Skip to content
Website
🧱 CFC 226Upstands and special detailingChapter 5 of 10 in the section

Expansion joint: upstand kerb, expansion bellows and waterproofing continuity

This chapter details the rules for treating expansion joints on flat roofs according to standard SIA 271. You will learn how to install upstand kerbs to rule out flush joints, weld elastomeric bellows resistant to structural cycles and lock in waterproofing continuity at transitions to parapets and perimeter upstands.

Key takeaways

  • Any expansion joint on a flat roof must be executed on an upstand kerb without exception.
  • The minimum upstand height guarantees water clearance against accumulations and extra thicknesses.
  • The vulcanised elastomeric bellows absorbs triaxial stresses without transferring tension to the waterproofing.
  • Connecting to parapet upstands requires factory-formed precast components to maintain absolute watertightness.

Raised treatment using upstand kerbs according to standard SIA 271

On a flat roof, the treatment of an expansion joint is never designed at the water drainage flow level. Laying a flush strip at the bottom of a channel exposes the system to permanent standing water and an immediate risk of tearing under the combined effect of frost, thermal debonding and silt. The trade's technical rule, defined by standard SIA 271, systematically requires raising the element above the finished waterproofing level. Structural movement must be managed above the gravity drainage line.

Upstand kerb
Continuous low wall made of reinforced concrete, treated solid timber or metal sections anchored to the load-bearing structure on either side of the structural break, intended to elevate the waterproofing system out of run-off surface water.

The kerb frame must be mechanically independent on each side of the structural gap. The structural work break runs through the thermal insulation without creating a direct thermal bridge, thanks to the insertion of non-combustible or compatibly classified compressible insulation within the slot. Both low walls receive a full upstand consisting of a connected vapour barrier, upstand thermal insulation and two layers of bituminous sheets or a compatible synthetic membrane. The height of this upstand must exceed the main waterproofing plane to ensure water clearance compliant with local requirements, taking into account protective layers, gravel or pavers on pedestals.

Contractually, the waterproofer must verify the geometric compliance of the kerbs provided by the structural work contractor before laying the membranes. Under art. 365 CO, the contractor notifies the client of defects in the ground or substrates provided that jeopardise the proper execution of the works. A level difference between the two edges exceeding standard tolerances or an axial misalignment requires remediation of the masonry prior to any work with a torch or hot-air gun.

Setting-out parameters for expansion kerbs
Roof typeMinimum height above protectionJoint infill materialSubstrate fixing
Gravelled flat roof120 mmCompressible mineral woolStaggered mechanical through-bolts
Accessible terrace with pavers on pedestals120 mmClosed-cell elastomeric foamCoach screws into timber kerb tied to structural work
Extensive green roof150 mmRot-proof expanded insulationStainless steel anchor studs on reinforced concrete low wall
Underground car park beneath road surface150 mmFirestop cord and compressible sectionChemical anchors into waterproof concrete plinth

Installation of elastomeric bellows and continuity with adjacent upstands

The connection between the two kerbs is made using an expansion bellows system. This component consists of a highly flexible elastomeric central strip, usually made of EPDM or reinforced polymer-bitumen, provided with an axial and lateral expansion loop. The lateral flanges are reinforced with a mesh or perforated metal backing that is inserted by vulcanisation or heat-welding between the base sheet and the top sheet of the upstand system. The loop of the bellows remains free of any mechanical bonding to retain maximum deformation amplitude without shear stress.

  1. Preparation of kerb topsChamfer the sharp edges of the kerb, clean the bearing surface with a wire brush and remove all traces of moisture, grease or cement laitance.
  2. Insertion of the compressible coreInsert a cylindrical insulating joint backing rod or a compressible profiled cord into the structural gap, supporting the expansion loop without restricting its elasticity.
  3. Welding the bellows flangesPosition the centreline of the bellows over the centre of the gap, then fully torch-weld or hot-air weld the lateral cover strips onto the prepared kerbs, respecting specified overlaps.
  4. Sealing with cover membraneApply the second bituminous waterproofing layer or the synthetic finishing strip over the bellows flanges up to the base of the expansion fold.
  5. Installation of the protective metal copingMechanically fix a metal flashing profile with a sliding welt to shield the membrane from ultraviolet radiation and hail without impeding expansion movements.

