CFC 281 Tiles and ceramics prices in the canton of Neuchâtel — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Tiles and ceramic coverings” (CFC 281.6 / 282) for the canton of Neuchâtel. ACIP chapter no. 24 contains 223 entries, of which 101 are priced items in Swiss francs, excluding VAT (HT), spread over 8 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Neuchâtel, the regional ACIP coefficient is 0.97 (cantonal modifier −3 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 95.70 CHF/h on a daywork basis and a foreman or team leader 100.75 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker95.70CHF/h
- Foreman / team leader100.75CHF/h
- Helper93.10CHF/h
- Apprentice45.65CHF/h
- Regional ACIP coefficient0.97Neuchâtel
Prices of the key items of CFC 281 tiles and ceramics in the canton of Neuchâtel
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.97; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Preparatory work for measurement CAR-PR-0280 · Water- and oil-repellent protective treatment by penetrating impregnation on coverings in stoneware, natural stone… | m² | 39.15 | 46.10 | 57.60 | — | |
| Skirting boards CAR-PL-0070 · Straight laying with adhesive of a natural stone skirting with a height less than or equal to ten centimetres… | ml | 20.80 | 24.50 | 30.60 | — | |
| Miscellaneous work CAR-DV-0190 · Construction and fitting of the apron panelling of the transverse side of a bath over a width of seventy… | pc | 135.25 | 159.15 | 198.90 | — | |
| Stair treads CAR-ME-0010 · Glued laying of a straight stair tread and its riser in ceramic tiles of thirty centimetres by… | ml | 84.00 | 98.80 | 123.50 | — | |
| Tiling, floors and walls CAR-CS-0070 · Straight laying of floor tiling in thin bed with normal tile adhesive mortar for tiles of a format larger than ten… | m² | 70.60 | 83.05 | 103.80 | — | |
| Miscellaneous work CAR-DV-0310 · Supply and laying of an aluminium edge finishing and protection profile with a height less than or equal to… | ml | 39.10 | 46.05 | 57.55 | — | |
| Preparatory work for measurement CAR-PR-0190 · Supply and fitting of temporary mechanical protection on straight stair treads by means of boards… | ml | 31.80 | 37.40 | 46.75 | — | |
| Preparatory work for measurement CAR-PR-0180 · Supply and fitting of temporary mechanical protection of finished floors by means of wood-fibre boards… | m² | 19.85 | 23.35 | 29.15 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 24 (ACIP code shown); the family has 26 entries for the first item. The 101 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Neuchâtel)
- Average hourly rate observed (skilled worker)
- 95.70 CHF/h
- Regional ACIP coefficient
- 0.97
- Range of the chapter's rates (from helper to foreman)
- 93.10 to 100.75 CHF/h
- Hub reference agreement
- collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
- Wage zone of the ACIP reference: Red.
- Reference employer charges: 34,1 % for structural work, 25,1 % for finishing work and building services; family allowance rate (CAF): 2,75 %.
- Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Neuchâtel (city) −2 %, La Chaux-de-Fonds −4 %.
Source: ACIP 2026 workbook no. 24 (Tiles coverings) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 281.6, 282 (CFC) and 671 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 281 tiles and ceramics (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: tiles and ceramics in the canton of Neuchâtel
What is the daywork hourly rate for tiles and ceramics in the canton of Neuchâtel?
According to the 2026 ACIP price list, a skilled worker is charged 95.70 CHF/h on a daywork basis in the canton of Neuchâtel, a foreman or team leader 100.75 CHF/h and a helper 93.10 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 24 multiplied by the regional coefficient 0.97.
What is the regional ACIP coefficient for Neuchâtel?
The ACIP coefficient of Neuchâtel is 0.97 (cantonal modifier −3 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Jura 0.94, Bern 1.02.
How much does the item “Preparatory work for measurement” cost in the canton of Neuchâtel?
The ACIP item CAR-PR-0280 (Preparatory work for measurement, unit m²) is estimated at 46.10 CHF/m² excl. VAT in the canton of Neuchâtel, with a range of 39.15 to 57.60 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 47.50 CHF/m².
Which collective agreement applies to tiles and ceramics in the canton of Neuchâtel?
The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Neuchâtel, the wage zone shown is “Red” and the reference employer charges are 25,1 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 281 tiles and ceramics prices in the other cantons
See also the CFC 281 prices: Vaud (coefficient 1.00, skilled worker 98.65 CHF/h), Geneva (coefficient 1.12, skilled worker 110.50 CHF/h), Valais (coefficient 0.95, skilled worker 93.70 CHF/h), Fribourg (coefficient 0.98, skilled worker 96.70 CHF/h), Jura (coefficient 0.94, skilled worker 92.75 CHF/h), Bern (coefficient 1.02, skilled worker 100.60 CHF/h).
Other trades in the canton of Neuchâtel
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.23: 23. Tiling & Ceramics
- Downloadable pack: Notice of Defects & Duty to Notify Templates (Art. 25 SIA 118)
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
