CFC 221 Windows and joinery prices in the canton of Vaud — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Windows, doors and joinery” (CFC 221 / 273) for the canton of Vaud. ACIP chapter no. 18 contains 808 entries, of which 576 are priced items in Swiss francs, excluding VAT (HT), spread over 28 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Vaud, the regional ACIP coefficient is 1.00 (cantonal modifier 0 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 112.80 CHF/h on a daywork basis and a foreman or team leader 122.20 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker112.80CHF/h
- Foreman / team leader122.20CHF/h
- Helper104.15CHF/h
- Apprentice49.25CHF/h
- Regional ACIP coefficient1.00Vaud
Prices of the key items of CFC 221 windows and joinery in the canton of Vaud
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.00; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Double-glazed or insulating windows and French windows MEN-FE-0190 · Two-casement window, without glazing bars, frame up to fifty-five millimetres, sill piece… | pc | 1'086.35 | 1'278.05 | 1'597.55 | — | |
| Single-glazed windows and French windows MEN-FP-0660 · Simple double-casement glazed door, without glazing bars, casement of twenty-six millimetres, frame of… | m² | 367.65 | 432.50 | 540.65 | — | |
| Cupboards MEN-AR-0080 · Plain cupboard front above a two-door frame, type in medium-density fibreboard lined on the side… | m² | 248.90 | 292.85 | 366.05 | — | |
| Skirting boards and trims MEN-PL-0040 · Skirting without capping up to sixteen millimetres thick, laid above walls, plugs included, from seven to… | ml | 26.25 | 30.90 | 38.65 | — | |
| Doors MEN-PO-0020 · Solid door on surface-mounted frame of section eighty by thirty-two millimetres to be painted, with… | pc | 618.95 | 728.20 | 910.25 | — | |
| Mouldings and handrails MEN-MM-0230 · Straight handrail of rectangular section, screwed over metalwork, corner joints not included, one hundred… | ml | 249.10 | 293.05 | 366.30 | — | |
| Assembled wood panelling MEN-BS-0020 · Smooth wood panelling without boarding, nineteen-millimetre chipboard, one visible face, oak veneer | m² | 416.70 | 490.25 | 612.80 | — | |
| Insulation MEN-IS-0040 · Installation and supply of mineral wool boards of standard type, without vapour barrier, laid in walls… | m² | 32.35 | 38.05 | 47.55 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 18 (ACIP code shown); the family has 42 entries for the first item. The 576 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Vaud)
- Average hourly rate observed (skilled worker)
- 112.80 CHF/h
- Regional ACIP coefficient
- 1.00
- Range of the chapter's rates (from helper to foreman)
- 104.15 to 122.20 CHF/h
- Hub reference agreement
- collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
- Wage zone of the ACIP reference: Blue (Lausanne: Red).
- Reference employer charges: 34,8 % for structural work, 25,8 % for finishing work and building services; family allowance rate (CAF): 3,4 %.
- Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Lausanne +5 %, Nyon/Morges +5 %, Montreux/Vevey +3 %, Villars +10 %.
- The locality with the highest uplift in the canton in the reference is Villars (+10 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 18 (Joinery) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 221, 273 (CFC) and 371, 622 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 221 windows and joinery (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: windows and joinery in the canton of Vaud
What is the daywork hourly rate for windows and joinery in the canton of Vaud?
According to the 2026 ACIP price list, a skilled worker is charged 112.80 CHF/h on a daywork basis in the canton of Vaud, a foreman or team leader 122.20 CHF/h and a helper 104.15 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 18 multiplied by the regional coefficient 1.00.
What is the regional ACIP coefficient for Vaud?
The ACIP coefficient of Vaud is 1.00 (cantonal modifier 0 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Double-glazed or insulating windows and French windows” cost in the canton of Vaud?
The ACIP item MEN-FE-0190 (Double-glazed or insulating windows and French windows, unit pc) is estimated at 1'278.05 CHF/pc excl. VAT in the canton of Vaud, with a range of 1'086.35 to 1'597.55 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 1'278.05 CHF/pc.
Which collective agreement applies to windows and joinery in the canton of Vaud?
The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Vaud, the wage zone shown is “Blue (Lausanne: Red)” and the reference employer charges are 25,8 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 221 windows and joinery prices in the other cantons
See also the CFC 221 prices: Geneva (coefficient 1.12, skilled worker 126.35 CHF/h), Valais (coefficient 0.95, skilled worker 107.15 CHF/h), Fribourg (coefficient 0.98, skilled worker 110.55 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 109.40 CHF/h), Jura (coefficient 0.94, skilled worker 106.05 CHF/h), Bern (coefficient 1.02, skilled worker 115.05 CHF/h).
Other trades in the canton of Vaud
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.14: 14. Windows & External Doors
- Tool 6.27: 27. Interior Joinery
- Downloadable pack: As-Built Documentation (DOE) & Maintenance Log Pack (SIA 469)
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
