Skip to content
Website
🧱 CFC 226Upstands and special detailingChapter 8 of 10 in the section

Upstand against an existing wall: chase, clamping profile and differential movement

This technical chapter guides you through creating waterproofing upstands against an existing masonry or concrete wall. You will learn how to manage differential movements between the vertical substrate and the flat roof, cut the chase according to trade best practice, install the appropriate clamping profile, and ensure the durable watertightness of the upper junction.

Key takeaways

  • Isolate the waterproofing upstand to absorb differential settlement and thermal expansion of the structural work.
  • Comply with the minimum junction heights specified by standard SIA 271 above the wearing layer.
  • Cut a downward-sloping chase to house the profile or shed infiltrating water.
  • Mechanically fix the clamping profile and then seal the joint with a suitable sealant.

Isolate the upstand to absorb differential movements between roof and existing wall

When connecting a flat roof against an existing facade wall, the insulation and load-bearing assembly never behaves like the supporting wall. The roof slab undergoes continuous dimensional variations caused by seasonal thermal shocks, deferred concrete shrinkage and variable live loads. Opposite it, the existing wall, often founded differently or already stabilised in its settlement, presents a distinct static stiffness. If the bituminous or synthetic membrane is fully bonded without precaution at the junction between the horizontal plane and the vertical upstand, shear stresses inevitably cause the assembly to tear at the corner.

According to standard SIA 271, the transition between the roof and the vertical element requires special attention regarding the kinematics of the elements in contact. The flat roofer must distinguish a continuous substrate from a discontinuous substrate. Against an existing wall made of clay brick masonry or cement blocks, surface roughness, joint irregularity and the potential presence of old render require meticulous preparation. Any non-adherent coating must be removed using a flat chisel prior to applying the cold primer.

  • Differential foundation settlement between the main building and the new flat roof.
  • Linear thermal expansion of the horizontal concrete slab under direct solar radiation.
  • Deflection of the load-bearing structure under temporary climatic snow loads.
  • Vibrations transmitted by technical installations on the roof or by external traffic.

To neutralise these stresses, the waterproofing upstand must be able to accommodate horizontal and vertical movements. An angle strip bridging the theoretical corner crack is applied, fixed or welded only in the areas provided for this purpose, leaving an unbonded neutral zone at the heel. When the wall presents a powdery or heterogeneous surface, installing a metal backing sheet mechanically fixed to the structural work provides the ideal substrate to receive the bituminous or synthetic waterproofing.

Cut the chase, fix the clamping profile and seal the junction according to standard SIA 271

The top termination of the upstand prevents run-off water from infiltrating behind the waterproofing sheet. Two main techniques govern this junction: a direct chase with a recessed profile, or a surface-mounted clamping profile supplemented by a sealed joint or a protective drip edge. Standard SIA 271 sets the minimum height of the upstand above the finished protective or wearing layer, in order to protect the structure against snow accumulation and splashing precipitation.

To cut a chase in solid masonry or a concrete wall, the flat roofer uses a twin-blade diamond wall chaser coupled with an industrial vacuum cleaner to comply with the requirements of the construction work ordinance regarding health protection. The groove must have a minimum depth of twenty millimetres and a slight upward inward slope to shed water towards the outside.

  1. Marking and sawing the chaseMark the level line with chalk respecting the water clearance. Chase the masonry to a depth of twenty millimetres with a downward inclination.
  2. Installation and fixing of the membraneDress the membrane up to the required height, insert it into the groove or bring it flush depending on the chosen metal profile, then smooth down thoroughly.
  3. Installation of the clamping profilePosition the pre-drilled extruded aluminium profile. Mechanically fix it using hammer-in anchors spaced at two hundred millimetres maximum.
  4. Sealing the elastomeric jointRemove dust from the recess, insert a synthetic backing rod if necessary and extrude a hybrid or polyurethane sealant smoothed with a suitable solution.

When the condition of the existing wall does not permit sawing a chase, a surface-mounted clamping profile equipped with a receiving groove is the standard alternative. The profile must have sufficient stiffness to exert continuous linear pressure between mechanical fixings. Insufficient clamping leads to gaps through which moisture penetrates by capillarity. The sealant applied at the top does not replace mechanical retention; it serves solely as a watertight seal to channel facade run-off.

Clamping profile design and junction kinematics

The connection between the horizontal waterproofing assembly and an existing vertical wall constitutes a zone of permanent mechanical stress. The two structures work asynchronously: the vertical structural work undergoes differential settlement and slow shrinkage, while the roof slab and thermal insulation expand under the effect of seasonal and daily temperature ranges. A rigidly bonded junction or one torched directly against old masonry inevitably ends up shearing or peeling under repeated tensile forces. The flat roofer must therefore design a decoupled system that ensures the mechanical retention of the upper edge of the waterproofing membrane while absorbing micro-movements without rupture or infiltration.

To neutralise these stresses without degrading the bituminous or synthetic sheets, standard SIA 271 imposes strict decoupling principles at the horizontal-vertical junction. The extruded aluminium clamping profile fulfils a precise technical role: it continuously presses the upper edge of the waterproofing against the masonry while maintaining constant pressure along the anchoring line. However, the profile itself undergoes thermal expansion of its own, which must be accommodated so as not to shear the mechanical fixings or damage the sealant bead at the top.

  • Slotted hole profiles: the machined slotted holes allow longitudinal sliding of the metal strip without bending the anchor bodies under the effect of summer sun.
  • Expansion joint between lengths: a 3 to 5 mm gap left between each length of profile prevents buckling or destructive overlapping.
  • Calibrated anchor spacing: fixings are positioned at a maximum spacing of 200 mm to eliminate any gaping of the clamping strip between two consecutive anchors.
  • Cellular separation strip: an EPDM foam elastomeric gasket placed on the back of the profile compensates for irregularities in the structural work and distributes the load without piercing the membrane.

