Key takeaways
- The minimum upstand height is always measured from the finished trafficable level.
- Standard SIA 271 prescribes a standard clearance of one hundred and fifty millimetres outside thresholds.
- Lowering to fifty millimetres strictly requires a channel with a direct discharge connection.
- Flush thresholds without an upstand require specific, watertight construction measures.
The rule in standard SIA 271: measure clearance from the finished trafficable layer
- Finished level (wearing course)
- Final upper surface of the accessible roof or terrace, including paving on pedestals, timber decking, slabs laid on a gravel bed, or heavy protective gravel on an inaccessible roof.
The recurring error on construction sites consists in measuring the height of the waterproofing upstand from the bare concrete substrate or from the waterproofing installation plane. This technical confusion produces major non-conformities during handover of the works. According to standard SIA 271, the minimum safety water clearance is strictly defined with respect to the top surface of the finished covering, that is to say the plane on which users walk or the top surface of the ballast gravel.
On an inverted roof or a conventional warm roof with slabs on forty-millimetre pedestals and dense thermal insulation, the waterproofing operative must incorporate the total thickness of the build-up into their initial layout. If the insulation measures one hundred and sixty millimetres and the finished paving culminates at two hundred and twenty millimetres above the structural slab, the bituminous or synthetic upstand against the parapet or party wall must rise to three hundred and seventy millimetres above the bare concrete to guarantee the useful one hundred and fifty millimetres clear of water.
| Upstand situation | Lower reference point | Required height (standard SIA 271) | Minimum technical arrangement |
|---|---|---|---|
| Standard parapet or party wall | Surface of finished slabs or gravel | 150 mm minimum | Mechanical fastening and metal flashing strip |
| Inaccessible gravelled roof | Upper level of gravel bed | 150 mm minimum | Clamped aluminium profile with waterproof mastic joint |
| Terrace with earth retention (green roof) | Finished topsoil level | 150 mm minimum | Root-resistant membrane and perforated retaining sheet |
| Standard French door threshold | Upper level of external tiling | 150 mm (general case) | Connection beneath joinery bottom rail |
Lowering at thresholds and compensation by gutter or drainage channel
In contemporary architecture and buildings subject to reduced mobility requirements (PMR), maintaining a drop of one hundred and fifty millimetres at terrace doors is frequently impossible. To avoid an insurmountable step between the living room and the exterior, standard SIA 271 permits specific derogations. This tolerance nevertheless imposes rigorous constructive compensations to neutralise standing water accumulation and backflow caused by wind.
- Reduction of clearance to 50 mm with a channelThe upstand height may be lowered to fifty millimetres above finished level if an open-grated drainage channel is placed immediately in front of the joinery. The grating must be removable to allow seasonal maintenance.
- Proper drainage of the channelThe channel cannot rely on simple infiltration beneath the slabs to discharge water. It must be provided with side slots or pipework connected to the secondary rainwater network, ensuring that no hydraulic head builds up against the threshold seal.
- Flush threshold without an upstand (dimension less than 20 mm)For step-free access with a clearance of less than twenty millimetres, a liquid-applied waterproofing resin reinforced with a polyester fleece is mandatory beneath the threshold profile, supplemented by a protective canopy or a heated drainage grating in mountain areas.
The compensation channel must have a minimum width of at least one hundred and fifty millimetres and rest directly on the load-bearing structure or stable adjustable pedestals, without pinching the underlying bituminous membrane. If the designer refuses the installation of a drainage grating in front of a lowered threshold, liability for the risk of internal flooding cannot be attributed to the waterproofing operative if they have formalised the required reservations.
Connections under shelter and permitted water clearance reductions
Loggias, sheltered terraces and covered balconies fundamentally alter weathering exposure. Standard SIA 271 permits a reduction in water clearance when the building geometry prevents rainwater from directly striking the upstand and prevents any temporary water table backflow. However, this reduction cannot be improvised on the construction site: it requires measurable physical conditions and adequately sized discharge works.
To validate a reduced clearance of 50 mm above the trafficable covering, the roof element must strictly be located within the protective cone of an overhang. The trade rule dictates that the angle formed by the lower edge of the overhang and the top of the upstand must be sufficient to shield against driving rain. If wind frequently drives raindrops against the joinery or if snow accumulates against the frames in winter, the standard dimension of 120 mm remains mandatory, regardless of the available clearance.
- A roof overhang or an upper slab protecting the entire glazed opening from direct wetting at a minimum angle of thirty degrees from the vertical.
- A slope of the protective or traffic covering falling away outwards to shed splash water away from the façade plane.
- The installation of a linear channel with a removable grating or slot, placed directly at the foot of the threshold to immediately capture surface run-off.
In situations with flush thresholds intended for persons with reduced mobility, the clearance frequently falls below 50 mm, sometimes dropping to 20 or 30 mm. In this extreme configuration, a traditional torch-applied bituminous upstand becomes impossible to execute without damaging the joinery seals. Waterproofing operatives systematically resort to liquid waterproofing systems based on polyurethane resin or reinforced PMMA. These resins make it possible to follow the profile of the frame, provide a continuous cold-applied seal, and bond durably to metal or PVC that has been prepared beforehand by sanding and application of a bonding primer.
