Key takeaways
- Machining on CNC equipment requires a strict pocket tolerance of one millimetre.
- Workshop trial assembly guarantees perfect positioning without forcing on the construction site.
- Full engagement of the metal profile and installation of locking screws are imperative.
- A timestamped photographic log prior to closing up protects the enterprise against subsequent claims.
Cut in the workshop and validate interlocking geometry
Concealed connectors with aluminium or steel webs demand absolute execution accuracy right from the timber conversion stage. Any dimensional defect transferred to the construction site causes jamming during lifting or eccentric load transfer non-compliant with the timber engineer's structural calculations. In computer-aided joinery cutting, the pocket housing the plate must respect a minimum functional clearance to allow sliding without impairing the required friction or weakening the residual cross-section of the glulam or solid timber.
| Cutting operation | Tool / Method | Permissible tolerance | Consequence of a deviation |
|---|---|---|---|
| Slot for metal web | CNC helical router bit | +1 mm / 0 mm in width | Splitting during nailing or excessive play |
| Groove depth | CNC end milling | +2 mm / 0 mm | Incomplete bearing on the plate |
| Drilling for dowels | Bushing-guided steel bit | ±0.5 mm on centre-to-centre spacing | Refusal of dowel engagement |
| Squaring of the joist end | Under-table circular saw | ±0.5 mm out-of-squareness | Visible gaping at the butt joint |
Workshop trial assembly constitutes a decisive milestone in the quality chain. For each batch of repetitive parts or for complex double-pitched structural nodes, dry-fit the connection using calibrated temporary pins. This step confirms the proper alignment of workshop pre-drilled holes with the drill holes in the metal plate, thereby eliminating any risk of forced manual drilling while working at height under the crane.
- Dovetail connector
- Concealed connection system composed of two aluminium profiles interlocking along a conical slope, ensuring the transfer of vertical and horizontal forces without visible fasteners.
Monitor site lowering, lock and record proof
On the construction site, the insertion phase demands continuous monitoring of the secondary element's lowering onto the primary member. When contact at the bottom of the rebate occurs, the joist must reach its precise level without height discrepancy between the top faces of the members. A suspended connector without full bearing generates a concentration of shear stresses at the bottom screws, compromising structural safety.
- Guiding and dockingLower the component by crane while maintaining perfect plumb using a spirit level to prevent any binding of the connectors.
- Flushness inspectionVerify continuous flush alignment between supporting and supported members using a steel rule or by touch, confirming full seating into the housing.
- Mechanical lockingInsert the through safety dowel pin or tighten the inclined upper locking screw in accordance with the assembly drawings.
- Photographic recordTake a sharp close-up photograph showing the locking component engaged and the absence of gaps before any installation of flooring or linings.
Pursuant to art. 364 CO, the contractor performs the work under its own responsibility and provides the necessary means and tools at its own expense. To meet the requirements of recognised technical standards under SIA 118, the team records each node on a self-inspection sheet appended to the site logbook. The timestamped photographic record must include the component mark according to the timber framing layout plan.
Machining tolerances and interlocking kinematics of concealed connectors
In concealed timber-to-timber or timber-to-metal connections using dovetail connectors or machined aluminium webs, mechanical behaviour depends entirely on the precision of cutting on the machining centre. Unlike exposed joist hangers or visible angle brackets, a concealed connector tolerates no geometric pocket defect. An excessively narrow rebate prevents the lowering of the supported member, while overly wide machining compromises force transfer, fire resistance and the tight closing of the visible joint.
| Cut component | Critical parameter | Required tolerance | Direct consequence on the construction site |
|---|---|---|---|
| Secondary beam rebate | Milling depth | ± 0.5 mm | Gaping of the contact joint or parasitic shear |
| Connector housing on primary member | Flatness of the milling bottom | ± 0.3 mm | Tilting of the connector and jamming upon engagement |
| Drilling of through dowels | Centre-to-centre distance and squareness | ± 0.2 mm | Refusal of dowel entry or splitting along the grain |
| Clear span length | End square cut | + 0 / - 1.0 mm | Axial overload on the connector or excessive bearing play |
Machining on CNC equipment requires rigorous calibration of tool radius compensation. In the internal corners of a recess for a concealed connector, the residual tool radius must be cleared by surface milling or specific corner broaching to allow the metal plate to enter without interference. The moisture content of the timber at the time of cutting directly influences these dimensions: machining glulam at 14% moisture content for installation in a heated environment requires anticipating radial and tangential shrinkage, otherwise the pocket will pinch the connector during assembly.
