CFC 201 Earthworks prices in the canton of Vaud — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Earthworks and excavations” (CFC 201) for the canton of Vaud. ACIP chapter no. 3 contains 121 entries, of which 86 are priced items in Swiss francs, excluding VAT (HT), spread over 8 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Vaud, the regional ACIP coefficient is 1.00 (cantonal modifier 0 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 97.35 CHF/h on a daywork basis and a foreman or team leader 135.15 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker97.35CHF/h
  • Foreman / team leader135.15CHF/h
  • Helper87.20CHF/h
  • Apprentice52.45CHF/h
  • Regional ACIP coefficient1.00Vaud

Prices of the key items of CFC 201 earthworks in the canton of Vaud

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.00; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Protection and shoring TER-PT-0120 · Propped close-boarded shoring for an isolated pit measuring one metre fifty by one metre fifty and a depth of… m² 45.50 53.50 66.90 —
Trench excavations TER-FT-0030 · Mechanical excavation of an unshored trench with vertical walls, depth of two metres one to three metres m³ 33.40 39.30 49.15 —
Backfilling and finishing TER-RF-0010 · Mechanical backfilling and compaction of trenches or excavations with the excavated materials m³ 16.25 19.10 23.90 —
Transport and fees TER-TT-0040 · Removal and transport of unpolluted topsoil to the tip site, excluding tipping fees m³ 15.60 18.35 22.95 —
Topsoil stripping TER-DT-0020 · Mechanical stripping of the topsoil layer over a width of between two metres one and five metres m³ 6.20 7.30 9.15 —
Excavations TER-FO-0020 · Mechanical excavation of an isolated pit for foundations or manholes, without shoring, depth of one metre fifty and… m³ 31.70 37.30 46.65 —
Underpinning TER-RO-0020 · Excavation in stages under existing foundations with loading into skips, stage of one cubic metre twenty-six to two cubic metres… m³ 159.40 187.50 234.40 —
Backfilling and finishing TER-RF-0150 · Mechanical placing of topsoil, maximum thickness of thirty centimetres, over a width of up to two metres m² 4.40 5.15 6.45 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 3 (ACIP code shown); the family has 17 entries for the first item. The 86 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Vaud)

Average hourly rate observed (skilled worker)
97.35 CHF/h
Regional ACIP coefficient
1.00
Range of the chapter's rates (from helper to foreman)
87.20 to 135.15 CHF/h
Hub reference agreement
National Agreement for the Structural Building Trades (CN)
  • Wage zone of the ACIP reference: Blue (Lausanne: Red).
  • Reference employer charges: 34,8 % for structural work, 25,8 % for finishing work and building services; family allowance rate (CAF): 3,4 %.
  • Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Lausanne +5 %, Nyon/Morges +5 %, Montreux/Vevey +3 %, Villars +10 %.
  • The locality with the highest uplift in the canton in the reference is Villars (+10 %): the page's cantonal coefficient does not reflect it.
  • Workbook 3 has no daywork section: rates from workbook 29 (Civil engineering), foreman, machine operator, building worker, apprentice.

Source: ACIP 2026 workbook no. 3 (Earthworks) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 201 (CFC) and 211 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 201 earthworks (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: earthworks in the canton of Vaud

What is the daywork hourly rate for earthworks in the canton of Vaud?

According to the 2026 ACIP price list, a skilled worker is charged 97.35 CHF/h on a daywork basis in the canton of Vaud, a foreman or team leader 135.15 CHF/h and a helper 87.20 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 3 multiplied by the regional coefficient 1.00.

What is the regional ACIP coefficient for Vaud?

The ACIP coefficient of Vaud is 1.00 (cantonal modifier 0 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Protection and shoring” cost in the canton of Vaud?

The ACIP item TER-PT-0120 (Protection and shoring, unit m²) is estimated at 53.50 CHF/m² excl. VAT in the canton of Vaud, with a range of 45.50 to 66.90 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 53.50 CHF/m².

Which collective agreement applies to earthworks in the canton of Vaud?

The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Vaud, the wage zone shown is “Blue (Lausanne: Red)” and the reference employer charges are 34,8 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 201 earthworks prices in the other cantons

See also the CFC 201 prices: Geneva (coefficient 1.12, skilled worker 109.05 CHF/h), Valais (coefficient 0.95, skilled worker 92.50 CHF/h), Fribourg (coefficient 0.98, skilled worker 95.40 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 94.45 CHF/h), Jura (coefficient 0.94, skilled worker 91.50 CHF/h), Bern (coefficient 1.02, skilled worker 99.30 CHF/h).

Other trades in the canton of Vaud

Hub tools and pack for this trade

Price this chapter in Soumission. The 86 items of ACIP chapter no. 3, adjusted for the canton, directly in your quotes. Discover Soumission