Skip to content
Website
🧱 CFC 214Section 3 of 610 chapters

Traditional timber framing: trusses, purlins and rafters: execution reference guide

Intended for site foremen, foremen and construction managers in French-speaking Switzerland, this dossier brings together the execution rules for traditional timber framing. From setting out the full-scale drawing to cutting king post and queen post trusses, including anchoring wall plates, bracing and working on old load-bearing structures, you have the essential benchmarks compliant with the requirements of standards SIA 265 and SIA 414 to manage the construction site.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 41 OTConst

2 m

Fall height triggering fall-arrest measures at the roof edge

art. 22 OTConst

100 cm

Minimum height of the protective guardrail top rail

art. 22 OTConst

15 cm

Minimum height of the toeboard at the foot of the guardrail

art. 22 OTConst

47 cm

Maximum clear opening between horizontal protective elements

Technical scope and intervention limits

This section deals exclusively with timber as a load-bearing material for carpentry works according to CFC 214. It addresses component geometry, traditional or dowelled joints, the dimensioning of rafters and purlins, as well as overall stability under the action of permanent loads, snow and wind. The structural analysis of tie-beam trusses and the condition assessment of old components guided by standard SIA 265 form the core of our subject.

When working on existing buildings, the carpenter limits their intervention to strengthening, sandwiching with flitch plates or surgical replacement of damaged members. Bituminous or synthetic waterproofing work on flat roofs remains the preserve of waterproofers (CFC 226). During crane lifting, the immediate stability of the structure must be guaranteed by struts and nailed temporary bracing, preventing any tipping or lateral buckling of the structure before final bolting.

Execution path and reading sequence

The methodological progression faithfully follows the stages of a roofing construction site, from the setting-out floor to the final geometric check required by standard SIA 414. Compliance with this sequence guarantees perfect alignment between the timber engineer's drawings and the built reality.

  1. 1. Preparatory setting-out and masonry bearingsBegin by mastering the full-scale setting-out on the floor to verify true angles and lengths, then study the installation of the wall plate on the concrete beam, paying close attention to the capillary break and mechanical dowelling.
  2. 2. Main structure and load distributionExamine the operation of the tie-beam truss to understand the horizontal tie before dimensioning common rafters according to standard centres and permissible spans between purlins.
  3. 3. Global stability and openingsEnsure spatial rigidity with bracing straps or longitudinal tie beams, then design dormer trimmers by properly transferring loads to the reinforced trimming rafters.
  4. 4. Renovation, lifting and handover of worksLearn how to assess attacked historic timber frames before raising the roof, master slinging points during crane lifting and finish with straightness and bearing level tolerances.

For precise pricing of solid timber components and workshop cutting services, consult /soumissions/. Workforce allocation and working conditions questions fall under /jobs/.

📘 Chapters in this section 10

Traditional timber framing: trusses, purlins and rafters

Full-scale layout: setting out timber frames to scale before cutting

Master datum lines and plumb-marking to cut each joint without play on the construction site.

Traditional timber framing: trusses, purlins and rafters

Wall plate: bearing on masonry, anchorage and moisture protection

Ensure the absorption of wind thrust and block rising damp at the concrete ring beam level.

Traditional timber framing: trusses, purlins and rafters

Tie-beam truss: how thrust is resisted and why the tie beam is never cut

Understand tension forces in timber to never cut a tie beam under permanent load.

Traditional timber framing: trusses, purlins and rafters

Rafters: spacing, section and span between purlins

Optimise rafter span and centres according to self-weight and snow load.

Traditional timber framing: trusses, purlins and rafters

Bracing a roof framework: triangulation, wind beams and uplift anchoring

Prevent roof tipping under uplift by effectively triangulating slopes with longitudinal bracing ties.

Traditional timber framing: trusses, purlins and rafters

Dormer and opening in the timber frame: trimmer, load transfer and flashings

Set out robust trimmers and size edge reinforcements to integrate your dormers without structural defects.

Traditional timber framing: trusses, purlins and rafters

Raising a roof: diagnosis of existing timber frame and bearing reinstatement

Secure load transfers onto existing masonry to raise the roof space in full compliance.

Traditional timber framing: trusses, purlins and rafters

Attacked old timber frame: insects, dry rot and diagnosis before quote

Identify common furniture beetles, house longhorn beetles and dry rot to purge timber and prepare a rigorous repair quote.

Traditional timber framing: trusses, purlins and rafters

Lifting a truss with a crane: slinging points, buckling and immediate stabilisation

Balance slings and prop the truss immediately to eliminate any risk of tipping when unhooking.

Traditional timber framing: trusses, purlins and rafters

Carpentry tolerances: top levelling, straightness, and roof plane flatness

Check roof plane flatness and purlin alignment according to standard SIA 414.