CFC 211 Scaffolding prices in the canton of Geneva — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Facade and roof scaffolding” (CFC 211.1) for the canton of Geneva. ACIP chapter no. 4 contains 58 entries, of which 31 are priced items in Swiss francs, excluding VAT (HT), spread over 6 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 132.70 CHF/h on a daywork basis and a foreman or team leader 155.40 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker132.70CHF/h
- Foreman / team leader155.40CHF/h
- Helpern/aCHF/h
- Apprentice53.75CHF/h
- Regional ACIP coefficient1.12Geneva
Prices of the key items of CFC 211 scaffolding in the canton of Geneva
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Facade scaffolding ECH-EF-0060 · Light tubular-frame scaffolding for painting work, useful width of sixty centimetres, useful load of… | m² | 27.95 | 32.85 | 41.10 | — | |
| Temporary roofs ECH-TP-0040 · Erection, two-month hire and removal of a temporary timber roof under plastic sheeting on rafters, without boarding… | m² | 161.60 | 190.10 | 237.65 | — | |
| Cornices and mobile scaffold towers ECH-CT-0080 · Provision of a protected passage, pedestrian protection tunnel at the foot of the scaffolding, ceiling rate | ml | 253.95 | 298.75 | 373.45 | — | |
| Facade scaffolding ECH-EF-0190 · Installation of inclined access ladders fitted with handrails and a hinged starting element | ml | 55.95 | 65.80 | 82.25 | — | |
| Facade scaffolding ECH-EF-0130 · Light scaffolding with timber poles and metal brackets for painting, useful width of sixty centimetres, load… | m² | 23.95 | 28.15 | 35.20 | — | |
| Temporary roofs ECH-TP-0090 · Installation of a protective screen in reed matting or nylon netting with frame intended for the temporary roof, rate… | m² | 47.85 | 56.30 | 70.35 | — | |
| Temporary roofs ECH-TP-0050 · Erection, two-month hire and removal of a temporary timber roof under plastic sheeting on rafters, without boarding… | m² | 185.90 | 218.70 | 273.35 | — | |
| Facade scaffolding ECH-EF-0220 · Protective front or side sheeting of the scaffolding with tarpaulin or plastic sheet | m² | 16.85 | 19.80 | 24.80 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 4 (ACIP code shown); the family has 10 entries for the first item. The 31 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Geneva)
- Average hourly rate observed (skilled worker)
- 132.70 CHF/h
- Regional ACIP coefficient
- 1.12
- Range of the chapter's rates (from helper to foreman)
- 132.70 to 155.40 CHF/h
- Hub reference agreement
- National Agreement for the Structural Building Trades (CN)
- Wage zone of the ACIP reference: Red.
- Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
- Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
- The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 4 (Scaffolding) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 211.1 (CFC) and 114 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 211 scaffolding (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: scaffolding in the canton of Geneva
What is the daywork hourly rate for scaffolding in the canton of Geneva?
According to the 2026 ACIP price list, a skilled worker is charged 132.70 CHF/h on a daywork basis in the canton of Geneva and a foreman or team leader 155.40 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 4 multiplied by the regional coefficient 1.12.
What is the regional ACIP coefficient for Geneva?
The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Facade scaffolding” cost in the canton of Geneva?
The ACIP item ECH-EF-0060 (Facade scaffolding, unit m²) is estimated at 32.85 CHF/m² excl. VAT in the canton of Geneva, with a range of 27.95 to 41.10 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 29.35 CHF/m².
Which collective agreement applies to scaffolding in the canton of Geneva?
The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Geneva, the wage zone shown is “Red” and the reference employer charges are 35,2 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 211 scaffolding prices in the other cantons
See also the CFC 211 prices: Vaud (coefficient 1.00, skilled worker 118.50 CHF/h), Valais (coefficient 0.95, skilled worker 112.60 CHF/h), Fribourg (coefficient 0.98, skilled worker 116.15 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 114.95 CHF/h), Jura (coefficient 0.94, skilled worker 111.40 CHF/h), Bern (coefficient 1.02, skilled worker 120.85 CHF/h).
Other trades in the canton of Geneva
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.13: 13. Scaffolding
- Downloadable pack: Criminal Liability Protocol (Art. 229 CP) & STOP Right to Stop Work
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.