Waterproofer checks, damage and safety: the execution reference framework

Intended for site managers, foremen and team leaders, this section brings together quality assurance protocols and essential safety rules for flat roof waterproofing according to standard SIA 271. It addresses test methods prior to ballasting, leak detection under heavy surfacing, contractual damage management, and vital prevention against falls and fires during blowtorch work.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

OTConst art. 23

2 m

Fall height triggering mandatory collective protection

OTConst art. 22

100 cm

Minimum height of the top rail of perimeter edge protection

OTConst art. 22

15 cm

Minimum height of the toeboard on construction site edge protection

norme SIA 118

2 years

Notice period for apparent defects under standard contract

Technical scope of inspection and safety in waterproofing

This section is addressed to building professionals carrying out the waterproofing of flat roofs, terraces, green roofs, interior courtyards and underground structures according to CFC 226. It focuses on the means to prove the perfect execution of the membrane before covering, the non-destructive investigation of leaks on insulated assemblies, as well as preserving the health and lives of waterproofers on the construction site.

  • Integrity testing protocols using wet testing or spark testers prior to laying protective layers.
  • Diagnostics and tracing of water paths under gravel or greening using tracer gas, smoke or electrical pulses.
  • Organisational and technical fire prevention measures during the use of naked flames and gas blowtorches.
  • Collective and individual fall protection systems along roof edges and at roof openings.
  • Survey procedures, leak inspection records, preservation of recourse rights and management of penetrations caused by secondary trades.

Operational sequence structure: from inspection to long-term performance

The organisation of the ten chapters follows the chronological sequence of technical interventions on the structure. The initial chapters deal with the validation of the new membrane by electrical surface testing, guaranteeing the absence of porosity before applying ballast or greening layers, thus avoiding later destructive interventions.

The remainder details securing the team against the trade's two major hazards: working with flames and unprotected edges. The rigorous implementation of the hot work permit, thermal monitoring after flame extinction, and the erection of temporary edge protection respond directly to accident prevention requirements. These measures prevent smouldering fires in combustible insulation and make walkways around skylight openings safe.

The damage and defect component then guides the foreman in managing a reported water leak, from temporary weatherproofing to drafting an enforceable joint inspection record in accordance with standard SIA 118. It clarifies responsibilities in the event of mechanical damage caused by third parties working subsequently, particularly during the anchoring of permanent railings or photovoltaic structures.

Finally, the last part centres on the durability of the structure and occupational hygiene. It provides the framework for periodic maintenance essential for extending the warranty, complete archiving of the as-built documentation file, and means to reduce applicators' respiratory exposure to bitumen fumes and bonding solvents.

📘 Chapters in this section 10

Checks, damage claims and safety for the waterproofer

Finding a leak beneath a protective layer: tracer gas, zone flooding and electrical testing

Pinpoint invisible water paths accurately without removing all gravel or growing medium.

Checks, damage claims and safety for the waterproofer

Electrical integrity testing: test the full surface before laying protection

Confirm the absolute watertightness of the new membrane by spark testing before backfilling or ballasting.

Checks, damage claims and safety for the waterproofer

Blowtorch work: hot work permit, stationed fire extinguishers, and post-extinction watch

Master the hot work permit and organise thermal watch rounds to eliminate fire hazards.

Checks, damage claims and safety for the waterproofer

Flat roof edge: low parapet, temporary guard rail and lifeline

Protect low roof edges and demarcate construction site walkways in accordance with applicable legal requirements.

Checks, damage claims and safety for the waterproofer

Rooflights and domes: falling through, and how to prevent it

Protect fragile roof openings against the fatal risk of falling through the parapet line.

Checks, damage claims and safety for the waterproofer

Infiltration detected: record, safety measures and sharing of liabilities

Document the water ingress, secure the premises immediately, and safeguard your rights vis-à-vis other trades.

Checks, damage claims and safety for the waterproofer

Another trade has drilled through: impact on warranty and repair

Defend the validity of your warranty when a secondary trade punctures your waterproofing system.

Checks, damage claims and safety for the waterproofer

Lifespan of waterproofing: what extends it, what shortens it, and the annual inspection

Schedule regular servicing of upstands and outlets to double the roof's service life.

Checks, damage claims and safety for the waterproofer

Waterproofing file: as-built drawings, membrane offcuts and technical data sheets

Compile comprehensive as-built records ensuring material traceability and facilitating future refurbishment.

Checks, damage claims and safety for the waterproofer

Bitumen fumes and solvents: ventilation, respiratory and skin protection

Adopt appropriate filtering equipment and ventilate work stations to eliminate inhalation of hot fumes.