CFC 242 Heating and ventilation prices in the canton of Vaud — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Heating and ventilation” (CFC 242 / 244) for the canton of Vaud. ACIP chapter no. 14 contains 205 entries, of which 164 are priced items in Swiss francs, excluding VAT (HT), spread over 12 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Vaud, the regional ACIP coefficient is 1.00 (cantonal modifier 0 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 124.65 CHF/h on a daywork basis and a foreman or team leader 150.20 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker124.65CHF/h
- Foreman / team leader150.20CHF/h
- Helper114.60CHF/h
- Apprentice50.75CHF/h
- Regional ACIP coefficient1.00Vaud
Prices of the key items of CFC 242 heating and ventilation in the canton of Vaud
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.00; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Pipes and accessories CHV-CA-0410 · Supply and fitting of a manual radiator valve, straight or angle, with double adjustment, with a diameter of… | pc | 142.10 | 167.20 | 209.00 | — | |
| Heat generation CHV-PC-0240 · Supply and fitting on the boiler of a pre-wired hydraulic and control module for an output of… | pc | 7'717.70 | 9'079.65 | 11'349.55 | — | |
| Insulation of pipework CHV-IS-0110 · Complete thermal insulation of pipe with shells of mineral fibre thirty millimetres thick, covered with a… | ml | 34.25 | 40.30 | 50.40 | — | |
| Ventilation of bathrooms, building toilets CHV-VB-0160 · Supply and fitting of an individual mechanical extraction for a sanitary room comprising the single-phase fan… | pc | 1'006.05 | 1'183.60 | 1'479.50 | — | |
| Radiator valves CHV-VR-0020 · Complete equipment of a heating point in single-pipe distribution from the boiler room, including the radiator… | pc | 1'113.65 | 1'310.20 | 1'637.75 | — | |
| Pipes and accessories CHV-CA-0170 · Supply and laying by welding of first-quality threadable black steel tube with a diameter of one and a half inches… | ml | 74.10 | 87.20 | 109.00 | — | |
| Insulation of pipework CHV-IS-0270 · Thermal insulation of hot-water heater, expansion vessel, heat exchanger or flue by mats in… | m² | 390.70 | 459.65 | 574.55 | — | |
| Ventilation of building garages CHV-VG-0010 · Installation of mechanical extract ventilation for a covered car park from four vehicles with… | m³ | 12.20 | 14.35 | 17.95 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 14 (ACIP code shown); the family has 37 entries for the first item. The 164 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Vaud)
- Average hourly rate observed (skilled worker)
- 124.65 CHF/h
- Regional ACIP coefficient
- 1.00
- Range of the chapter's rates (from helper to foreman)
- 114.60 to 150.20 CHF/h
- Hub reference agreement
- building-services agreements (EIT.swiss for electrical work, Suissetec for CVC and plumbing)
- Wage zone of the ACIP reference: Blue (Lausanne: Red).
- Reference employer charges: 34,8 % for structural work, 25,8 % for finishing work and building services; family allowance rate (CAF): 3,4 %.
- Hub reference agreement for this trade: building-services agreement for heating, ventilation, air conditioning (CVC) and plumbing (Suissetec). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Lausanne +5 %, Nyon/Morges +5 %, Montreux/Vevey +3 %, Villars +10 %.
- The locality with the highest uplift in the canton in the reference is Villars (+10 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 14 (Heating ventilation) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 242, 244 (CFC) and 531, 541 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 242 heating and ventilation (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: heating and ventilation in the canton of Vaud
What is the daywork hourly rate for heating and ventilation in the canton of Vaud?
According to the 2026 ACIP price list, a skilled worker is charged 124.65 CHF/h on a daywork basis in the canton of Vaud, a foreman or team leader 150.20 CHF/h and a helper 114.60 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 14 multiplied by the regional coefficient 1.00.
What is the regional ACIP coefficient for Vaud?
The ACIP coefficient of Vaud is 1.00 (cantonal modifier 0 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Pipes and accessories” cost in the canton of Vaud?
The ACIP item CHV-CA-0410 (Pipes and accessories, unit pc) is estimated at 167.20 CHF/pc excl. VAT in the canton of Vaud, with a range of 142.10 to 209.00 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 167.20 CHF/pc.
Which collective agreement applies to heating and ventilation in the canton of Vaud?
The hub's reference links this trade to the building-services agreement for heating, ventilation, air conditioning (CVC) and plumbing (Suissetec). In the canton of Vaud, the wage zone shown is “Blue (Lausanne: Red)” and the reference employer charges are 25,8 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 242 heating and ventilation prices in the other cantons
See also the CFC 242 prices: Geneva (coefficient 1.12, skilled worker 139.60 CHF/h), Valais (coefficient 0.95, skilled worker 118.40 CHF/h), Fribourg (coefficient 0.98, skilled worker 122.15 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 120.90 CHF/h), Jura (coefficient 0.94, skilled worker 117.15 CHF/h), Bern (coefficient 1.02, skilled worker 127.15 CHF/h).
Other trades in the canton of Vaud
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.16: 16. Heating & Heat Pumps (PAC)
- Tool 6.17: 17. Ventilation (CVC)
- Downloadable pack: Quote & Bid Template by CFC
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