Chasing protocol, elastomeric caulking and tolerances

  1. Mechanical chasing of the substrateUsing a wall chaser equipped with a twin diamond blade and integrated extraction, cut a clean horizontal groove 15 to 20 mm deep, sloping downwards to shed run-off water. Clear dust from the slot using compressed air.
  2. Mechanical fixing of the clamping profilePosition the profile equipped with its groove below the chase, clamping the previously dressed waterproofing membrane. Insert suitable anchors for the masonry into the slotted holes, observing the tightening torque without crushing the metal.
  3. Installation of the cellular backing rodCompress a round closed-cell polyethylene foam rod with a diameter 25% larger than the width of the slot into the bottom of the groove or chase. This backing rod prevents three-sided adhesion of the sealant.
  4. Sealing with elastomeric sealant and smoothingInject a weather-resistant polyurethane or MS polymer sealant. Immediately smooth the bead with a spatula to a slightly recessed profile to channel water without creating a retaining lip.

On old masonry coated with render or mineral plaster, the chase must never be cut solely in the surface layer. Mechanical cutting must imperatively penetrate the sound load-bearing material, brick or concrete, to prevent any water percolation by capillarity behind the upstand. The site supervisor checks the straightness of the cut line with a chalk line to prevent any low points. At internal and external corners, metal profiles must be mitred with a free gap of at least 5 mm to absorb corner expansions without plastic deformation.

Selection of fixings and chasing techniques according to the vertical substrate
Nature of the existing wallRecommended anchoring systemJunction at top of waterproofing
Shuttered reinforced concreteConcrete screws without plugs or stainless steel hammer-in anchors at 200 mm centresChase cut into concrete, backing rod and smoothed elastomeric bead
Clay brick masonryLong universal collared frame plugs anchored into the brickChase cutting through render to bite into load-bearing clay brick
Aerated concrete or friable masonrySpecial self-tapping anchors or chemical anchoringDrip profile under reinforced chase or counter-flashing fixed into sound zone

Managing defects: cracking, shearing and pull-out at the upstand top

When an upstand against an existing wall undergoes abnormal stresses, failure appears quickly: sheared sealant bead, clamping profile buckled under thermal pressure, or membrane torn at the internal angle. These defects almost always result from an overly rigid connection between two structures subject to differential movement. The vertical masonry retains its inertia while the roof assembly expands or contracts, causing destructive shear.

  1. Diagnosis and securing of the areaRemove the distorted profile, eliminate degraded elastomeric sealant and inspect the integrity of the masonry. Measure the actual gap caused by the relative displacement of the two structural elements to dimension the remedial work.
  2. Refurbishment of the substrate and chaseGrind a new chase if the original edge has spalled. Clean the groove using industrial vacuum extraction and careful dusting. The depth must accommodate the upper lip of the profile while leaving sufficient space for the sealant bead.
  3. Insertion of an isolation stripReplace the torn membrane by inserting an isolated bridging strip at the corner junction. This arrangement neutralises the direct transfer of mechanical stresses to the rising upstand.
  4. Reinstallation of an appropriate profile and resealingFit an extruded aluminium clamping profile equipped with slotted holes to allow longitudinal sliding. Insert a round cellular foam backing rod into the chase, then extrude an elastomeric sealant smoothed without adhesion to the bottom of the groove.

If differential displacement exceeds the permissible tolerances of a clamping profile, the overall design must be reviewed with site management. The contractor applies art. 365 CO al. 3: if any circumstance compromises the proper or timely execution of the work, they must immediately inform the client. In cases of severe structural movement, only an independent flashing fixed to the wall, overlapping an upstand bonded to the slab, complies with the requirements of standard SIA 271.

Frequently asked questions

Why must the waterproofing upstand never be fully bonded to an existing wall?

Full bonding transmits all expansion or settlement stresses directly to the membrane. When the roof slab undergoes shrinkage or thermal expansion differing from the existing facade, the bituminous or synthetic assembly is sheared at its base or torn at the top. Partial isolation, completed by an upper mechanical clamping profile, allows these differential movements to be absorbed without causing the waterproofing sheet to tear.

What is the recommended depth for a chase in old masonry?

According to trade best practice and the recommendations of standard SIA 271, a chase cut into an existing wall must have a depth of 15 to 20 mm and a width of 8 to 10 mm. This dimension allows insertion of the profile's water-shedding lip, accommodation of a regular cellular backing rod, and application of a sufficient cross-section of sealant without risking weakening the substrate through excessive cutting.

What type of mechanical fixing should be used for the clamping profile on a deteriorated wall?

On heterogeneous masonry or old concrete, simple drive nails must be excluded. The use of nylon expansion plugs with A2 stainless steel screws or concrete screws without plugs ensures reliable anchoring. Spacing between fixings must not exceed 200 to 250 mm. Pre-machined slotted holes on the profile remain essential to allow sliding without distortion of the metal strip.

What should be done if the sealant in the chase debonds after one winter?

Early debonding often indicates the absence of a backing rod or a lack of adhesion primer on the concrete. The old bead must be removed, the edges of the chase cleaned with a wire brush and dusted. After inserting a polyethylene backing rod ensuring two-sided joint action only, apply the appropriate primer before extruding a new weather-resistant hybrid or polyurethane sealant.

Texts and standards cited

  • SIA 271Waterproofing of flat roofs, terraces and underground structures
  • CO art. 365Immediate notification of the client if any circumstance compromises the proper or timely execution of the work (al. 3)

In the same section