Timber joints, fittings, and fixings: the execution standard
Aimed at Swiss carpentry team leaders, foremen, and site managers, this guide details the rigorous installation of structural connections. From selecting metal fasteners to traditional cutting and masonry anchoring, it compiles the execution rules to ensure the safety and compliance of load-bearing joints according to current standards.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
100 cm
Minimum height of the top rail of a protective guardrail
2 m
Fall height triggering the installation of edge protection
3 m
Fall height requiring the erection of facade scaffolding
50 cm
Minimum clear width along the edge of a supported trench
Technical scope of joints and execution responsibilities
The overall integrity of a timber structure depends directly on the execution of its joints. This document brings together the state-of-the-art rules governing the transmission of mechanical forces between timber components, whether light framing, cross-laminated timber, or heavy traditional timber. Rigorous application of the SIA 265 and SIA 265/1 standards governs stability at ultimate and serviceability limit states by controlling brittle failure modes such as splitting, block shear, or pull-out.
Each type of fastening responds to specific rheological and mechanical behaviour. Installing threaded rods, bolts, or metal fittings requires full consideration of the cross-grain shrinkage of timber during changes in equilibrium moisture content. Neglecting the hygroscopic behaviour of the material or altering a prefabricated connection incurs the direct liability of the installer on the construction site.
Breaching recognized rules of the art of building while managing or executing work incurs the criminal liability of the practitioner in the event of endangerment to life and limb pursuant to CP.
Swiss Criminal Code
Managing the interface with the structural work requires scrupulous adherence to barriers against residual moisture in concrete. Likewise, chemical interactions between wood tannins, preservation treatments, and connector metals dictate the mandatory selection of corrosion protection classes for atmospheric exposure.
Execution method: logical sequence of installation on the construction site
Learning and applying fastening techniques follows a precise operational logic, moving from linear fasteners through to complex rehabilitation and durability interventions in exposed environments.
- Modern screwed fixings and joist hangersFirst master the positioning of structural screws (centre-to-centre spacings, edge distances, pre-drilling) to prevent wood splitting, then inspect full nailing of joist hangers using suitable ring-shank nails, excluding non-certified screws.
- Traditional cutting and bolted connectionsStudy step joints and mortise-and-tenons to determine their permissible force limits, then address through-bolting by incorporating large bearing washers and scheduled retightening following timber drying.
- Anchorage interfaces and concealed fittingsEnsure the bearing of bottom plates on concrete with a capillary break and adequate anchors, before completing the millimetre-accurate machining of concealed dowel or dovetail connectors.
- Industrial structures and construction site limitationsUnderstand the prohibition against cutting the chords of trussed elements joined by metal plate connectors, and ban the use of unmonitored structural gluing in an unregulated construction site environment.
- Rehabilitation and joint preservationApply flitch-plate techniques and mechanical splices on degraded timber framing, then verify the steel corrosivity category and mandatory use of stainless steel.
Following these chapters methodically enables site management to approve every structural node before it is covered up, thus guaranteeing the compliance of the finished structure with the structural requirements of standard SIA 265.
📘 Chapters in this section 10
Structural screws: pre-drilling, spacing, and edge distances
Master edge distances and pre-drilling to eliminate any risk of wood splitting.
Timber connections, ironmongery and fastenersJoist hanger: full nailing, nail types, and errors voiding load capacity
Select compliant ring-shank nails and avoid nailing patterns that void load-bearing capacity.
Timber connections, ironmongery and fastenersMortise-and-tenon and birdsmouth joints: traditional connections and their limits
Identify actual load capacities of step joints and detect critical tensile stresses.
Timber connections, ironmongery and fastenersBolting timber: wide washers, tightening, and retightening after drying
Size bearing washers to prevent cross-grain crushing and schedule retightening.
Timber connections, ironmongery and fastenersAnchoring a timber sole plate to concrete: threaded rod, chemical anchoring and damp-proof membrane
Ensure a capillary break beneath bottom plates and anchor threaded rods with precision.
Timber connections, ironmongery and fastenersConcealed connector: machining, interlocking tolerance and inspection prior to closing up
Comply with machining tolerances and inspect dowel positioning before final closing.
Timber connections, ironmongery and fastenersPunched metal plate truss: never recut, never drill
Maintain trussed rafter integrity by avoiding chord cuts or uncalculated drilling.
Timber connections, ironmongery and fastenersStructural gluing on site: why it is almost always a bad idea
Understand the moisture and pressure constraints that make structural gluing impossible on the construction site.
Timber connections, ironmongery and fastenersReinforcing an old joint: flitch plating, scarf graft and load transfer
Design effective flitch repairs and rigid splices to take up loads without weakening existing timber.
Timber connections, ironmongery and fastenersCorrosion of fittings: when zinc-plated steel is no longer enough and stainless steel is required
Determine the corrosivity category requiring stainless steel in contact with tannic or treated wood.