Skip to content
Website
ACIP · Art Construction Price Index CFC 281.6 / 282 ACIP chapter no. 24 2026 edition

CFC 281 Tiles and ceramics prices in the canton of Geneva — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Tiles and ceramic coverings” (CFC 281.6 / 282) for the canton of Geneva. ACIP chapter no. 24 contains 223 entries, of which 101 are priced items in Swiss francs, excluding VAT (HT), spread over 8 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 110.50 CHF/h on a daywork basis and a foreman or team leader 116.30 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker110.50CHF/h
  • Foreman / team leader116.30CHF/h
  • Helper107.50CHF/h
  • Apprentice52.70CHF/h
  • Regional ACIP coefficient1.12Geneva

Prices of the key items of CFC 281 tiles and ceramics in the canton of Geneva

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Preparatory work for measurement CAR-PR-0280 · Water- and oil-repellent protective treatment by penetrating impregnation on coverings in stoneware, natural stone… m² 45.20 53.20 66.50 —
Skirting boards CAR-PL-0070 · Straight laying with adhesive of a natural stone skirting with a height less than or equal to ten centimetres… ml 24.05 28.30 35.35 —
Miscellaneous work CAR-DV-0190 · Construction and fitting of the apron panelling of the transverse side of a bath over a width of seventy… pc 156.20 183.75 229.65 —
Stair treads CAR-ME-0010 · Glued laying of a straight stair tread and its riser in ceramic tiles of thirty centimetres by… ml 96.95 114.05 142.60 —
Tiling, floors and walls CAR-CS-0070 · Straight laying of floor tiling in thin bed with normal tile adhesive mortar for tiles of a format larger than ten… m² 81.50 95.85 119.85 —
Miscellaneous work CAR-DV-0310 · Supply and laying of an aluminium edge finishing and protection profile with a height less than or equal to… ml 45.15 53.15 66.45 —
Preparatory work for measurement CAR-PR-0190 · Supply and fitting of temporary mechanical protection on straight stair treads by means of boards… ml 36.70 43.20 53.95 —
Preparatory work for measurement CAR-PR-0180 · Supply and fitting of temporary mechanical protection of finished floors by means of wood-fibre boards… m² 22.90 26.95 33.65 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 24 (ACIP code shown); the family has 26 entries for the first item. The 101 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Geneva)

Average hourly rate observed (skilled worker)
110.50 CHF/h
Regional ACIP coefficient
1.12
Range of the chapter's rates (from helper to foreman)
107.50 to 116.30 CHF/h
Hub reference agreement
collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
  • Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
  • The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.

Source: ACIP 2026 workbook no. 24 (Tiles coverings) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 281.6, 282 (CFC) and 671 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 281 tiles and ceramics (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: tiles and ceramics in the canton of Geneva

What is the daywork hourly rate for tiles and ceramics in the canton of Geneva?

According to the 2026 ACIP price list, a skilled worker is charged 110.50 CHF/h on a daywork basis in the canton of Geneva, a foreman or team leader 116.30 CHF/h and a helper 107.50 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 24 multiplied by the regional coefficient 1.12.

What is the regional ACIP coefficient for Geneva?

The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Preparatory work for measurement” cost in the canton of Geneva?

The ACIP item CAR-PR-0280 (Preparatory work for measurement, unit m²) is estimated at 53.20 CHF/m² excl. VAT in the canton of Geneva, with a range of 45.20 to 66.50 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 47.50 CHF/m².

Which collective agreement applies to tiles and ceramics in the canton of Geneva?

The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Geneva, the wage zone shown is “Red” and the reference employer charges are 26,2 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 281 tiles and ceramics prices in the other cantons

See also the CFC 281 prices: Vaud (coefficient 1.00, skilled worker 98.65 CHF/h), Valais (coefficient 0.95, skilled worker 93.70 CHF/h), Fribourg (coefficient 0.98, skilled worker 96.70 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 95.70 CHF/h), Jura (coefficient 0.94, skilled worker 92.75 CHF/h), Bern (coefficient 1.02, skilled worker 100.60 CHF/h).

Other trades in the canton of Geneva

Hub tools and pack for this trade

Price this chapter in Soumission. The 101 items of ACIP chapter no. 24, adjusted for the canton, directly in your quotes. Discover Soumission