Key takeaways
- Single or double birdsmouth joints transmit diagonal compression by engaging the end-heel shear surface.
- The tenon and its mortise ensure geometric positioning without taking up bending moments.
- The tapered hardwood peg draws shoulders into tight contact without bearing permanent tension.
- Standard SIA 265 requires supplementary steel hardware as soon as uplift forces appear.
Mechanical cutting of birdsmouth joints and implementation of draw-pegged tenons
Traditional joints in heavy timber rely on a principle of direct load transmission through wood-on-wood contact. The birdsmouth joint, whether single perpendicular, thrust-skewed, or double, serves to discharge the axial component of an inclined member, such as a principal rafter, directly into a tie beam or sole plate. To comply with the requirements of standard SIA 265 regarding permissible compressive stresses oblique to the timber grain, cutting must ensure strictly flat bearing surfaces that are square with the line of thrust.
| Node type | Primary machining | Mechanical transmission | Safety condition |
|---|---|---|---|
| Single front birdsmouth | Skew abutment at 90° to the diagonal | Compression oblique to the grain | Sufficient heel length against shear failure |
| Rear birdsmouth | Notch perpendicular to the tie beam | Compression parallel to the grain | Notch depth limited to one quarter of the depth |
| Mortise and tenon | Square shoulder and sharp-edged cheek | Shear force and positional restraint | Tenon thickness equal to one third of the member |
| Draw-peg (cheville à tire) | Offset hole drilled in the tenon | Mechanical axial tightening during installation | Tapered section in riven hardwood (locust or oak) |
- Setting out and cutting birdsmouth jointsSet out the notch in the tie beam following the bisector or the right-angle bearing depending on the node geometry. Cut the end waste using a carpenter's handsaw or a notch chain-saw, then dress the bearing surface with a wide framing chisel to eliminate any out-of-squareness.
- Calibrating the tenon and cutting the mortiseCut the tenon with its two shoulders at one third of the timber thickness. Cut the mortise with a chain mortiser or an auger bit, leaving bottom clearance of at least 5 mm to prevent the tenon from bottoming out under load.
- Drilling the offset hole for draw-peggingDrill the mortise to its final diameter. Position the tenon fully seated against its stop, mark the centre, withdraw the male member, and offset the hole towards the shoulder by about 2 to 3 mm. Driving the tapered peg will pull the components into intimate contact.
Structural boundaries according to standard SIA 265 and pathology of traditional joints
Although proven by centuries of practice in Romandie, these joints have severe structural limitations codified by standard SIA 265. A conventional mortise-and-tenon is completely unable to resist a bending moment: the residual thickness of the mortise cheeks will split immediately under cross-grain tension. Similarly, a wooden peg will systematically shear if subjected to continuous axial tension induced by wind uplift or dynamic lateral-torsional buckling.
For transmitting combined forces, the site foreman must identify parasitic stresses during erection on the construction site. The execution of these joints must comply with the work contract and applicable technical specifications. Furthermore, under art. 229 CP, anyone who intentionally or through negligence breaches the recognized rules of construction during the management or execution of a project, thereby endangering the life or limb of persons, faces criminal penalties.
As soon as a structural model reveals transverse tension stresses perpendicular to the grain, roof uplift under suction, or out-of-plane horizontal thrusts, purely timber connections must give way to embedded steel plates, threaded rods with wide bearing washers, or twin-thread screws approved for these force transfers.
Mechanical behaviour of wood-to-wood connections under combined stresses
Mortise-and-tenon and birdsmouth joints function primarily through direct contact of machined surfaces. If a strut or principal rafter transmits a direct axial thrust into the heel of a beam or tie, the cutting geometry guarantees compression resistance. As soon as the force action includes an axial tension component, a secondary bending moment, or a load reversal caused by wind or earthquake, the traditional joint reveals its intrinsic structural limits.
| Joint type | Permissible stress | Force not resisted / Critical failure mode | Supplementary design measure |
|---|---|---|---|
| Single front birdsmouth | Oblique axial compression (rafter onto tie beam) | Axial tension, heel shear failure due to insufficient end length | Increase heel length, supplementary steel tie rod |
| Double birdsmouth | Heavy compression resolved across two abutment planes | Uplift perpendicular to the grain, split between notches | Through-bolting or restraint brackets without excessive pre-tension |
| Straight mortise and tenon | Moderate shear force, member alignment | Direct axial tension, pure bending across reduced cross-section | Hardened draw-pegging or switch to threaded rods with dowels |
| Mitred or spur tenon (tenon barbu) | Corner torsion, edge shear | Tear-out under lateral buckling or severe moisture gradient | External flitch side plates or differential-pitch twin-thread screws |
Dimensioning according to standard SIA 265 requires strict verification of compression stresses oblique to the grain, calculated using Hankinson's formula, as well as longitudinal shear capacity in the heel zone. A recurring mistake on the construction site is to treat the wooden peg as a tension-bearing element. In practice, a tapered locust or ash peg riven along the grain only ensures shoulder tightening and positional stability during erection. Its transverse shear strength cannot guarantee the stability of a joint subjected to permanent tension or repeated pull-out cycles.