Block-out conflicts, mechanical compensation and termination details
The waterproofing foreman's daily problem stems from the increase in thermal insulation thicknesses. To meet Swiss energy standards, insulation commonly increases from 160 mm to over 240 mm of rigid foam or mineral wool. If the structural work retained concrete parapets or spandrels of traditional dimensions, the residual height available to turn up the membrane is drastically reduced, making compliance with standard SIA 271 particularly complex.
| Structure configuration | Clearance above finished level | Required compensation device | Top termination method |
|---|---|---|---|
| Standard accessible terrace | 120 mm | None (nominal safety clearance) | Aluminium flashing strip and elastomeric joint |
| Door threshold under shelter | 50 mm | Removable grated channel with slot | Liquid upstand with primer and mechanical fixing |
| Step-free PMR threshold | 20 to 30 mm | Heated channel or connected drain slot | Reinforced PMMA resin embedded on prepared frame |
| Low parapet beneath slabs on pedestals | 120 mm | Folded sheet-metal upstand extension fixed to masonry | Turned-in welt beneath coping drip edge |
It is strictly forbidden to thin down the insulation board locally at the foot of the upstand to artificially regain height. This chamfering creates a major thermal bridge along the junction, causing internal condensation and mould beneath the flat's skirting board. The compliant solution consists in fitting a rigid metal extension, formed of a folded sheet of galvanised steel or aluminium of minimum 1.5 mm thickness, securely anchored into the load-bearing substrate before the waterproofing build-up is applied.
Protection at the top of the upstand completes the system. Run-off water cascading down the façade must never be able to seep behind the bituminous or synthetic sheet. The top of the membrane must be clamped by a corrosion-resistant perforated metal profile fitted with a continuous flexible gasket, or tucked under a drip edge shedding water more than 20 mm clear of the finished face. Where the façade receives external thermal insulation composite systems (ETICS), the waterproofing extends behind the perforated base profile to ensure continuity of the rainscreen without physical discontinuity.
Managing height deficiencies on site and remedial protocols
On the construction site, the upstand height deficiency frequently comes to light at the exact moment when the external joinery trade or the tiling trade sets its finished level benchmarks. The statutory water clearance specified by standard SIA 271 is then squeezed between a bare slab that is too high, thicker thermal insulation than expected, and a sliding door threshold set without any margin. Faced with this deadlocked situation, the waterproofing operative must under no circumstances execute a truncated upstand on their own initiative. Art. 365 CO prescribes that if a circumstance compromises the regular execution of the work, the contractor shall inform the client.
When geometric impossibility is established, the project partners must formalise a technical compensation solution compliant with standard SIA 271 prior to laying the covering. Three remedial measures ensure the safety of the works:
- The installation of a collecting gutter or a grated channel directly connected to the rainwater system or open to the waterproofing level, ensuring immediate discharge without residual water rising along the profile.
- The addition of a protective roof overhang or a watertight canopy providing sufficient shelter to drastically limit the exposure of the vulnerable area to driving rain.
- The use of a reinforced liquid waterproofing system fully bonded to the joinery frame after prior degreasing and sanding, finished with a demountable mechanical clamping strip beneath finished level if a compression seal is specified.
Any reduction in clearance must imperatively be subject to a technical addendum countersigned by the site management and the client, setting down the applicable warranty limits.
Frequently asked questions
Where is the exact starting point taken to measure the required 120 mm?
The dimension is measured vertically from the top surface of the finished wearing course, and not from the bare waterproofing. If your flat roof terrace includes 40 mm slabs on pedestals laid on gravel or 80 mm pedestals, the top of the upstand must rise 120 mm above the top level of the finished slabs; otherwise, the work will immediately be deemed non-compliant during technical inspection.
How should a flush threshold of a glazed door without a weather bar be treated?
Standard SIA 271 permits water clearance to be reduced down to zero level under strict conditions. You must have a removable grated drainage channel directly in front of the joinery, connected to the rainwater discharge, combined with liquid-applied waterproofing turned up with full adhesion against the frame. A protective overhang or roof canopy remains essential to intercept direct water splash.
Can an upstand that is 60 mm too short be compensated for by a simple mastic seal?
No. A bead of silicone or polyurethane mastic constitutes an airtightness or finishing seal, never an approved waterproofing upstand. If the bituminous or synthetic membrane terminates 60 mm too low, water will penetrate by capillary action or backflow during snowmelt. The only solution lies in mechanically extending the waterproofing with a suitable metal profile or an approved reinforced polyurethane resin.
Who bears the financial cost of installing a compensation channel?
If the as-built bare slab level does not comply with the dimensions on the structural work block-out drawing, the cost falls to the mason or the general planner. If the waterproofing operative installed their build-up without previously pointing out that the thermal insulation package reduced the height beneath the threshold below standard requirements, the costs of sealing and flashing adaptations may be claimed from them in full.
Texts and standards cited
- SIA 271Requirements for the execution of waterproofing on flat roofs and terraces, upstand heights and water drainage
- CO art. 365Contractor's obligation to inform the client if circumstances compromise the regular or timely execution of the work
- CO art. 369Exclusion of the client's rights for defects in the work in the event of orders given contrary to the express warnings of the contractor
