Skip to content
Website
🧱 CFC 226Drainage and hydraulic safetyChapter 6 of 10 in the section

Roof retention: storing water intentionally, and what the structure must withstand

This chapter guides you through the execution of a temporary retention flat roof. You will know how to dimension the maximum permitted water depth, imperatively coordinate live loads with the civil engineer, install calibrated discharge flow regulators and organise preventive drainage maintenance to guarantee the durability of the waterproofing and the safety of the structure.

Key takeaways

  • Municipal regulations impose a strict outflow rate to relieve the public drainage network.
  • The temporary water depth creates a dead or variable load calculated with the civil engineer.
  • An independent emergency overflow remains mandatory to discharge exceptional 100-year rainfall immediately.
  • Periodic maintenance of nozzles and filters prevents any risk of unforeseen hydraulic surcharge.

Municipal requirements for discharge flow and temporary retention depth

In many localities across French-speaking Switzerland, the general water drainage master plan imposes a drastic limitation on the outflow discharged into the public combined or separate sewer system. Faced with the increasing waterproofing of urban ground surfaces, municipal technical services regularly require flat roofs to act as rainwater attenuation basins. This constraint transforms the roof into an active hydraulic structure, where water is no longer drained instantaneously but stored on the surface in a controlled manner before being released at a delayed flow rate.

Specific outflow rate
Maximum water volume permitted by municipal regulations to escape from the roof into public pipes, expressed in litres per second per hectare or in litres per second for the plot concerned.

To comply with this prescribed outflow rate without causing premature overflowing, the proofer installs specific systems known as retention roofs. Water accumulation occurs either in open form above the waterproofing build-up within an area bounded by raised upstands, or inside an engineering layer composed of cellular storage plates with a high void ratio. These cellular structures, laid over the root barrier sheet, support the plant substrate or decking while retaining up to ninety-five per cent of void space available for temporary storage.

Average water depths and associated buffer volumes per square metre
Stored water depthAvailable retention volumeAdded unit weightTypical build-up type
30 mm30 l/m²0.30 kN/m²Lightweight substrate and dimpled mat
50 mm50 l/m²0.50 kN/m²Cellular plates with geotextile filter
80 mm80 l/m²0.80 kN/m²Engineering crates under slabs on pedestals
120 mm120 l/m²1.20 kN/m²Open storage on enclosed service roof

Structural coordination, regulation devices and maintenance

Retained water constitutes a direct, substantial live load. Each centimetre of retained water depth applies an additional static load of ten kilograms per square metre, or one-tenth of a kilonewton per square metre. Before commencing any waterproofing works or altering the drainage system, formal written approval from the civil engineer is imperative. The engineer must recalculate the slab bearing capacity, the reinforcement over the supports and the foreseeable structural deflection under maximum water load.

Flow regulation relies on sheet metal components or manufactured calibrated units, known as restrictors or nozzles. Installed directly over the rainwater drain outlet, this element restricts the discharge cross-section by means of a calibrated orifice, a progressive slot or a vortex chamber. The drainage curve must strictly correspond to hydraulic calculations established in accordance with Swiss Society of Engineers and Architects standards.

  1. Verification of superimposed loadsTransmit the technical data sheet of the retention system to the civil engineer, including saturated dead weight and the maximum depth below the emergency overflow weir crest.
  2. Membrane laying and testingInstall the two-layer or synthetic waterproofing sheet, execute waterproof upstands up to fifteen centimetres above the maximum retention level, then perform the watertightness test.
  3. Fastening nozzles and emergency overflowsInsert the flow regulator into the throat of the primary outlet and install an emergency overflow discharging entirely to open air, set at the warning level.
  4. Installation of inspection chambersInstall perforated inspection chambers with removable covers directly over each outlet to guarantee direct access during inspections.

The emergency overflow must under no circumstances be connected to the regulated downpipe. It constitutes an independent open discharge or connects to a distinct unthrottled stack, dimensioned to discharge 100-year rainfall in the event of failure or clogging of the primary regulator. Without this free emergency discharge, the water depth would continue to rise until exceeding the roof's load limit.

Maintenance governs system efficiency and safety. Suspended solids, plant debris and substrate fines risk clogging the millimetre-sized orifices of the nozzle. A regular maintenance contract must provide for wire-brushing grilles, removing silt from the bottom of inspection chambers and visual inspection of welds on waterproofing upstands subjected to prolonged hydrostatic pressure.

Hydraulic safety: dimensioning of emergency overflows and overflow loads

The temporary retention roof acts as an open-air storm water basin. When the regulator throttles the outflow to the municipal sewer according to local requirements, the volume of rainwater accumulates over the waterproofing build-up. This engineered retention generates a constant static load over several hours. In design calculations governed by standard SIA 261, the retained water depth is not a mere accidental load, but a foreseeable variable action superimposed onto the self-weight of the waterproofing, thermal insulation and green roof growing medium. If rainfall intensity exceeds the return period used for the municipal design or if foreign matter partially blocks the calibrated orifice, the water depth rises above the service level. At this stage, the emergency overflow operates to prevent critical loading of the slab.

The civil engineer must imperatively validate the weir crest level of the emergency overflow. This height determines the maximum permissible load that the reinforced concrete or composite structure can carry before structural failure or unacceptable deflection occurs. Every additional millimetre of water represents one kilogram per square metre. If the emergency weir is installed too high compared to the engineer's plans, or if its discharge outlet is obstructed, the overall safety of the building is compromised. Emergency overflows must always discharge water directly to the outside, onto a visible surface at ground level, without ever being connected to the internal regulated drainage network.

