ACIP · Art Construction Price Index CFC 281 ACIP chapter no. 22 2026 edition

CFC 281 Floor coverings prices in the canton of Neuchâtel — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Floor coverings (linoleum, synthetic, cork)” (CFC 281) for the canton of Neuchâtel. ACIP chapter no. 22 contains 296 entries, of which 223 are priced items in Swiss francs, excluding VAT (HT), spread over 11 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Neuchâtel, the regional ACIP coefficient is 0.97 (cantonal modifier −3 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 97.80 CHF/h on a daywork basis.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker97.80CHF/h
  • Foreman / team leadern/aCHF/h
  • Helper76.40CHF/h
  • Apprentice47.75CHF/h
  • Regional ACIP coefficient0.97Neuchâtel

Prices of the key items of CFC 281 floor coverings in the canton of Neuchâtel

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.97; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Special paving SOL-DS-0310 · Carrying out on a sound concrete substrate a monolithic wearing screed of the second class with a thickness of twenty-five to… m² 54.45 64.05 80.10 —
Linoleum and synthetic floors SOL-LS-0030 · Supply and glued laying of natural linoleum floor covering with marbled decor in rolls of two hundred centimetres of… m² 77.65 91.35 114.20 —
Wood block paving SOL-PB-0060 · Supply and laying of industrial end-grain wood paving, not impregnated, planed on all four faces, with a height of six… m² 109.75 129.10 161.40 —
Resilient flooring for gymnasiums and multipurpose halls SOL-RS-0050 · Supply and laying of a jointless resilient sports floor covering with a total thickness of seventeen millimetres… m² 130.85 153.95 192.40 —
Underlays SOL-CO-0030 · Supply and glued laying of an insulating lower layer in cork agglomerate on roll jute cloth of two… m² 53.70 63.20 79.00 —
Cork parquet SOL-PL-0010 · Supply and glued laying over a cement screed of cork parquet with fine natural grain coated with a layer… m² 96.00 112.95 141.20 —
Special paving SOL-DS-0320 · Application over stair treads of a cement mortar finish with extra-hard mineral aggregates of… ml 103.95 122.30 152.90 —
Special paving SOL-DS-0300 · Carrying out on a sound concrete substrate a monolithic wearing screed of the second class with a thickness of twenty-five to… m² 35.95 42.30 52.85 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 22 (ACIP code shown); the family has 74 entries for the first item. The 223 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Neuchâtel)

Average hourly rate observed (skilled worker)
97.80 CHF/h
Regional ACIP coefficient
0.97
Range of the chapter's rates (from helper to foreman)
76.40 to 97.80 CHF/h
Hub reference agreement
collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,1 % for structural work, 25,1 % for finishing work and building services; family allowance rate (CAF): 2,75 %.
  • Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Neuchâtel (city) −2 %, La Chaux-de-Fonds −4 %.

Source: ACIP 2026 workbook no. 22 (Floor coverings) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 281 (CFC) and 664, 651 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 281 floor coverings (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: floor coverings in the canton of Neuchâtel

What is the daywork hourly rate for floor coverings in the canton of Neuchâtel?

According to the 2026 ACIP price list, a skilled worker is charged 97.80 CHF/h on a daywork basis in the canton of Neuchâtel and a helper 76.40 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 22 multiplied by the regional coefficient 0.97.

What is the regional ACIP coefficient for Neuchâtel?

The ACIP coefficient of Neuchâtel is 0.97 (cantonal modifier −3 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Jura 0.94, Bern 1.02.

How much does the item “Special paving” cost in the canton of Neuchâtel?

The ACIP item SOL-DS-0310 (Special paving, unit m²) is estimated at 64.05 CHF/m² excl. VAT in the canton of Neuchâtel, with a range of 54.45 to 80.10 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 66.05 CHF/m².

Which collective agreement applies to floor coverings in the canton of Neuchâtel?

The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Neuchâtel, the wage zone shown is “Red” and the reference employer charges are 25,1 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 281 floor coverings prices in the other cantons

See also the CFC 281 prices: Vaud (coefficient 1.00, skilled worker 100.80 CHF/h), Geneva (coefficient 1.12, skilled worker 112.90 CHF/h), Valais (coefficient 0.95, skilled worker 95.75 CHF/h), Fribourg (coefficient 0.98, skilled worker 98.80 CHF/h), Jura (coefficient 0.94, skilled worker 94.75 CHF/h), Bern (coefficient 1.02, skilled worker 102.80 CHF/h).

Other trades in the canton of Neuchâtel

Hub tools and pack for this trade

Price this chapter in Soumission. The 223 items of ACIP chapter no. 22, adjusted for the canton, directly in your quotes. Discover Soumission