Normative limits, rehabilitation, and mixed reinforcement on the construction site
In historic structures across French-speaking Switzerland, such as Vaud farmhouses or Valais barns, the carpenter frequently encounters dislocated birdsmouth joints resulting from tie-beam creep or asymmetrical climatic loads. Art. 229 CP penalises anyone who breaches the recognized rules of construction during building works and thereby endangers the life or limb of persons. Preserving a traditional joint must therefore never compromise the verified transmission of nodal forces.
- Geometric inspection of the timber endMeasure the residual length of sound timber ahead of the birdsmouth throat. If the heel displays a through-thickness drying shake, shear parallel to the grain can no longer be justified by structural calculation.
- Surface dressing and cleaningClear out dust and crushed timber fibres with a mortise chisel. True up the shoulder line to ensure continuous surface contact without gaps exceeding 1 mm across the entire bearing face.
- Drilling the offset peg holeBore the mortise and then the tenon with an eccentric offset of 2 to 3 mm towards the shoulder (draw-pegging). An octagonal peg made of seasoned hardwood must be used to ensure mechanical draw without splitting the cheek.
- Integrating a discreet axial reinforcementIf unanticipated tension appears in the engineer's structural analysis, install inclined fully threaded screws or an internal grouted rod, concealed on the underside, to relieve the traditional timber joint.
The site foreman also ensures collective safety when working on these compromised connections. Relieving loads from historic trusses requires rigid temporary propping, calculated to support the entire self-weight of the roof structure before any cutting-back or peg removal. Art. 17 OTConst requires that measures be taken at workstations and passageways to prevent workers from being endangered by the collapse of building components or falling materials. When the original joint assembly no longer satisfies the ultimate limit state load combinations prescribed by current standards, sistering with through-bolted steel plates or concealed connection boxes remains the only compliant structural solution.
Managing joint non-conformities and securing the construction site
On a timber construction site, uncovering a failing traditional joint requires an immediate targeted work stoppage. Whether dealing with a birdsmouth heel sheared off upon loading, excessive member cutting, or a mortise cheek split by overdriven draw-pegging, timber-to-timber connections give no warning before brittle fracture occurs. Residual shear and cross-grain tension components can no longer be safely transferred under the principles of standard SIA 265.
The primary measure consists of immediately relieving the joint by installing mechanical propping beneath the member in compression or bending. In accordance with art. 17 OTConst, measures must be taken at workstations and passageways to ensure workers are not endangered by the collapse of building components or falling objects and materials. The perimeter below must be cordoned off without delay.
- Member stabilisationPosition a shoring tower or heavy-duty screw jacks directly beneath the joint to bear the full downward load component before undertaking any mechanical work on the member.
- Defect geometric surveyMeasure the residual gap at the root of the birdsmouth, the effective length of the sheared heel, and the run of lengthwise splits using a thickness gauge.
- Formal notice to the structural timber engineerReport findings to the appointed engineering firm to recalculate residual load-bearing capacity and approve an emergency remedial reinforcement scheme.
- Executing the reinforcementInstall twin-thread screws or supplementary steel flitch plates to carry the tension and shear stresses that exceed the capacity of the traditional joint.
When the defect arises from workshop cutting errors that compromise the global stability of the structure, the carpenter incurs professional liability. Art. 229 CP penalises anyone who, while directing or carrying out construction work, intentionally or through negligence breaches the recognized rules of construction and endangers the life or limb of persons. Any technical remediation must systematically be validated by structural calculations.
Frequently asked questions
What should be done if a tenon breaks during draw-pegging?
Never glue the broken timber fragment back or force an oversized peg into the joint. If the tenon is split, its lateral restraint capacity is ruined. The prescribed method consists of drilling through the assembly to insert a concealed steel cross-dowel or placing fully threaded screws to take up alignment forces, subject to sign-off by the structural timber engineer.
How can tension be resisted on a rafter strut fitted with a birdsmouth joint?
A traditional birdsmouth joint works strictly in compression and cannot resist uplift caused by wind forces. To stabilise the structure according to standard SIA 265, the shaped joint must be combined with an external steel bracket, through-bolts, or fully threaded structural screws sized to resist uplift without shearing the edge fibres of the receiving beam.
What clearance tolerance applies to a CNC-cut birdsmouth joint?
Fitting must ensure clean contact across the end abutment face with no gap exceeding 1 mm prior to loading. Beyond that, initial settlement produces parasitic member rotation and subjects the heel to asymmetrical shear. If the cut gapes by more than 1.5 mm, the member must be recut or fitted with an approved rigid timber packing block.
Can a failed timber peg be replaced with a steel bolt?
Directly replacing a timber peg with a threaded steel rod alters the embedment pressure distribution. Because steel is significantly stiffer than traditional oak or locust wood, it risks crushing the end-grain timber locally in the draw-peg hole and initiating an axial split. This modification requires recalculating edge and end distances in compliance with standard SIA 265.
Texts and standards cited
- SIA 265Timber structures - Design and calculation of structures and joints
- OTConst art. 17protection against the collapse of building components or falling objects and materials: at workstations and passageways, measures must be taken so that workers are not endangered.
- CP art. 229breach of the recognized rules of construction: whoever intentionally breaches the recognized rules of construction during the management or execution of a construction or demolition project and thereby knowingly endangers the life or limb of persons is liable to a custodial sentence not exceeding five years or to a monetary penalty; in the case of negligence, to a custodial sentence not exceeding three years or to a monetary penalty.
