finishing work and building services; family allowance rate (CAF): 2,75 %.
  • Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Neuchâtel (city) −2 %, La Chaux-de-Fonds −4 %.

Source: ACIP 2026 workbook no. 4 (Scaffolding) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 211.1 (CFC) and 114 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 211 scaffolding (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: scaffolding in the canton of Neuchâtel

What is the daywork hourly rate for scaffolding in the canton of Neuchâtel?

According to the 2026 ACIP price list, a skilled worker is charged 114.95 CHF/h on a daywork basis in the canton of Neuchâtel and a foreman or team leader 134.60 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 4 multiplied by the regional coefficient 0.97.

What is the regional ACIP coefficient for Neuchâtel?

The ACIP coefficient of Neuchâtel is 0.97 (cantonal modifier −3 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Jura 0.94, Bern 1.02.

How much does the item “Facade scaffolding” cost in the canton of Neuchâtel?

The ACIP item ECH-EF-0060 (Facade scaffolding, unit m²) is estimated at 28.45 CHF/m² excl. VAT in the canton of Neuchâtel, with a range of 24.20 to 35.60 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 29.35 CHF/m².

Which collective agreement applies to scaffolding in the canton of Neuchâtel?

The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Neuchâtel, the wage zone shown is “Red” and the reference employer charges are 34,1 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 211 scaffolding prices in the other cantons

See also the CFC 211 prices: Vaud (coefficient 1.00, skilled worker 118.50 CHF/h), Geneva (coefficient 1.12, skilled worker 132.70 CHF/h), Valais (coefficient 0.95, skilled worker 112.60 CHF/h), Fribourg (coefficient 0.98, skilled worker 116.15 CHF/h), Jura (coefficient 0.94, skilled worker 111.40 CHF/h), Bern (coefficient 1.02, skilled worker 120.85 CHF/h).

Other trades in the canton of Neuchâtel

Hub tools and pack for this trade

Price this chapter in Soumission. The 31 items of ACIP chapter no. 4, adjusted for the canton, directly in your quotes. Discover Soumission