The most sensitive point lies in the joint transition to vertical walls, such as edge parapets or stairwell walls. Under no circumstances may the joint stop at the base of the parapet: the structural movement extends vertically into the masonry element. The waterproofer must continue the kerb along the internal face of the parapet up to the capping, forming a single transition unit.

To ensure this critical continuity, the use of factory-prefabricated and vulcanised corner pieces is required. Welds executed on the construction site in three dimensions at the junction between the horizontal and vertical planes create undesirable stress concentrations. Preformed end sleeves, bends and angle sections guarantee a uniform elastomer thickness and a consistent bond with adjacent bituminous upstands.

Vapour barrier treatment and mechanical anchoring of split kerbs

A structural building joint must run through the entire roof system, from the load-bearing slab to the waterproofing covering. Treatment must start at the substrate level by installing a split kerb. Each side of the joint receives its own upstand element (reinforced concrete low wall cast onto the slab or folded galvanised metal kerb), without any rigid mechanical connection from one side to the other. This design maintains the independent movement of the building sections, preventing any shear-induced cracking. Before laying the thermal insulation, the vapour barrier must be extended vertically up both sides of the kerb.

At the bottom of the channel formed between the two kerbs, a compressible closed-cell backing rod is inserted. The vapour barrier forms an expansion loop resting on this supporting profile and is then connected on both sides by welding or vulcanising with a compatible membrane. This airtight loop prevents any internal moisture from infiltrating the insulation system. The roof thermal insulation is then fitted tightly against the vertical faces of the upstands to eliminate thermal bridges, while leaving the structural gap clear for the dynamic stresses of the slabs.

Selection of bellows systems according to the waterproofing build-up
Technical componentBituminous system (CFC 226)Synthetic system EPDM or FPO
Type of prefabricated bellowsElastomeric strip with flanges reinforced by a bituminous carrierHomogeneous elastomeric strip with compatible connecting margins
Fastening onto the kerbTorch-welded with full-surface adhesion under a cover stripHot-air thermal welding or chemical vulcanisation adhesive bonding
Deformation managementFlexible unreinforced central core forming a downward loopUnbonded central unvulcanised portion guided over a backing rod
End reinforcement layerElastomeric bitumen capping sheet with mineral self-protectionContinuously welded matched waterproof bridging strip

Connection of the expansion bellows and continuity of perimeter upstands

Installing the expansion bellows is the critical operation ensuring the roof's watertightness. This deformable industrial profile withstands repeated expansion and contraction cycles of the structural work. The bellows flanges are anchored to the top or external face of the split kerbs. The flexible central zone remains freely deployed as a loop over the structural void, unconstrained by through-fasteners. This profile continuously absorbs opening, closing and vertical offset movements resulting from live loads, thermal variations or differential settlement of foundations.

  1. Bonding the flanges onto the upstand elementThe lateral flanges of the elastomeric bellows are sandwiched between the first vertical waterproofing layer and the upstand capping sheet. A minimum overlap of 120 mm guarantees continuous adhesion and watertightness against lateral infiltration.
  2. Corner junction and parapet crossingWhere the roof joint meets edge parapets or party walls, the waterproofer installs a factory-moulded three-dimensional connection piece. This component eliminates any on-site mitred jointing that is vulnerable to tearing during expansion movements.
  3. Installation of the sliding telescopic copingA folded metal profile caps the top of the two kerbs. It is mechanically fixed on one edge only, while the other edge slides freely in a cleated welt. This arrangement ensures water run-off while allowing structural movements without damaging the upstand.

Executing roof joints involves open-flame welding techniques and handling elastomers on insulated surfaces. In accordance with art. 82 LAA, the employer must take all measures that state of the art techniques allow to safeguard the health and safety of workers: using non-combustible heat shields to protect insulation during heating, providing fire extinguishers in the direct vicinity of heating stations and conducting post-work inspection rounds. Maintaining a minimum clearance of at least 150 mm above pavers or gravel keeps the flexible element clear of melting snow or temporary water ponding.

