Skip to content
Website
ACIP · Art Construction Price Index CFC 242 / 244 ACIP chapter no. 14 2026 edition

CFC 242 Heating and ventilation prices in the canton of Geneva — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Heating and ventilation” (CFC 242 / 244) for the canton of Geneva. ACIP chapter no. 14 contains 205 entries, of which 164 are priced items in Swiss francs, excluding VAT (HT), spread over 12 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 139.60 CHF/h on a daywork basis and a foreman or team leader 168.20 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker139.60CHF/h
  • Foreman / team leader168.20CHF/h
  • Helper128.35CHF/h
  • Apprentice56.85CHF/h
  • Regional ACIP coefficient1.12Geneva

Prices of the key items of CFC 242 heating and ventilation in the canton of Geneva

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Pipes and accessories CHV-CA-0410 · Supply and fitting of a manual radiator valve, straight or angle, with double adjustment, with a diameter of… pc 159.15 187.25 234.10 —
Heat generation CHV-PC-0240 · Supply and fitting on the boiler of a pre-wired hydraulic and control module for an output of… pc 8'643.85 10'169.20 12'711.50 —
Insulation of pipework CHV-IS-0110 · Complete thermal insulation of pipe with shells of mineral fibre thirty millimetres thick, covered with a… ml 38.35 45.15 56.40 —
Ventilation of bathrooms, building toilets CHV-VB-0160 · Supply and fitting of an individual mechanical extraction for a sanitary room comprising the single-phase fan… pc 1'126.80 1'325.65 1'657.05 —
Radiator valves CHV-VR-0020 · Complete equipment of a heating point in single-pipe distribution from the boiler room, including the radiator… pc 1'247.30 1'467.40 1'834.30 —
Pipes and accessories CHV-CA-0170 · Supply and laying by welding of first-quality threadable black steel tube with a diameter of one and a half inches… ml 83.00 97.65 122.10 —
Insulation of pipework CHV-IS-0270 · Thermal insulation of hot-water heater, expansion vessel, heat exchanger or flue by mats in… m² 437.60 514.80 643.50 —
Ventilation of building garages CHV-VG-0010 · Installation of mechanical extract ventilation for a covered car park from four vehicles with… m³ 13.65 16.05 20.10 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 14 (ACIP code shown); the family has 37 entries for the first item. The 164 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Geneva)

Average hourly rate observed (skilled worker)
139.60 CHF/h
Regional ACIP coefficient
1.12
Range of the chapter's rates (from helper to foreman)
128.35 to 168.20 CHF/h
Hub reference agreement
building-services agreements (EIT.swiss for electrical work, Suissetec for CVC and plumbing)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
  • Hub reference agreement for this trade: building-services agreement for heating, ventilation, air conditioning (CVC) and plumbing (Suissetec). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
  • The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.

Source: ACIP 2026 workbook no. 14 (Heating ventilation) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 242, 244 (CFC) and 531, 541 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 242 heating and ventilation (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: heating and ventilation in the canton of Geneva

What is the daywork hourly rate for heating and ventilation in the canton of Geneva?

According to the 2026 ACIP price list, a skilled worker is charged 139.60 CHF/h on a daywork basis in the canton of Geneva, a foreman or team leader 168.20 CHF/h and a helper 128.35 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 14 multiplied by the regional coefficient 1.12.

What is the regional ACIP coefficient for Geneva?

The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Pipes and accessories” cost in the canton of Geneva?

The ACIP item CHV-CA-0410 (Pipes and accessories, unit pc) is estimated at 187.25 CHF/pc excl. VAT in the canton of Geneva, with a range of 159.15 to 234.10 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 167.20 CHF/pc.

Which collective agreement applies to heating and ventilation in the canton of Geneva?

The hub's reference links this trade to the building-services agreement for heating, ventilation, air conditioning (CVC) and plumbing (Suissetec). In the canton of Geneva, the wage zone shown is “Red” and the reference employer charges are 26,2 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 242 heating and ventilation prices in the other cantons

See also the CFC 242 prices: Vaud (coefficient 1.00, skilled worker 124.65 CHF/h), Valais (coefficient 0.95, skilled worker 118.40 CHF/h), Fribourg (coefficient 0.98, skilled worker 122.15 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 120.90 CHF/h), Jura (coefficient 0.94, skilled worker 117.15 CHF/h), Bern (coefficient 1.02, skilled worker 127.15 CHF/h).

Other trades in the canton of Geneva

Hub tools and pack for this trade

Price this chapter in Soumission. The 164 items of ACIP chapter no. 14, adjusted for the canton, directly in your quotes. Discover Soumission