Skip to content
Website
🧱 CFC 214Timber as a load-bearing material: species, grades and moistureChapter 7 of 10 in the section

Preservative treatment: when it is needed and when design suffices

This chapter provides the operational criteria to decide between constructive protection and chemical treatment in Swiss carpentry. You will learn to identify the actual use class of a load-bearing member, design water-shedding and ventilation details to keep the timber dry, and prescribe the correct treatment only when geometry cannot suffice.

Key takeaways

  • Timber kept below 20% moisture content is subject to no biological attack by wood-destroying fungi.
  • Constructive protection always takes precedence over applying curative or preventive chemicals in timber framing.
  • The use class stems strictly from actual weather exposure and assembly aeration.
  • Pressure-treated autoclave processing remains reserved for situations of direct contact with ground or water.

Constructive protection to keep load-bearing timber below the critical moisture threshold

In Swiss timber framing, the biological durability of a load-bearing member depends above all on its moisture content. Wood-destroying fungi require a prolonged moisture content above 20% by mass to develop. The carpenter's fundamental rule is therefore to design details that ensure rapid drainage and continuous ventilation for each primary member, thereby avoiding routine reliance on mineral salts or biocides.

To preserve solid timber or glulam, three principles of water shedding and ventilation are essential right from the setting-out drawing and on the construction site:

  • Post base standoff: capillary break by inserting a steel shoe holding the wood clear of the concrete.
  • Drainage falls on horizontal surfaces: chamfers or bevelled cuts to shed runoff water without standing pools.
  • Continuous ventilation air cavities: clear cross-section preventing trapped moisture in joints and girder bearing zones.
Design protection measures by structural zone
Structural zonePrimary riskConstructive measures without treatment
External post basesSplashing and capillary riseElevated steel shoe, slotted or dowelled base, ventilated ground clearance
External beam endsWater penetration through end grainBevelled cut, flashing, drainage gap beneath the end
Half-lap and notched jointsInterlocking water trapped by capillarityDeliberate assembly clearance, drainage chamfer, through-ventilation

Under art. 365 CO, the contractor is liable for the sound quality of the material provided. The carpenter must immediately notify the client of any drawing detail that would enclose a beam end without ventilation or create inevitable water retention.

Use classes and reasoned selection between surface or autoclave treatment

When the structure inevitably exposes load-bearing timber to the elements without possible total shelter, choosing a naturally durable species or adding a preservative treatment becomes necessary. This sizing is based on the rigorous definition of the use class, which measures the foreseeable frequency and duration of wetting for structural members.

Use class
Index characterising the exposure of a timber member to biological agents according to its service moisture, ranging from dry interior without wetting to continuous immersion.
Use classes and treatment requirements in load-bearing timber framing
ClassSituation of load-bearing timberPreservative treatment requirement
Class 1Heated interior, fully sheltered and dry (trusses, enclosed rafters)No fungicidal treatment required; insect protection depending on species
Class 2Sheltered from weather but risk of temporary dampness (cold roofs, closed sheds)Generally not required if ventilation is ensured; surface treatment if sapwood is exposed
Class 3External without ground contact, exposed to rain (overhanging purlins, balconies)Durable species without sapwood required, or protective impregnation with draining details
Class 4Direct contact with ground or fresh water (embedded posts, stilts)Full-cell pressure autoclave treatment indispensable, or species of very high natural durability

Surface application by brushing, spraying or short dipping only deposits a millimetric film on the wood periphery. This process is only suitable for moderate use classes. As soon as the timber undergoes external hygrometric shocks, shrinkage checks quickly appear, opening direct access for fungal spores into the untreated heartwood.

Vacuum-pressure autoclave remains the only method capable of deeply saturating softwood sapwood for Class 4 applications. However, in contemporary Swiss structural design, good practice favours changing the constructive concept: using adjustable brackets separating the wood from the ground allows the member to be brought back down to Class 3, making heavy autoclave impregnation superfluous.

Constructive measures: ventilation, drainage and ground clearance

In French-speaking Swiss carpentry practice, the durability of a load-bearing member depends primarily on its ability to shed accidental water and dry out unhindered. A chemical treatment, whether autoclave impregnation or surface spraying of insecticide-fungicide, never compensates for a flawed constructive detail that retains pockets of water. Protection by design dictates systematically cutting off capillary rise, moving structural timber away from splash zones, and ensuring continuous airflow over every surface exposed to climatic variations.

For external post bases or bottom wall plates, the interface with masonry represents the most vulnerable point. Inserting a bituminous or synthetic damp-proof membrane beneath the sole plate is essential to block rising damp from the concrete. Additionally, anchor brackets must leave a clear gap beneath the end grain, which is the primary path for capillary absorption. Where framing runs down to the outside, the water-shedding flashing must direct runoff beyond the masonry plinth without risk of capillary return.

Constructive protection measures by load-bearing member configuration
Structure configurationMain exposureMandatory constructive detailReliance on biocide treatment
Post base beneath open canopySplashing and ground surface runoffSteel bracket providing at least 150 to 300 mm clearance above finished ground and bevelled cut on end grainGenerally superfluous if suitable indigenous species is used (e.g. larch, Douglas fir free of sapwood)
Bottom plate on slab or basementConcrete capillarity and construction-phase waterContinuous damp-proof course under sole plate, outer overhang and perimeter drainage of the plinthNot required if installed dry with a continuous capillary break
Sheltered external floor joistsStagnant damp air and condensationVentilated air gap of at least 20 mm, rot-proof packing shims and open jointsSurface treatment recommended only if sapwood is retained
Purlin bearing penetrating the envelopeThermal bridge and internal condensationAirtight sleeve around the perimeter, continuous thermal insulation and thermal breakUnnecessary if airtightness is fully controlled at the junction

Water shedding on exposed structures is also achieved through workshop-machined drip grooves or bevels. A bevel of at least 15 degrees on the underside of cantilevered beam ends or wall plates breaks water droplets and prevents the liquid film from travelling along the member through surface tension. Similarly, natural shrinkage cracks must be oriented downwards when erecting solid timber on the construction site to prevent them from acting as traps for rainwater pooling in the core of the cross-section.