Hydraulic regimes and structural stresses on retention flat roofs
Operational parameterRegulated nominal regimeSafety regime (emergency overflow)Critical overflow regime
Water level on waterproofing0 to 80 mm (depending on regulator)80 to 120 mm (weir crest)Above 120 mm (ponding overload)
Discharged flow rateImposed throttled outflow rateDirect free discharge flow rateDischarge limited by roof geometry
Slab stressPermitted temporary variable loadMaximum permissible calculated loadRisk of excessive deflection or structural failure
Action by the prooferPrecise setting of the throttle ringWatertight installation of the overflow flangeImmediate alert to site management

Acceptance inspections and maintenance plan for flow regulators

Before laying protective layers, gravel or extensive green roof substrate, the waterproofing on a retention roof must systematically undergo a ponding test. This check consists of temporarily plugging the regulators to flood the roof up to the maximum water height planned for the emergency overflow, for at least forty-eight hours. The water test is a decisive step in validating waterproofing upstands, rainwater outlets and junctions against parapets before their permanent burial under cellular drainage plates. If an abnormal drop in water level occurs without drainage through the restrictor, the proofer promptly looks for the leak along the weld seams. The proofer, accompanied by the site agent and the civil engineer, checks for the complete absence of seepage on the underside of the slab and measures any deflection sustained by the structural work under this temporary water overload.

  1. Bi-annual visual inspectionOpen the lid of the inspection box and manually remove silty deposits, moss and organic matter accumulated around the calibrated ring.
  2. Cleaning the outflow nozzleRun a bottle brush through the calibrated orifice of the regulator to clear scale and fine sediments without altering the metal or plastic cross-section.
  3. Checking the emergency overflow channelCheck the cleanliness of the emergency pipe through the parapet or the independent downpipe, ensuring that no nests or debris obstruct free drainage.
  4. Recording in the maintenance logbookRecord the inspection date, noted defects and flushings carried out in the maintenance tracking document handed over to the building owner in accordance with standard SIA 271.

System durability relies on the thoroughness of preventive maintenance. According to recognized Swiss trade standards and standard SIA 118, the waterproofing company has a duty to record operational instructions in a detailed manual intended for property management. If the municipality inspects the compliance of stormwater discharge after commissioning of the building, the client must be capable of proving that the regulation nozzles remain clear and that the actual outflow rate corresponds exactly to the terms of the original building permit.

Managing retention anomalies and technical arbitration

During heavy rainfall events, surface accumulation on a regulated flat roof can exceed the calculated theoretical volume. This malfunction frequently stems from a critical discrepancy between municipal outflow requirements, which are often very restrictive, and the retained water depth actually permitted for the structure. If the sizing of the throttling orifice holds back a volume greater than the structural load tolerance, the structure deflects under the accumulated water load. This deformation accentuates the central bowl and concentrates liquid masses away from the planned drainage points. Noting an abnormal water load requires an immediate halt to finishing works and an in-depth drainage check by the installation teams.

Faced with municipal requirements stipulating severe peak attenuation without structural justification, the proofer must exercise absolute rigour. According to art. 365 CO, if any other circumstance arises that compromises the proper or punctual execution of the work, the contractor shall immediately inform the client, on pain of bearing the consequences. The formal written notification sent to site management requests the civil engineer's formal approval for the maximum temporary water depth. The proofer must never modify or enlarge a nozzle independently to drain water faster: such an alteration without municipal approval breaches the conditions of the issued building permit.

  • Verify that emergency overflows are completely unobstructed and confirm that their weir crest lies above the nominal water line.
  • Clean the filter element of the regulator to remove silt or fine vegetation that reduces the prescribed outflow rate.
  • Measure the actual retained water depth at the low point using an optical level to compare the actual deflection with the calculation note.
  • Record the observed water level in the daily log and suspend construction site live loads on the flooded zone.

Frequently asked questions

Who validates the maximum permissible water depth before installing flow regulators?

Validation is exclusively the responsibility of the civil engineer responsible for the load-bearing structure of the building. The proofer receives roof plans indicating the level of emergency overflows and the permissible limit area load. Even if the municipal water department imposes a very low outflow rate, no restrictor nozzle may be installed without written confirmation that the concrete slab or steel deck can support the corresponding weight of stored water.

How do you intervene if the flow restrictor is completely blocked by sediment?

The inspection cover on the riser must be removed without damaging the surrounding waterproofing membrane. The calibrated nozzle is cleaned manually or with a low-pressure water jet, extracting dead leaves, soil and mineral debris. If water stands above the critical level, temporarily operate the emergency drain valve or confirm that the emergency overflow immediately discharges the excess before resealing the inspection chamber.

Why cannot a nozzle be drilled out to accelerate drainage if ponding occurs?

Modifying the diameter of a regulator without approval constitutes a direct violation of municipal building permit requirements. The discharged outflow limit protects the public network from saturation and downstream flooding. By enlarging the orifice, the proofer unburdens the roof but transfers an unauthorised flow rate into public pipes, directly engaging professional liability toward the municipality and the client for any downstream flood damage caused.

What is the minimum maintenance frequency for a temporary retention roof?

The regulation device requires strict inspection at least twice a year, ideally in spring and late autumn. During each visit, the operative checks the permeability of the filter basket, cleans the silt trap chamber and ensures that overflow weirs are completely clear. A maintenance report recording the condition of drainage units ensures the durability of the structure and prevents unforeseen water overloads.

Texts and standards cited

  • CO art. 365materials and ground: the contractor is liable for the good quality of the materials he supplies; if the materials supplied by the client or the ground designated by him are found to be defective, or if any other circumstance arises which compromises the proper or punctual execution of the work, he shall immediately inform the client, on pain of bearing the consequences (para. 3).

In the same section