Key takeaways
- The point load under a pedestal base requires adequate mechanical strength from the underlying thermal insulation.
- Inserting a distribution layer prevents direct mechanical puncturing of the waterproofing membrane by the pedestals.
- Self-levelling heads or shims compensate for the fall of the waterproofing build-up while ensuring a flat pedestrian surface.
- The height adjustment of the jacks maintains the clear void below required for the continuous discharge of rainwater.
Concentrated load transfer and compressive strength of the insulation build-up
On an accessible flat roof terrace, the paving on pedestals converts the imposed surface loads into a series of concentrated point forces. Each support pedestal features a circular or square base with a limited surface area, generally between one hundred and fifty and three hundred square centimetres. All dead loads comprising concrete or porcelain stoneware slabs, the self-weight of the pedestals, outdoor furniture and climatic loads are transferred through these small contact points. This localised pressure places severe stress on the thermal insulation build-up, whether located beneath the bituminous waterproofing or above it in an inverted roof configuration.
- Creep resistance of insulation
- Maximum permissible stress under continuous compression that guarantees a thermal insulation deformation of less than two per cent over a theoretical service life of fifty years.
The waterproofing installer must imperatively verify that the type of underlying thermal insulation can withstand these stresses without suffering irreversible settlement. Materials with a rigid closed-cell structure, such as high-density extruded polystyrene or cellular glass, offer nominal values sufficient to support direct bearing from a pedestal fitted with flexible protection. Conversely, standard polyurethane, conventional expanded polystyrene or mineral wool boards collapse rapidly under continuous puncturing, causing the slabs to tip and creating destructive tensile stresses in the waterproofing membrane. Under art. 365 CO, if any circumstance arises which compromises the proper performance of the work, the contractor must give notice to the client. The absence of insulation dimensioned for the point loads beneath the pedestals fully justifies such formal written notice.
| Type of insulation | Behaviour under point load | Mandatory design measure |
|---|---|---|
| High-density extruded polystyrene | Low elastic crushing, good creep resistance | Elastomer or granulate protective pad under the base |
| Rigid polyurethane (PIR) | Risk of localised creep under heavy concentrated loads | Rigid distribution plate under the pedestal base |
| High-density rock wool | Rapid puncturing without a rigid transition layer | Cement screed or thick distributed concrete slabs |
| Cellular glass | Incompressible but brittle under impact point loading | Continuous resilient layer under waterproofing and pedestals |
Distribution layers, fall correction and height adjustment
Physical protection of the waterproofing membrane is an absolute requirement before setting out any adjustable pedestals. Direct friction between the rigid polypropylene base and a bituminous or synthetic membrane risks shearing the waterproofing covering during annual thermal expansion cycles of the paving. A rot-proof rubber granulate protection mat or a thick synthetic geotextile is systematically inserted under each pedestal. When the mechanical strength of the insulation is marginal or when the upper slabs are large-format and very heavy, the waterproofing installer positions precast unreinforced concrete distribution slabs beneath the bases. This measure doubles or triples the bearing surface on the waterproofing build-up and smoothly diffuses mechanical pressure into the reinforced concrete structural deck.
- Cleaning and installation of base protectionsRemove all chippings or sharp debris from the waterproofing, then roll out a recycled rubber granulate protection mat with a minimum thickness of eight millimetres.
- Setting out distribution layersPlace concrete slabs of forty by forty centimetres under each row of pedestals if load calculations require widening the bearing area on the insulation.
- Adjusting the jacks and compensating for fallsTurn the threaded adjustment ring on the telescopic pedestals and align the self-levelling heads to compensate for the fall of the waterproofing, which is generally between one and a half and two per cent.
- Alignment and laying of slabsEngage the slabs onto the upper spacer tabs while checking planarity with a two-metre straightedge, keeping the joints open for rainwater drainage.
The final check on the construction site concerns the overall stability of the laid paving and the free perimeter expansion along the edges. The absence of edge clips or perimeter stops causes lateral shifting under pedestrian traffic, whereas over-tightening against masonry parapets causes erratic lifting of the slabs during high summer temperatures. Free edges or terrace perimeters must be fitted with specific, firmly fixed metal edge stops, without ever penetrating the waterproofing membrane or blocking the natural flow of water towards the outlets.
Arrangement of distribution slabs and protection of insulation
The adjustable pedestal transfers all imposed loads and the self-weight of the paving in an extremely concentrated manner onto a limited circular base. When the waterproofing build-up rests on a thermal insulation board, this point load induces very high local stresses through the membrane. Without specific measures on the construction site, the insulation experiences progressive depression or creep under continuous loads. This settlement deforms the build-up, creates ponding hollows under the slabs, and exposes the waterproofing membrane to an immediate risk of irreversible mechanical puncturing.
To guarantee the durability of the system, the compressive strength of the insulation must be evaluated directly against the actual bearing area. If the load-bearing capacity of the thermal insulation proves insufficient to bear the load transferred by the pedestal base directly, installing a distribution layer is mandatory. This measure consists of inserting precast concrete distribution slabs or suitable rigid plates beneath each pedestal. This rigid element broadens the base, disperses stresses over a significantly larger surface area, and thereby protects the insulation against localised crushing.
