Key takeaways
- Timber strength decreases sharply during crushing perpendicular to the slab grain.
- A continuous through bearing inserts horizontal layers that are highly susceptible to settlement under heavy loads.
- The accumulation of vertical deformations across six storeys disrupts technical building services and façades.
- Direct transmission of wall loads via steel fittings radically limits the crushing of floor panels.
Behaviour of cross-laminated timber under compression perpendicular to the grain at bearings
On a multi-storey building construction site using cross-laminated timber (CLT) panels, the floor-to-wall junction constitutes the most mechanically stressed area. The floor slab generally rests on top of the lower wall panel to in turn receive the base of the upper wall panel. This configuration subjects the horizontal panel to compression perpendicular to the grain across the entire width of the wall. However, the mechanical strength of softwood in compression perpendicular to the grain is significantly lower than its axial capacity, creating an immediate risk of crushing under permanent and variable loads.
Ultimate limit state and serviceability limit state verifications for compression perpendicular to the grain must take into account the bearing configuration, the dispersion of forces, and the risk of local plastic deformation of the timber.
norme SIA 265
A CLT panel consists of alternating longitudinal and crosswise layers. When a slab runs continuously right through the bearing node, the vertical loads from the upper wall pass successively through layers oriented at ninety degrees to the compressive force. These flat-laid layers undergo plastic crushing under moderate stresses, locally reducing panel thickness. As the number of stacked storeys increases, the load transmitted to the base increases, reaching critical values from the third floor upwards.
| Framing element | Grain orientation | Sensitivity to settlement | Primary structural role |
|---|---|---|---|
| Load-bearing CLT wall | Predominantly vertical | Very low | Axial load takedown |
| Continuous CLT slab | Alternating horizontal | Very high | Bending resistance and diaphragm action |
| Timber intermediate sole plate | Horizontal | High | Distribution and installation alignment |
| Through steel shoe | Vertical steel axis | Zero | Direct wall-to-wall transfer |
Management of cumulative settlement and execution details across six storeys
In a timber superstructure reaching six storeys, cumulative vertical settlement becomes a governing design factor for all finishing work. Each continuous slab-wall interface can undergo a deformation under sustained load of one to three millimetres, in addition to residual timber shrinkage. Without suitable construction details, a six-storey building can register a total vertical shortening exceeding fifteen millimetres between the roof and the reinforced concrete raft foundation.
This differential movement causes major defects: shearing of rigid service pipes in vertical ducts, jamming of doors, cracking of plasterboard linings, and misalignment of hung façade elements. The erection crew must strictly comply with the bearing details validated by the production drawings to prevent mechanical crushing of the horizontal panels.
- Inspection of the lower wall bearing surfaceCheck the level and flatness of the top of the CLT wall using a straightedge and an optical level before presenting the slab, in order to avoid stress concentrations on hard spots.
- Installation of the decoupling layerLay the specified sealing tape or elastomer on the bearing surface to calibrate the contact area without prematurely crushing the edge timber.
- Installation of the slab with contact block-outsPosition the floor panel by interrupting the slab or providing notches if the loads require direct end-grain contact between lower and upper walls.
- Insertion of axial load-relief connectorsFasten inclined fully threaded screws or insert the specified through steel sleeves to transfer the load of the upper wall directly onto the lower wall without compressing the slab.
Bearing area optimisation and direct load transfer
On multi-storey cross-laminated timber structures, the continuous bearing of a slab clamped directly between two vertical walls creates particularly critical stresses in compression perpendicular to the grain. According to SIA 265, the strength of softwood under compression perpendicular to the grain remains modest. When the cumulative vertical loads from the upper storeys reach substantial values, the gross contact surface of the wall edge is no longer sufficient to restrain local plastic deformations.
To relieve the crosswise layers of CLT slabs, site execution now favours systems providing direct axial load transfer from storey to storey. Interrupting the slab at internal load-bearing walls, complemented by end-grain fittings or recessed steel brackets, allows the upper vertical panel to bear directly on the lower panel via rigid connectors or end grain. Where the slab must run continuously through the bearing for mechanical continuity or erection safety reasons, twin-thread screws or fully threaded screws installed at 90° or inclined locally reinforce punching resistance and stiffen the compressed zone.