Mechanical locking, visual validation and compilation of technical proof
Once the component is brought to its final level using the crane, confirming full interlocking constitutes an immediate structural safety operation. On a concealed system, the female connector must rest without play on the bottom stop of the male connector. Carpenters verify this flush abutment by checking the seamless continuity of top edges between joist and primary beam, supplemented by a feeler gauge check at the vertical contact joint.
- Stroke and flushness checkVerify the top alignment of primary and secondary elements with a straightedge, then check the absence of residual voids at the bottom of the groove using a thin calibrated shim.
- Insertion of locking elementsImmediately install the cylindrical dowel pins or engage the conical stop screws specified by the structural calculation to prevent any uplift under wind loads or vibrations.
- High-resolution photographic recordingPhotograph the engaged locking element, the dowel pin in place and the component mark label prior to any closing up with decking, CLT panels or an insulation assembly.
- Entry into the erection logbookRecord the installation time, operative's identification and locking compliance in the enterprise's self-inspection sheet before signing off the stage.
Locking pins or screws are not mere secondary safeties: they resist uplift components and prevent disengagement of the framing node. In inverted dovetail connectors, the absence of the top locking screw exposes the element to kinematic unhooking under the effect of thermal or moisture-induced structural deformations. This risk increases when elements are erected with a slight out-of-level tilt that tends to push the joist out of its housing.
Management of assembly non-conformities and remediation protocols
On the construction site, a concealed connector that refuses full interlocking or whose reference mark is not flush prohibits any further erection work. Forcing the descent using a crane or cable puller masks local timber crushing, deforms aluminium or steel plates and impairs shear resistance. When the mechanical stop is not reached, the component must be slung again, lifted and set down on safety trestles to analyse the defect.
| Site finding | Technical root cause | Required corrective action |
|---|---|---|
| Residual top gap greater than 1 mm | Woodchips at the bottom of the notch or adhesive excess | Removal, cleaning of the pocket housing and check with a marking gauge |
| Non-coaxial dowel holes | CNC pitch error or dimensional shrinkage | Remachining of the secondary member after approval from the engineer |
| Locking screw spinning freely | Excessive tightening torque or started in a fissure | Installation of an oversized repair screw in accordance with technical approvals |
If the defect stems from a dimensional discrepancy of the supporting member supplied by a third party or an unforeseen structural modification, the carpenter exercises the duty to notify pursuant to art. 365 CO. Art. 365 CO provides that if the material supplied by the employer or the ground designated by him is found to be defective, or if any other circumstance compromises the proper or timely execution of the work, the contractor shall immediately inform the employer.
Every remediation is subjected to direct visual inspection supplemented by a macro photograph showing flush seating and the actual placement of stop screws. Art. 17 OTConst provides that measures must be taken at workstations and passageways so that workers are not endangered by the collapse of building elements or the falling of objects and materials. The quality assurance file records the photograph and the inspection sheet prior to any definitive concealment by fire-rated linings.
Frequently asked questions
How can you certify that a dovetail connector is fully seated if the joint is completely concealed?
Verification relies on the reference witness line marked in the workshop on the top or bottom face of the secondary beam. As it is lowered under the crane, this millimetric mark must align exactly with the edge of the supporting beam. A tactile check or the insertion of a 0.5 mm feeler gauge into the joint confirms the absence of residual gaps before driving the locking screws and taking the photograph.
What should be done when a self-drilling dowel deflects and refuses to pass through the concealed connector?
Hammering the dowel or increasing pressure on the driver is out of the question, as it risks snapping the steel. The component must be relieved by the lifting equipment. Extract the metal fastener, probe the hole to detect any hard knot or machining offset, then correct the drilling axis or use the manufacturer's drilling jig to ensure proper entry into the aluminium web.
What protocol applies to the photographic proof before installing acoustic linings?
The carpenter takes a sharp medium-shot photograph identifying the beam and its installation mark, followed by a close-up showing the head of each locking screw or dowel pin fully driven home. The operative places a folding rule across the connection to demonstrate perfect flushness. This digital document is immediately indexed with the node number from the engineering drawings in the enterprise's site logbook.
Why does a concealed connector sometimes produce a creaking noise once the floor is loaded?
This mechanical noise generally stems from excessive lateral play in the housing groove or the omission of an inclined clamping screw. The member slips under live load instead of transferring the force rigidly. Remediation requires inserting the conical clamping fasteners specified in the technical instructions under relieved load, firmly drawing the end grain against the bearing member.
Texts and standards cited
- CO art. 365material and ground: the contractor is liable for the good quality of the material he supplies; if the material supplied by the employer or the ground designated by him is found to be defective, or if any other circumstance compromises the proper or timely execution of the work, he shall immediately inform the employer, on pain of bearing the consequences (para. 3).
- OTConstprotection against the collapse of building elements or the falling of objects and materials: at workstations and passageways, measures must be taken so that workers are not endangered.