| Type of insulation beneath waterproofing | Mechanical behaviour under pedestal | Recommended distribution system | Execution requirement on the construction site |
|---|---|---|---|
| Rigid cellular glass | High crushing resistance but sensitive to sharp edges under load | Elastomer cushion pad under rigid distribution slab | Check that the substrate is perfectly flat to eliminate any risk of fracturing. |
| Expanded polyurethane (PIR) | Risk of localised settlement under repeated traffic or heavy furniture | Concrete distribution slab placed on a synthetic protection layer | Strictly prohibit any direct bearing of the plastic base on the waterproofing build-up. |
| Extruded polystyrene (inverted roof) | Good overall behaviour but residual compression under a narrow base | Precast concrete slab installed on a diffusion fleece | Align shims carefully to prevent pedestals from tilting. |
Level adjustment, fall correction and maintaining drainage flow
The major technical advantage of an accessible terrace on adjustable pedestals lies in the complete functional separation between the horizontal pedestrian surface and the underlying waterproofing plane. The flat roof must retain its original drainage fall to guide precipitation quickly towards downpipes and rainwater outlets. Height adjustment of the walking level is achieved using the telescopic screw mechanisms of the pedestal shafts, whilst compensation for the fall of the screed is ensured by pivoting self-levelling heads or adjustable tilt shims.
- Substrate inspection and setting-out layoutThe site supervisor checks that the waterproofing membrane has no folds, noticeable low spots or obstructions to the water flow line. The layout of the pedestal lines is struck with a chalk line in accordance with the precise laying pattern of the paving slabs.
- Installation of cushion pads and distribution slabsThe elastomer granulate protective pads are laid out on the waterproofing. The concrete distribution slabs are placed centrally on them, ensuring sufficient gaps are left so as not to block the natural flow of water.
- Slope corrector adjustment and pedestal verticalityThe pedestal base is seated on the distribution slab. The slope compensator is precisely adjusted to the fall value measured with a spirit level, so that the threaded shaft of the pedestal remains strictly vertical under load.
- Height adjustment and slab levellingThe micrometric ring is adjusted to reach the design height set by laser. After laying the paving slabs onto the head spacer tabs, a check with a string line and level ensures perfect continuity of the walking surface.
The arrangement of the distribution layers must be executed with rigorous attention to roof drainage. If the concrete distribution slabs are placed tightly butted and perpendicular to the line of steepest fall, they form an artificial dam that retains rainwater and encourages the accumulation of muddy silt. The waterproofing installer must always maintain a gap of at least a few centimetres between adjacent distribution units. This precaution ensures the unobstructed transit of runoff water towards the rainwater outlets, while keeping the pedestals and insulation out of harmful prolonged immersion.
Managing defects: settlement, puncturing and base remediation
The appearance of a dip, lipping, or misaligned edges on a deck often indicates a mechanical failure beneath the bases. Under the cumulative effect of dead loads and imposed loads, thermal insulation with insufficient compressive strength suffers destructive creep. The pedestal then progressively sinks into the insulation bed, creating a direct risk of perforating the waterproofing membrane if the load distribution layer was omitted or undersized. This local loss of height also disrupts the gravity flow of rainwater beneath the slabs, creating areas of prolonged ponding on the substrate. As soon as localised settlement is observed, the repair team must secure the area and lift the demountable units to examine the actual bearing conditions of the structure.
- Diagnosis and stripping back the areaLift adjacent slabs using suction lifters to expose the head and base of the defective pedestals. Measure the magnitude of settlement with a water level or construction site laser, then remove the jack to visually inspect the condition of the waterproofing sheet and probe the depth of the residual depression in the insulation.
- Remediating the underlying build-upNeatly cut out the membrane and thermal insulation board if the settlement exceeds permissible tolerances. Replace the compressed zone with new insulation of high mechanical strength, then heat-weld a waterproofing reinforcement patch providing a perimeter overlap of at least fifteen centimetres.
- Installing the distribution layer and levellingInsert a rigid distribution slab on a resilient pad under the base to spread the point load over an enlarged area. Adjust the height of the jack to match the drainage fall of the substrate, then reposition the paving, verifying that edges are flush and joints remain clear.
Frequently asked questions
What should be done in the event of localised puncturing of the insulation under a pedestal?
The removable slabs around the depression point must be lifted to access the affected area. Cut out the damaged waterproofing build-up, remove the collapsed insulation, and insert a new board with high compressive strength. Then weld a waterproofing reinforcement patch with a generous overlap, and reseat the pedestal on a rigid distribution slab combined with an elastomer protection pad to spread the point load before putting the terrace back into service.
Why is it forbidden to place an adjustable pedestal directly on the membrane?
The pedestal concentrates all dead and imposed traffic loads onto a restricted circular base. Placed directly onto the bituminous or synthetic membrane, it shears the covering due to micro-movements and bearing pressure. Inserting a flexible protection pad, combined where necessary with a rigid distribution slab, diffuses this stress across the thermal build-up, cushions impacts, and protects the integrity of the waterproofing against friction wear risks.
Which material is preferred for the distribution layer under pedestal bases?
To relieve vulnerable insulation or insulation subjected to heavy imposed loads, a precast concrete slab or a rigid composite element with dimensions of at least thirty centimetres on each side is used. This rigid element rests on a granulate rubber pad that protects the waterproofing sheet. This combination broadens the bearing footprint, reduces pressure per square centimetre beneath the pedestal base, and prevents the jack from gradually sinking into the roof thermal insulation boards.
How is the horizontal level of the slabs adjusted without hindering the drainage fall?
Levelling the paving horizontally is carried out exclusively using the jacks or self-levelling heads of the pedestals, without altering the fall of the roof. The shaped falls of the substrate and waterproofing build-up must remain intact beneath the pedestals to guide water towards the outlets. Open joints between slabs allow immediate water drainage to the underside, where the clear void provided by the height of the jacks ensures continuous gravity flow.
Texts and standards cited
- SIA 118General conditions for construction works
- CO art. 365Material supplied by the client or defective ground, immediate notice of circumstances compromising the work (para. 3)