Skip to content
Website
🧱 CFC 214Timber connections, ironmongery and fastenersChapter 4 of 10 in the section

Bolting timber: wide washers, tightening, and retightening after drying

This chapter details structural bolting rules according to standard SIA 265. You will learn how to size and position suitable load-spreading washers to avoid crushing fibres, comply with allowable hole clearance on the construction site, and methodically plan the essential retightening required after drying and transverse shrinkage of construction timber.

Key takeaways

  • Transverse timber shrinkage requires anticipating connection clearance and the loss of preload.
  • Standard SIA 265 strictly regulates the minimum dimensions of the load-spreading washer.
  • The allowable hole clearance guarantees load-bearing contact without impairing fitting stiffness.
  • Retightening after moisture stabilisation must be formally included in the maintenance plan.

Load transmission: role of the wide washer and hole drilling tolerance

In a timber-to-timber or timber-to-steel connection subjected to axial tension or shear, the threaded rod works in conjunction with its bearing components. Timber exhibits significantly lower compressive strength perpendicular to the grain than parallel to the grain. As soon as the nut is tensioned, a standard hardware washer immediately punches into the end grain or lateral fibres. To prevent this local deterioration and mobilise the dowel effect without crushing the material, the use of thick, wide load-spreading washers is essential.

Fasteners such as threaded rods or bolts must be fitted with generously sized bearing washers, circular or square in shape, capable of transferring allowable contact pressures without causing detrimental indentation into the timber members.

norme SIA 265
Geometric requirements for structural bolts in timber framing
Shank diameter (d)Allowable hole clearanceWasher diameter or side lengthMinimum steel thickness
M121.0 mm40 to 45 mm4.0 mm
M161.0 mm55 to 60 mm5.0 mm
M201.0 to 1.5 mm65 to 70 mm6.0 mm
M241.5 to 2.0 mm80 to 85 mm8.0 mm

The allowable hole clearance between the bolt shank and the timber member must be controlled to limit initial joint slip. An oversized hole drilled with an auger bit destroys the stiffness of the connection and leads to excessive framework deformations under live loads. Conversely, a hole with zero clearance prevents manual installation without thread mushrooming or splitting dry timber. Concentricity of drilling through layered members requires mechanical guiding or the use of a workshop drill jig.

Moisture shrinkage and technical organisation of retightening

Solid or glued laminated timber installed on a construction site frequently has an equilibrium moisture content higher than the heated indoor service climate. During the first heating season, the element loses several percentage points of relative moisture content. Tangential and radial shrinkage causes a reduction in the total thickness of the assembled timber pack. If a node passes through 240 mm of solid timber with a 2% transverse volume reduction, the thickness loss reaches nearly 5 mm. The bolt remains fixed in length: the washer no longer bears, preload drops to zero, leaving the connection to rattle under dynamic wind loads.

  1. Installation check and moderate initial tighteningTighten the nut using a torque wrench without exceeding the surface fibre crushing limit, ensuring clean contact without initiating fracture.
  2. Installation of spring washers or Belleville washersInsert conical spring washers under the nut for framing nodes that are difficult to access after lining or cladding installation.
  3. Entry in the provisional acceptance reportNotify the client of the inspection deadline in accordance with the Code of Obligations (CO), specifying the required date for the second intervention.
  4. Retightening campaign after building stabilisationIntervene between six and twelve months after commissioning the heating systems to take up mechanical play and lock the locknut.

Contractually under the Code of Obligations (CO), the contractor is liable for the proper execution of the work. While natural shrinkage is a physical phenomenon inherent to timber as a material, the failure to perform retightening when it determines structural stiffness can be claimed as an execution defect. Carpenters must explicitly record this post-stabilisation adjustment operation in the maintenance instructions handed over at the completion of the construction site.

Installation requirements according to standard SIA 265 and hole drilling geometry

The execution of connections using threaded rods or through-bolts requires rigorous drilling precision. In load-bearing timber structures, the transfer of transverse loads through embedment pressure requires clean contact between the metal shank and the bore hole wall, while avoiding internal stresses during assembly.

For bolted connections transferring structural loads, the allowable hole clearance between the nominal diameter of the fastener and the hole in the timber is restricted to avoid excessive joint deformation under load.

norme SIA 265

A larger clearance promotes detrimental initial slip before shear force mobilisation, concentrating stresses on certain shank cross-sections to the detriment of the overall fastener group. In the workshop as on the construction site, drilling must be carried out using rigid jigs or a CNC machining centre to ensure exact perpendicularity of the drill path relative to the wood grain.

Bore diameter adjustment according to shank diameter in Swiss timber framing
Nominal shank diameterDrill hole diameter in timberDrill hole diameter in steel platesCentre-to-centre spacing tolerance
M1212.5 to 13 mm13 to 14 mm± 1 mm
M1616.5 to 17 mm17 to 18 mm± 1 mm
M2021 mm22 mm± 1.5 mm
M2425 mm26 mm± 1.5 mm

Tightening protocols, washer sizing, and post-construction monitoring

The preload applied by a nut does not remain constant over time. Transverse crushing of the wood fibres and progressive water loss caused by indoor heating lead to a thickness reduction of solid timber or glued laminated elements. The use of an adequately sized load-spreading washer provides the first line of defence against excessive indentation of metal into the timber.