| Assembly configuration | Grain orientation under load | Risk of localised crushing | Site execution |
|---|---|---|---|
| Clamped continuous through slab | Outer and crosswise layers compressed at 90° | Very high under heavy load takedown | Rapid flat slab placement, followed by setting out of upper wall |
| Interrupted slab on continuous wall | Longitudinal wall layers in axial compression | Virtually zero (end grain) | Requires shoes, integrated steel fittings, or bearing rebates |
| Continuous slab with crosswise reinforcing screws | Loads distributed between timber and steel via bond | Low to moderate depending on screw density | Systematic screw installation using a template prior to upper wall placement |
| Bearing on dense hardwood sole plate | Compression perpendicular to the grain on hardwood | Moderate (higher transverse modulus) | Rigorous levelling and fixing via tie-down anchors |
Cumulative settlement monitoring and execution tolerances across six storeys
In a six-storey CLT superstructure, crosswise crushing of the timber cannot be analysed in isolation on each storey. Every slab-wall interface incorporates adhesive layers, resilient interposition strips, potential sawing tolerances, and elastoplastic crushing of the timber stressed perpendicular to the grain. Without a rigorous design specified by the timber engineer in accordance with SIA 265, the cumulative total of these deformations at the ridge of the building can reach several centimetres.
Such vertical shortening uncouples the load-bearing timber components from the rigid parts of the building: reinforced concrete stair cores or service risers, fixed soil stacks, and suspended curtain walling. Rigid drainage pipes without expansion couplings eventually shear or break their fixings under the effect of differential settlement. The carpenter therefore applies strict execution protocols during erection to manage levelling from floor to floor.
- Systematic elevation checksMeasure the exact level of the top edge of the CLT walls with an optical or laser level after each floor is erected, in order to compensate for actual geometrical deviations before installing the next slab.
- Installation of calibrated bearing stripsFit resilient strips or elastomeric bearings whose thickness under service load has been strictly defined by the structural calculations, avoiding unjustified packing build-ups.
- Maintenance of openings and sliding jointsCheck that the fixings of third-party rigid elements against CLT components can slide freely to absorb the predictable lowering of the timber frame.
- Coordination of the wind and watertight envelopeInform site management of the settlement expected during the operational phase in accordance with the contractor's general duty to give notice, so that clearance joints beneath lintels and concrete slabs can be adjusted.
Corrective measures in the event of excessive crushing or level discrepancies
On a six-storey cross-laminated timber construction site, unexpected settlement often becomes apparent at the third or fourth floor through difficulties in aligning upper walls, binding joinery, or visible crushing of outer slab layers. As soon as an elevation discrepancy exceeds the tolerances permitted by SIA 265 for compression perpendicular to the grain, the foreman must record topographic measurements and halt erection of the affected bay.
- Level survey and notificationMeasure the top level of each floor panel under load using an optical level. The contractor applies art. 365 CO by giving notice to the client as soon as a circumstance compromises the regular or timely execution of the works.
- Temporary relief and shoringErect heavy propping towers along slab edges to support the vertical load. Hydraulic jacks allow the compressed bearing level to be relieved without damaging the glued timber layers.
- Insertion of distribution plates or reinforcing screwsUpon instruction from the civil engineer, insert ground steel plates or install rows of twin-thread screws through the slab. These screws transfer axial force directly from the upper wall to the lower wall.
Managing interfaces with finishing work requires rigorous coordination. Vertical service ducts and ventilated façade tracks must incorporate sliding joints of at least 25 mm to absorb cumulative settlement without inducing parasitic loading on technical installations.
Frequently asked questions
How can critical crushing be identified during erection?
The head of crew monitors the bearing level under the sole plate or upper panel. Visible deformation through lateral bulging of the CLT slab cross-layer grain, localised delamination of the boards, or residual play beneath anchor brackets indicate that the allowable strength defined by SIA 265 has been exceeded. A laser level survey confirms millimetric sinking of the load-bearing component.
Can tapered shims be used to correct the seat of a CLT slab?
No. Tapered or isolated shims concentrate vertical stresses onto a reduced surface area, which destroys the wood grain through localised shear. Only continuous machined steel plates, covering the full bearing width of the lower wall according to the engineer's drawings, guarantee uniform load distribution and prevent premature edge crushing.
When should crosswise reinforcing screws be installed?
Fully threaded reinforcing screws for crosswise compression must be installed before erecting the upper-storey wall. Working from on top of the slab ensures perfectly square alignment according to the grid defined by the engineer. Retrofitting requires complex angled drilling and heavy propping that is difficult to reconcile with erection rates.
How should one react if technical duct stacks become jammed beneath the slab?
This situation signals an underestimated cumulative settlement of intermediate floors. Fixed clamps should be loosened to prevent buckling of vertical polyethylene or cast iron pipes, openings relieved by chamfering if necessary, and then telescopic expansion sleeves installed. The incident must be recorded in an official stoppage notice submitted to site management.
Texts and standards cited
- CO art. 365materials and site conditions: the contractor immediately informs the client if any circumstance jeopardises the proper execution of the works
- SIA 265Timber construction - structural design and crosswise compressive stresses
