Protection, green roofs and accessible terraces: execution standard

Aimed at waterproofing team leaders, site foremen and site managers, this guide brings together the application rules for the waterproofing system: extensive greening, accessible terraces on pedestals, parking decks and ballasted photovoltaic arrays. It specifies drainage, filtration, mechanical protection and load distribution requirements in accordance with Swiss codes of practice to prevent punctures and structural defects.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

norme SIA 271

30 cm

Standard minimum width of sterile gravel strips along upstands according to codes of practice

norme SIA 271

12 cm

Minimum height of the waterproofing upstand above the wearing course or substrate

art. 23 OTConst

2 m

Fall height from which a guardrail or fall-arrest deck is mandatory

art. 22 OTConst

100 cm

Minimum height of the top rail of the edge-protection guardrail

Technical scope of heavy protection and roof layouts

This section covers exclusively layers installed directly above the waterproofing system on flat roofs, terraces, parking decks and inverted roofs. The waterproofer's scope of work here includes laying sliding, separating, drainage and filtration layers, as well as installing heavy protection elements: ballast gravel, mineral substrate for extensive greening, paving on adjustable pedestals or trafficable layers for light and heavy vehicles.

Works falling under the mason's remit for structural work and tanking are excluded from this scope, as is the bedded or bonded laying of tiled floor coverings on outdoor terraces, which falls under the tiler's scope. Similarly, pitched roof infrastructure elements and roof tinsmithing fall within the tinsmith-roofer trade. The waterproofer ensures absolute protection of the membrane against puncture, root aggression and climatic or operational stresses.

Methodical path: from root protection to long-term operation

Executing roof finishes on waterproofing requires a strict sequence. The essential starting point lies in verifying the mechanical and biological resistance of the membrane. No greening work can begin without a certified root-resistant treatment, supplemented by the meticulous installation of peripheral sterile gravel strips along all upstands and penetrations to prevent drain blockages and plant migration.

For pedestrian or trafficable surfaces, the logic revolves around managing point and dynamic loads. The waterproofer must size load-distribution plates beneath pedestals and install heavy-duty protection geotextiles before applying any asphalt or laying paving blocks on a parking deck. Runs of building services, surface irrigation and solar modules follow a common rule: no mechanical fastening must penetrate the waterproofing without a validated specific detailing design.

  1. Validation of root-resistant waterproofing and installation of sterile washed gravel zones.
  2. Installation of drainage, water-retention and textile filtration layers.
  3. Load distribution for slabs on pedestals, accessible terraces and parking decks.
  4. Integration of surface irrigation networks and ballasted solar racking.
  5. Structural compliance check before final tipping and initial maintenance planning.

📘 Chapters in this section 10

Protection, green roofs and accessible roof terraces

Extensive greening: drainage, filter, substrate and suitable plants

Mastering the complete assembly of drainage, fleece and substrate to ensure water retention without clogging drains.

Protection, green roofs and accessible roof terraces

Root-resistant protection: a requirement, not an option, and how to prove it

Identifying root resistance certifications to safeguard your waterproofing warranty against any handover refusal.

Protection, green roofs and accessible roof terraces

Gravel margins: why leave gravel along upstands and penetrations

Demarcating the perimeters of penetrations to secure upstands and maintain access to gutters without fire risks.

Protection, green roofs and accessible roof terraces

Slabs on pedestals: point load, distribution layer and level adjustment

Eliminating puncture risks beneath adjustable pedestals using appropriate distribution pads and layers.

Protection, green roofs and accessible roof terraces

Accessible terrace: live loads, ballasting and limits of use

Calculating the impact of live loads to prevent insulation settlement and ponding water.

Protection, green roofs and accessible roof terraces

Parking deck roof: protection under heavy traffic and slab joints

Implementing systems beneath asphalt or concrete to absorb vehicle braking forces.

Protection, green roofs and accessible roof terraces

Irrigation: when it is needed and how to lay it without piercing

Installing self-contained, secure surface irrigation networks without ever puncturing the waterproofing system.

Protection, green roofs and accessible roof terraces

Photovoltaics on flat roofs: ballast without penetrations, loads

Laying out photovoltaic ballast against wind loads while maintaining rainwater run-off.

Protection, green roofs and accessible roof terraces

Maintenance of a green roof: the first year determines the rest

Establishing the monitoring protocol for the first twelve months to stabilise the plant mat and secure handover.

Protection, green roofs and accessible roof terraces

Before ballasting: check what the structure truly accepts

Checking allowable superimposed loads with the engineering consultant before offloading gravel or soil.