Key takeaways
- A rigorous survey of the structural work accommodates concrete tolerances before any setting out begins.
- The floor layout establishes reference faces and neutral axes at full scale.
- The bevel gauge and centreline gauge ensure accurate transfer onto rough timber.
- A trial dry assembly validates joint housing before dispatch to the erection site.
Surveying substrate dimensions and aligning the layout with reality
On a construction site, working drawings supplied by the design office reflect theoretically perfect geometry. However, reinforced concrete wall tops, brick wall heads, or steel supports inevitably show variations in flatness, squareness, or plumb. Basing cutting solely on theoretical dimensions exposes the carpenter to tedious reworking during lifting. A methodical on-site survey is the first essential step in full-scale setting out.
The site foreman must survey the actual diagonals between wall plates, the elevation of bearing pads, and the straightness of wall heads. These measurements make it possible to redefine the work's datum line and detect any distortions in the structural work. Moreover, art. 365 CO requires the contractor, if the material supplied by the employer or the ground designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, to inform the employer. This formal clarification avoids disputes when the timber frame must compensate for a discrepancy in wall-top levels.
- Checking diagonals and wall topsCheck the squareness of the structural work using a rod gauge or theodolite. Record elevation discrepancies at every future bearing point of the truss or purlin.
- Preparing the survey drawingTransfer the measured actual dimensions into a setting-out logbook, establishing the building's neutral axis and the zero-datum wall-top level.
- Preparing the setting-out floorClean a three-ply panel floor or a flat workshop floor. Mark out the primary grid line using a blue chalk line or a scriber.
- Geometric layout of the full-scale drawingConstruct the half-truss or full truss by projecting ridge heights, actual pitches, and wall-top levels surveyed on the structure.
Transferring lines, pricking, and checking joints before cutting
The full-scale layout drawn on the workshop floor serves as an absolute 1:1 template. Rough or glued-laminated timber components (rafters, collar ties, king posts, struts) are placed directly by overlaying them on the reference lines. To ensure cutting is right the first time, the carpenter does not measure lengths timber by timber: he transfers axis intersections and cogged joints directly by plumbing down using a square, marking gauge, bevel square, and plumb bob.
| Operation | Tool used | Critical check point |
|---|---|---|
| Axis projection | Plumb bob or try square with stock | Strict alignment with the layout line hidden beneath the timber |
| Surveying cut angles | Bevel square or locked bevel gauge | Tightening the thumb screw to prevent any angular variation |
| Marking shoulders and tenons | Marking gauge and steel rule | Transfer from the designated face side without cumulative play |
| Marking timber | Scorer or carpenter's grease pencil | Component numbering and installation direction towards the outer face |
Before starting end-trimming and chain mortising, a cross-checking phase is mandatory. Pricking with dividers is used to mark the centres of cogged joints and check cumulative lengths along the rafter. Complex joints, such as raking tenons or birdsmouth cogging, must be checked by sample testing using a plywood reference template.
Cutting to the line and carrying out manual or machine machining
Once the full-scale layout is drawn on the workshop floor or chipboard panels, the cutting phase turns theoretical alignments and masonry-measured adjustments into reality. The carpenter applies the fundamental principle of layout lines: cut strictly leaving half the pencil or scriber line on the retained timber. For traditional trusses, each piece of rough or glued-laminated timber—principal rafter, tie beam, king post, or strut—is successively placed on the layout to receive its cogging, tenons, and mortises.
- Lining out and pricking down
- The action of superimposing rough timber onto the layout floor to transfer theoretical edges, symmetry axes, and shoulder lines using a plumb bob, framing square, and scriber.
- Positioning and chocking timber on the setting-out floorTimber pieces cut with extra length are laid out over the floor drawing. The alignment of the reference face (face side) must match the datum plane of the layout to avoid any twisting during mechanical assembly.
- Vertical transfer using a plumb bob or squareTheoretical crossing points marked on the floor are brought up onto the side and top faces of the timbers using a carpenter's plumb bob or framing square, marking the starts of shoulder lines.
- Setting out and cutting operationsEnds, single or double heel coggings at the foot of principal rafters, as well as tenons and blind mortises, are cut with a portable circular saw, then routed out with a chain mortiser or roughed out with a framing chisel and finished with a mortise chisel.
| Joint type | Primary tools | Permissible fitting play | Critical inspection point |
|---|---|---|---|
| Front cogging (rafter foot / tie beam) | Circular saw with pivoting guard, 40 mm framing chisel | Less than 1 mm at the heel | Flatness of the throat and bearing angle perpendicular to axial thrust |
| Mortise and tenon (king post / rafter) | Chain mortiser or drill with auger bits, mortise chisel | 0.5 mm on cheeks, 5 to 10 mm at bottom of mortise | Depth to accommodate the tenon tip without binding during radial shrinkage |
| Bolted tie beam or sandwich splice | Carpentry drill with auger bit, spirit level | Nominal drilling diameter matching the rod | Absolute squareness of the hole to prevent edge shear |
During cutting, the carpenter accounts for future moisture shrinkage in the timber. If solid spruce or fir timber has a moisture content above the equilibrium level of the finished structure, a deliberate slight step at the bearing levels ensures contact surfaces bear pure axial compression once dry, without opening up the cogging heels.
