CFC 271 Plastering and partitions prices in the canton of Geneva — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Plastering, drywall partitions and interior insulation” (CFC 271) for the canton of Geneva. ACIP chapter no. 17 contains 932 entries, of which 732 are priced items in Swiss francs, excluding VAT (HT), spread over 22 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 114.95 CHF/h on a daywork basis and a foreman or team leader 123.95 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker114.95CHF/h
- Foreman / team leader123.95CHF/h
- Helper99.90CHF/h
- Apprentice42.15CHF/h
- Regional ACIP coefficient1.12Geneva
Prices of the key items of CFC 271 plastering and partitions in the canton of Geneva
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Plinths, bases and skirting boards PLA-SS-0620 · Stainless steel skirting, twelve centimetres wide, mounted on extruded polystyrene insulation of twenty… | ml | 114.00 | 134.10 | 167.65 | — | |
| Solid partitions, linings PLA-CL-0370 · Erection and supply of lining based on plaster blocks with bonded insulation in water-repellent expanded polystyrene, tile… | m² | 118.65 | 139.60 | 174.50 | — | |
| Internal insulation PLA-IS-0280 · Supply and installation of insulating glass fibre boards on the ceiling, including mechanical fixing, thickness fifty… | m² | 39.35 | 46.30 | 57.90 | — | |
| Window frames and reveals PLA-EE-0320 · Supply and installation of window frames made of fibre-reinforced concrete, projecting surround, with rebate as well as insulation… | ml | 239.20 | 281.40 | 351.75 | — | |
| Plasters on walls PLA-EM-0460 · Class three, high-specification plastering for decorations of less than one millimetre, finely textured appearance or matt paint… | m² | 14.70 | 17.30 | 21.65 | — | |
| Lightweight partitions, infill walls PLA-CG-0620 · Cut-out round opening, diameter twenty to thirty centimetres, second occurrence | pc | 29.25 | 34.40 | 43.00 | — | |
| Pointing and fixing work PLA-TJ-0160 · Plinth connection in open air, metal profile with drip, profile of one hundred and twenty millimetres | ml | 37.20 | 43.80 | 54.75 | — | |
| Solid partitions, infill walls PLA-CM-0320 · Making and laying below infill of a cork sole, reference zero one zero | ml | 12.65 | 14.90 | 18.60 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 17 (ACIP code shown); the family has 88 entries for the first item. The 732 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Geneva)
- Average hourly rate observed (skilled worker)
- 114.95 CHF/h
- Regional ACIP coefficient
- 1.12
- Range of the chapter's rates (from helper to foreman)
- 99.90 to 123.95 CHF/h
- Hub reference agreement
- collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
- Wage zone of the ACIP reference: Red.
- Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
- Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
- The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 17 (Plastering insulation) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 271 (CFC) and 661 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 271 plastering and partitions (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: plastering and partitions in the canton of Geneva
What is the daywork hourly rate for plastering and partitions in the canton of Geneva?
According to the 2026 ACIP price list, a skilled worker is charged 114.95 CHF/h on a daywork basis in the canton of Geneva, a foreman or team leader 123.95 CHF/h and a helper 99.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 17 multiplied by the regional coefficient 1.12.
What is the regional ACIP coefficient for Geneva?
The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Plinths, bases and skirting boards” cost in the canton of Geneva?
The ACIP item PLA-SS-0620 (Plinths, bases and skirting boards, unit ml) is estimated at 134.10 CHF/ml excl. VAT in the canton of Geneva, with a range of 114.00 to 167.65 CHF/ml (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 119.75 CHF/ml.
Which collective agreement applies to plastering and partitions in the canton of Geneva?
The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Geneva, the wage zone shown is “Red” and the reference employer charges are 26,2 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 271 plastering and partitions prices in the other cantons
See also the CFC 271 prices: Vaud (coefficient 1.00, skilled worker 102.65 CHF/h), Valais (coefficient 0.95, skilled worker 97.50 CHF/h), Fribourg (coefficient 0.98, skilled worker 100.60 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 99.55 CHF/h), Jura (coefficient 0.94, skilled worker 96.50 CHF/h), Bern (coefficient 1.02, skilled worker 104.70 CHF/h).
Other trades in the canton of Geneva
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.22: 22. Plastering & Drywall
- Downloadable pack: Site Memo: Tolerances in SIA Standards
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