Technical decision-making: when biocide treatment is essential on site

Biocide treatment must not be applied by default or as blind insurance against poor workmanship. In accordance with recognised timber construction principles in Switzerland, chemical preservation is reserved for cases where constructive protection alone cannot guarantee material moisture below the critical threshold for micro-organism growth. This decision takes place as early as drafting the tender specifications and inspecting incoming raw material deliveries.

Resorting to deep autoclave treatment using metal salts is primarily necessary for load-bearing timber in prolonged or permanent contact with ground or fresh water, or for unsheltered external structures without rapid drying capability. Conversely, for ventilated indoor timber framing or framing elements insulated behind a breather membrane and drained cladding, passive design is entirely sufficient. The use of indigenous softwoods free of sapwood, such as larch heartwood or Douglas fir, often achieves superior natural durability without adding synthetic substances.

Contractually, the contractor remains liable for the choice of materials installed. Under art. 365 CO, the contractor is liable for the sound quality of the material provided. If the specifications impose a timber species unsuitable for the exposure class without providing for appropriate protective treatment, the carpenter must immediately report this defect to the site management.

  • Rigorous moisture checks on timber upon delivery (aiming for equilibrium moisture content suited to the room or erection site).
  • Temporary weatherproofing of floors and wall plates during erection to prevent water from becoming trapped inside closed cassettes.
  • Prohibition of exposed horizontal half-lap joints in favour of suspended joints with a ventilated steel flitch plate.
  • Strict limitation of surface chemical treatments to proven risks of wood-boring insects in unheated and unventilated areas.

Managing moisture defects and technical remedies on the construction site

On a timber-frame or carpentry construction site, the emergence of standing water, trapped construction-phase moisture, or the discovery of a poorly ventilated detail requires an immediate response from site management and the foreman. The design must ensure dry wood through to the core; when this physical rule is breached during execution, the structural durability of the building is directly jeopardised by the potential development of wood-destroying fungi.

  1. Assessment and mapping of moisture levelsMeasure the moisture content using an insulated pin-type moisture meter deep inside load-bearing sections, particularly on sole plates, post bases and joints exposed to the weather.
  2. Emergency drying and clearing drainage pathsEvacuate standing water by wet vacuuming or drilling temporary drainage holes, remove impermeable tarpaulins creating a greenhouse effect, and install commercial dehumidifiers if the structure is weathertight.
  3. Formal notification of defectUnder art. 365 CO, the contractor notifies the client of circumstances that compromise the proper execution of the works, particularly if a detail required by the plans prevents ventilation or promotes water retention.
  4. Constructive correction or retreatmentModify bearings to recreate a ventilated air gap of at least 20 mm, insert rot-proof packers to break capillarity, or apply an approved curative and preventive fungicidal biocide to fresh cuts.

When the architectural detail imposes direct contact with soil or prolonged water retention without the possibility of shedding water via a drip edge, the foreman must reject the installation of untreated native timber. Replacing it with vacuum-pressure autoclave treated timber or modifying the base geometry are the only acceptable options to ensure compliance with recognised timber construction standards.

Frequently asked questions

Must spruce framing soaked by a storm before the roof is sealed receive chemical treatment?

No, curative chemical treatment is not necessary if the timber was initially sound. Rainwater runs off surfaces without immediately saturating the core of large sections. The building must be ventilated thoroughly, waterproof coverings causing condensation must be removed, and the drop in moisture content below 20% must be checked with a moisture meter before permanently installing insulation and internal linings.

Can autoclave-treated timber be cut down on the construction site without special precautions?

No. Autoclave impregnation penetrates the sapwood but hardly enters the heartwood of softwoods such as spruce or larch. Any cut, notch or hole exposes untreated heartwood to biological attack. A brush coat of curative and preventive preservative must imperatively be applied immediately to machined surfaces prior to final assembly in the structure.

How should one respond if an external post base is installed without compliant ground clearance?

If the post base is placed directly on the slab without a steel stand-off of at least 150 mm, the wood will absorb water via capillarity. The foreman must raise the member using temporary jacks, trim the deteriorated end grain if necessary, treat the bearing face and insert an adjustable steel shoe that ensures a capillary break and complete drainage.

What constructive detail should be used for purlin heads exposed to the weather at a gable?

Spray treatment does not durably protect purlin end grain exposed to leaching and water seepage along the fibres. A drainage bevel of at least 15 degrees should be cut at the end, an effective drip edge formed, or a ventilated zinc or aluminium metal capping fitted, preventing any direct water contact with the wood.

Texts and standards cited

  • CO art. 365material and site: the contractor is liable for the sound quality of the material provided; if the material supplied by the client or the site designated by the client is recognised as defective, or if any other circumstance compromises the regular or timely execution of the work, the contractor shall immediately inform the client, failing which the contractor bears the consequences (para. 3).

In the same section