Dry assembly, geometric inspection, and lifting preparation
Before any loading for transport or bundling for the construction site, the truss or complex sub-assembly must undergo a complete dry run in the workshop. This trial assembly on the working floor confirms joint alignment, exact bearing angles, and strict compliance with dimensions surveyed from the structural work. If discrepancies appear between the full-scale layout and the concrete wall-top levels surveyed on the construction site, art. 365 CO al. 3 stipulates that if the material supplied by the employer or the ground designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, the contractor must immediately notify the employer, under pain of bearing the consequences.
The final inspection focuses on measuring the diagonals of the triangulation (tie beam-king post-rafters). Agreement to the millimetre guarantees that the ridge remains straight during lifting. Through-holes for dowels, coach screws, or cylindrical drift pins are drilled in the workshop as soon as the dry run is complete, avoiding awkward and strenuous drilling from an unstable position on the scaffolding. The employer implements the necessary technical measures to make these operations safe in accordance with the Construction Work Ordinance.
- Checking overall squareness using the cross-diagonal method on bearing points.
- Verifying the absence of gaps under cogging heels using a 0.5 mm feeler gauge.
- Systematic piece numbering using a gouge or grease pencil according to the lifting marking plan.
- Marking balanced slinging points for the site crane on tie beams and principal rafters.
Managing masonry discrepancies, adjusting the layout, and responsibilities
On a construction site, the reality of the structural work frequently deviates from theoretical architectural plans. Out-of-plumb wall heads, variable spacing between reinforced concrete supports, uneven wall-top levels, or out-of-square walls: the carpenter cannot base his full-scale layout on assumed perfection. Full-scale setting out acts as the primary detector of dimensional discrepancies in the substrate before any wood is worked in the shop.
As soon as a joint survey highlights a geometric defect exceeding tolerances permitted by construction standards, rules require that site management be formally notified. Art. 365 CO al. 3 provides that if the material supplied by the employer or the ground designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, the contractor must immediately notify the employer. This written notice protects the enterprise before starting the sawing or recutting of solid timbers.
| Identified defect | Impact on timber framing | Corrective action on the layout |
|---|---|---|
| Concrete wall top out of level by more than 15 mm | Bowing of wall plates, point load transfer | Readjust datum line; steel shimming or levelling compound under wall plate |
| Load-bearing wall spacing larger than plan | Short coggings, insufficient tie-beam bearing | Redraw truss triangle incorporating measured span; lengthen tie beam on the layout |
| Out-of-square wall heads | Twisting of purlins, misalignment of ridge lines | Skew the floor layout to match actual diagonals; identify specific cogging angles |
If the client approves adapting the timber frame to the building's deformations, setting out must accommodate these variations without distorting the mechanical triangulation. Pricking out components is carried out directly on this modified layout. In the workshop as on the outdoor cutting yard, every dimension adjustment is recorded in the setting-out log to ensure a compliant dry assembly before dispatch to the construction site.
Frequently asked questions
How should the layout be adjusted when two gables are not parallel?
Do not average dimensions on a single layout. Draw the truss on the floor based on the largest actual span, then determine the skew by triangulating the diagonals measured on site. Mark the two tie-beam joint positions on the setting-out floor. Each truss receives a distinct location mark, ensuring that purlins bear fully without twisting the structure.
What discrepancy tolerance can a traditional truss layout absorb?
Over a typical span of 8 to 12 metres, a variation of 10 to 15 millimetres in wall spacing is easily corrected by adjusting the tie-beam heels and rafter lengths on the layout. Conversely, a wall-top level discrepancy greater than 20 millimetres requires correction by the mason or a bearing packer under the wall plate before starting to line out.
What should be done if actual dimensions require changing the rafter angle?
Any pitch change alters the height to ridge and the distribution of axial forces within the truss triangle. Redraw the layout using the ridge height permitted by the building permit and recalculate the apex cut. If the pitch variation exceeds 1 degree, formal approval from the timber engineering firm remains mandatory before making saw cuts into the rough timber.
Why record actual dimensions on the installation plan prior to cutting?
The floor layout is erased or dismantled once the timbers are cut. Recording actual dimensions surveyed from the structural work allows a unique mark to be assigned to each rafter, king post, or strut. During crane lifting, erectors immediately identify the exact location of adapted components, preventing disastrous mix-ups of twin trusses across unequal spans.
Texts and standards cited
- CO art. 365materials and ground: the contractor is responsible for the good quality of the materials he supplies; if the material supplied by the employer or the ground designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, he must immediately notify the employer, under pain of bearing the consequences (al. 3)