Skip to content
Website
ACIP · Art Construction Price Index CFC 214 ACIP chapter no. 8 2026 edition

CFC 214 Timber structures prices in the canton of Geneva — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Timber structures and carpentry” (CFC 214) for the canton of Geneva. ACIP chapter no. 8 contains 802 entries, of which 564 are priced items in Swiss francs, excluding VAT (HT), spread over 33 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 109.65 CHF/h on a daywork basis and a foreman or team leader 131.40 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker109.65CHF/h
  • Foreman / team leader131.40CHF/h
  • Helper108.85CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient1.12Geneva

Prices of the key items of CFC 214 timber structures in the canton of Geneva

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Insulation CBO-IO-0230 · Mineral fibre board from glass or rock, eighteen to thirty-two kilograms per cubic metre… m² 34.65 40.75 50.95 —
Stairs CBO-ES-1360 · Covering laid under the landing strip flooring, finished on one face, twenty millimetres thick, width of fifteen to… ml 87.55 103.00 128.75 —
Cornices CBO-CO-0060 · Trapezoidal eaves batten, section eight by fourteen ml 38.30 45.10 56.35 —
Walls and ceilings CBO-PA-0280 · Interior lining in non-standard boards with chamfers, thirteen millimetres thick, minimum width eight centimetres… m² 102.60 120.70 150.85 —
Coverings CBO-RE-0070 · Close-jointed lining, excluding battening and joint covers, medium-hard fibreboard, six millimetres, ceilings between beams m² 69.80 82.10 102.60 —
Rafter work CBO-CH-0050 · Rafter up to eight metres in length, sawn on four faces, section eight by sixteen centimetres, permitted wane of… ml 26.25 30.85 38.55 —
Roof boarding CBO-LT-0110 · Boarding laid with an overlap of three centimetres, measured not developed, in boards of twenty-four millimetres m² 44.10 51.85 64.80 —
Planed floorboards CBO-PR-0050 · Floor of crested boards, planed on one face, width of eight to thirteen centimetres, second choice, finished thickness… m² 95.35 112.15 140.20 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 8 (ACIP code shown); the family has 58 entries for the first item. The 564 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Geneva)

Average hourly rate observed (skilled worker)
109.65 CHF/h
Regional ACIP coefficient
1.12
Range of the chapter's rates (from helper to foreman)
108.85 to 131.40 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 8. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
  • The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.

Source: ACIP 2026 workbook no. 8 (Carpentry) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 214 (CFC) and 331 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 214 timber structures (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: timber structures in the canton of Geneva

What is the daywork hourly rate for timber structures in the canton of Geneva?

According to the 2026 ACIP price list, a skilled worker is charged 109.65 CHF/h on a daywork basis in the canton of Geneva, a foreman or team leader 131.40 CHF/h and a helper 108.85 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 8 multiplied by the regional coefficient 1.12.

What is the regional ACIP coefficient for Geneva?

The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Insulation” cost in the canton of Geneva?

The ACIP item CBO-IO-0230 (Insulation, unit m²) is estimated at 40.75 CHF/m² excl. VAT in the canton of Geneva, with a range of 34.65 to 50.95 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 36.40 CHF/m².

Which collective agreement applies to timber structures in the canton of Geneva?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 8; the collective agreement that applies in the canton of Geneva must be checked with your trade association.

See also

CFC 214 timber structures prices in the other cantons

See also the CFC 214 prices: Vaud (coefficient 1.00, skilled worker 97.90 CHF/h), Valais (coefficient 0.95, skilled worker 93.00 CHF/h), Fribourg (coefficient 0.98, skilled worker 95.95 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 94.95 CHF/h), Jura (coefficient 0.94, skilled worker 92.05 CHF/h), Bern (coefficient 1.02, skilled worker 99.85 CHF/h).

Other trades in the canton of Geneva

Hub tools and pack for this trade

Price this chapter in Soumission. The 564 items of ACIP chapter no. 8, adjusted for the canton, directly in your quotes. Discover Soumission