CFC 201 Earthworks prices in the canton of Neuchâtel — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Earthworks and excavations” (CFC 201) for the canton of Neuchâtel. ACIP chapter no. 3 contains 121 entries, of which 86 are priced items in Swiss francs, excluding VAT (HT), spread over 8 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Neuchâtel, the regional ACIP coefficient is 0.97 (cantonal modifier −3 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 94.45 CHF/h on a daywork basis and a foreman or team leader 131.10 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker94.45CHF/h
- Foreman / team leader131.10CHF/h
- Helper84.60CHF/h
- Apprentice50.90CHF/h
- Regional ACIP coefficient0.97Neuchâtel
Prices of the key items of CFC 201 earthworks in the canton of Neuchâtel
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.97; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Protection and shoring TER-PT-0120 · Propped close-boarded shoring for an isolated pit measuring one metre fifty by one metre fifty and a depth of… | m² | 44.10 | 51.90 | 64.85 | — | |
| Trench excavations TER-FT-0030 · Mechanical excavation of an unshored trench with vertical walls, depth of two metres one to three metres | m³ | 32.40 | 38.10 | 47.65 | — | |
| Backfilling and finishing TER-RF-0010 · Mechanical backfilling and compaction of trenches or excavations with the excavated materials | m³ | 15.75 | 18.55 | 23.15 | — | |
| Transport and fees TER-TT-0040 · Removal and transport of unpolluted topsoil to the tip site, excluding tipping fees | m³ | 15.15 | 17.80 | 22.25 | — | |
| Topsoil stripping TER-DT-0020 · Mechanical stripping of the topsoil layer over a width of between two metres one and five metres | m³ | 6.00 | 7.10 | 8.85 | — | |
| Excavations TER-FO-0020 · Mechanical excavation of an isolated pit for foundations or manholes, without shoring, depth of one metre fifty and… | m³ | 30.75 | 36.20 | 45.25 | — | |
| Underpinning TER-RO-0020 · Excavation in stages under existing foundations with loading into skips, stage of one cubic metre twenty-six to two cubic metres… | m³ | 154.60 | 181.90 | 227.35 | — | |
| Backfilling and finishing TER-RF-0150 · Mechanical placing of topsoil, maximum thickness of thirty centimetres, over a width of up to two metres | m² | 4.25 | 5.00 | 6.25 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 3 (ACIP code shown); the family has 17 entries for the first item. The 86 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Neuchâtel)
- Average hourly rate observed (skilled worker)
- 94.45 CHF/h
- Regional ACIP coefficient
- 0.97
- Range of the chapter's rates (from helper to foreman)
- 84.60 to 131.10 CHF/h
- Hub reference agreement
- National Agreement for the Structural Building Trades (CN)
- Wage zone of the ACIP reference: Red.
- Reference employer charges: 34,1 % for structural work, 25,1 % for finishing work and building services; family allowance rate (CAF): 2,75 %.
- Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Neuchâtel (city) −2 %, La Chaux-de-Fonds −4 %.
- Workbook 3 has no daywork section: rates from workbook 29 (Civil engineering), foreman, machine operator, building worker, apprentice.
Source: ACIP 2026 workbook no. 3 (Earthworks) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 201 (CFC) and 211 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 201 earthworks (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: earthworks in the canton of Neuchâtel
What is the daywork hourly rate for earthworks in the canton of Neuchâtel?
According to the 2026 ACIP price list, a skilled worker is charged 94.45 CHF/h on a daywork basis in the canton of Neuchâtel, a foreman or team leader 131.10 CHF/h and a helper 84.60 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 3 multiplied by the regional coefficient 0.97.
What is the regional ACIP coefficient for Neuchâtel?
The ACIP coefficient of Neuchâtel is 0.97 (cantonal modifier −3 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Jura 0.94, Bern 1.02.
How much does the item “Protection and shoring” cost in the canton of Neuchâtel?
The ACIP item TER-PT-0120 (Protection and shoring, unit m²) is estimated at 51.90 CHF/m² excl. VAT in the canton of Neuchâtel, with a range of 44.10 to 64.85 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 53.50 CHF/m².
Which collective agreement applies to earthworks in the canton of Neuchâtel?
The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Neuchâtel, the wage zone shown is “Red” and the reference employer charges are 34,1 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 201 earthworks prices in the other cantons
See also the CFC 201 prices: Vaud (coefficient 1.00, skilled worker 97.35 CHF/h), Geneva (coefficient 1.12, skilled worker 109.05 CHF/h), Valais (coefficient 0.95, skilled worker 92.50 CHF/h), Fribourg (coefficient 0.98, skilled worker 95.40 CHF/h), Jura (coefficient 0.94, skilled worker 91.50 CHF/h), Bern (coefficient 1.02, skilled worker 99.30 CHF/h).
Other trades in the canton of Neuchâtel
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.03: 03. Earthworks & Excavations
- Downloadable pack: Geotechnical Reservation & Unforeseen Excavation Conditions Pack
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.