Heavy-gauge load-spreading washer
Metallic bearing component of circular or square cross-section, complying with timber construction standards, possessing sufficient contact area and thickness to prevent washer dishing and limit compressive stress perpendicular to the grain beneath the bolt head.
  1. Timber moisture check upon installationMeasure timber moisture content using an insulated pin-type moisture meter prior to assembly. Record the value on the installation report to estimate the expected moisture shrinkage based on the future building climate.
  2. Installation of the load-spreading washerSystematically place a washer dimensioned to the engineer's design under both the head and the nut. Ensure that the washer thickness withstands the tightening torque without warping.
  3. Initial snug-tighteningCarry out tightening using a torque wrench or calibrated tool until complete surface contact is achieved, without crushing the surface wood parenchyma.
  4. Scheduling the retightening visitFormally record in the as-built documentation submitted to site management the obligation for a retightening campaign after the first heating season, specifically 6 to 12 months after commissioning.

The contractual handling of this operation must be anticipated. In accordance with art. 365 CO, if the material supplied by the client or the site designated by him is found to be defective, or if any other circumstance arises which jeopardises the regular or punctual execution of the work, the contractor shall immediately inform the client. This technical advisory approach applies directly to moisture shrinkage management: informing the principal in writing of the consequences of in-situ drying protects the timber contractor from claims concerning loose joints during acceptance of the work.

Handling joint non-conformities and securing residual torque

On a timber construction site, a defective bolted connection most commonly results from excessive fibre crushing under an undersized washer, an exceeded allowable hole clearance, or play caused by transverse moisture shrinkage of solid timber members. As soon as a site foreman or site manager observes a completely loose threaded rod or uncontrolled sinking of the load-spreading washer into the timber, joint integrity must be assessed without waiting for interior linings to be closed up.

  1. 1. Identification of instability and shrinkage measurementMeasure residual timber moisture content using an insulated pin meter. Check the gap under the head or nut with a feeler gauge, as well as the depth of washer indentation into the fibres.
  2. 2. Removal and inspection of drill holesDismantle the rod or bolt after propping the load-bearing element if necessary. Measure the actual borehole diameter: a hole clearance exceeding the maximum tolerance permitted by standard SIA 265 requires a sizing bushing or node rebuilding.
  3. 3. Replacement of load-spreading componentsImperatively replace deformed off-the-shelf standard washers with heavy-gauge timber construction washers in square or circular format in accordance with standard SIA 265, to restore an adequate bearing area.
  4. 4. Retightening protocol and documentationApply the required torque using a torque wrench until firm contact is achieved without crushing the timber. Record the intervention date and log the follow-up inspection deadline in the site logbook.

The contractor is liable for the good quality of the material he supplies according to art. 365 CO. If the timber exhibits an installation moisture content incompatible with the intended use in a heated environment, the client must be notified in writing to contractually schedule retightening after drying.

Frequently asked questions

How should one react if the hole clearance exceeds the limit value in standard SIA 265?

If the bore diameter exceeds the clearance permitted by standard SIA 265 relative to the bolt, joint slip becomes excessive under service load. The node must be relieved of load using temporary jacking. Depending on the timber engineer's assessment, the solution consists of installing a calibrated machined metal bushing, reaming to fit a bolt of the next larger diameter, or replacing the weakened timber member.

Can standard mudguard washers be used instead of timber construction washers?

No, this is strictly prohibited in load-bearing structures. Standard mudguard washers are too thin and bend under load, concentrating the entire force onto the edge of the hole. Standard SIA 265 requires a thick, wide load-spreading washer capable of distributing the load without punching into the timber perpendicular to the grain. Using non-certified components exposes the structure to localised crushing failure and rapid loosening.

At what exact point must retightening after drying be carried out on the construction site?

Retightening is performed as soon as the timber reaches its equilibrium moisture content inside the building, generally after the first complete winter heating period. The site manager must schedule this intervention before lining installation or demand technical inspection hatches adjacent to critical frame nodes. Without this operation, transverse shrinkage creates noticeable play that cancels friction grip and subjects bolts to abnormal bending stresses.

What should be done when a nut spins freely during retightening on dry timber?

This incident indicates a stripped thread or galling that has sheared the threads of the galvanised rod or nut. The component must be mechanically held and the damaged element cut away without notching the surrounding timber or overheating adjacent metal fittings. Replace the entire assembly with a rod of suitable grade, a new nut lubricated with tallow or dry lubricant, and two heavy-gauge load-spreading washers complying with the engineer's drawings.

Texts and standards cited

  • norme SIA 265Timber structures: design rules, connection dimensioning, hole clearances, and load-spreading washer dimensions
  • CO art. 365Material and site: the contractor is liable for the good quality of the material supplied and informs the client of any circumstance jeopardising the work

In the same section