Management of defects, infiltration and remediation of failing joints

Water ingress at an expansion joint almost always stems from a design error: a flush treatment instead of a raised installation, or loss of bellows adhesion due to unanticipated three-dimensional shear. When rainwater ponds in a non-raised expansion trough, constant hydrostatic pressure eventually breaches the welds of the elastomeric strips. Furthermore, shear frequently tears the connections to adjacent upstands if axial and transverse continuity was not sized to accommodate the concrete blocks' actual structural movements.

  1. Diagnosis and clearing of the waterproofing zoneRemove gravel or pavers over a minimum width of one metre on either side of the fault. Remove metal cappings to thoroughly inspect the condition of the expansion bellows, the position of the compressible backing rod and the adhesion of strips to the vapour barrier and waterproofing build-up.
  2. Reconstruction on a raised split kerbIf the original joint was cast flush, completely remove this defective connection. Rebuild a raised split kerb providing a clearance of at least 150 mm above the wearing layer, securely bolted into the load-bearing slab in accordance with standard SIA 271 requirements.
  3. Installation of elastomeric bellows and waterproofing continuityInstall a new elastomeric waterproofing strip featuring an unconstrained expansion loop. Join the flanges by heat welding or continuous vulcanisation onto the waterproofing of both kerbs. Carefully connect the ends of the bellows to adjacent upstands and parapets using factory-moulded and vulcanised components.

Faced with a non-watertight structure, CO governs the client's rights in the event of defects in the work, which include remediation, price reduction, rejection or damages. On site, the waterproofer must refuse makeshift repairs and enforce structural remediation via raised upstands in accordance with standard SIA 271 and standard SIA 118. Only the complete reconstruction of a raised kerb and continuous elastomeric bellows guarantees long-term watertightness against climatic and mechanical stresses.

Frequently asked questions

Why does standard SIA 271 strictly prohibit laying an expansion joint flush with the drainage flow line?

A flush joint creates a natural hollow where rainwater permanently accumulates. Even with welded elastomeric strips, prolonged ponding produces continuous water pressure that exploits the slightest microporosity in adhesion. Thermal and shear movements eventually debond the bellows edges. Only an upstand kerb raised above the protective layer eliminates hydrostatic stress and ensures waterproofing durability.

What minimum height must the upstand kerb maintain relative to the finished level?

According to standard SIA 271, the upstand kerb must rise at least 150 mm above the finished wearing or protective layer, whether gravel, pavers or green roof system. If the roof features reduced water clearance or a significant risk of snow accumulation, this value may be increased. This elevation protects the elastomeric bellows from direct surface run-off, ice and temporary leaf accumulations.

How is waterproofing continuity ensured where the joint meets a parapet?

The junction between the expansion joint and the perimeter parapet requires a meticulously executed three-dimensional transition. A factory-preformed connection piece or one fabricated from compatible heat-welded membrane is used. The expansion bellows runs vertically up along the kerb and integrates into the parapet upstand without axial discontinuity. A metal apron flashing or continuous capping provides mechanical protection and prevents ingress from upper run-off.

What should be done if the expansion joint experiences unforeseen three-dimensional movements?

When the structure undergoes differential settlement or horizontal shear greater than planned, standard elastomeric strips risk tearing. The build-up must be removed around the joint to replace the bellows with a highly deformable EPDM or reinforced polyolefin profile with an enlarged expansion loop. Installing compressible mineral wool insulation within the structural gap guides deformation without overly compressing the membrane.

Texts and standards cited

  • SIA 271Waterproofing of flat roofs, terraces and underground structures
  • SIA 118General conditions for construction works
  • COclient's rights in the event of defects in the work: rejection, price reduction, remediation, damages; any clause agreed in advance that restricts or excludes the right to defect remediation is void if the defect relates to a construction work (para. 2bis, since 1 January 2026)

In the same section