Key takeaways
- The transmission of shear and tensile forces requires continuous steel fittings from storey to storey.
- Standard SIA 265 governs permissible deflections and mechanical behaviour perpendicular to the grain.
- The stacking of bottom plates, joists and top plates generates an incompressible cumulative shrinkage in height.
- Base shimming and the use of stabilised timber prevent subsequent binding of metal fixings.
Bracing continuity across the floor diaphragm
In a platform timber frame structure, the transition from one storey to the next naturally interrupts the vertical mechanical continuity of the load-bearing studs. Wind and seismic forces gathered at roof level or on upper storeys travel along the shear wall panels to reach the level below. At the horizontal diaphragm, these loads split into two inseparable components: horizontal sliding shear and the tensile force due to the overall overturning moment of the wall.
- Platform connection
- Construction system where the storey floor rests directly on the top plate of the wall below, serving as a base for the bottom plate of the wall above, which creates a discontinuity between the vertical studs.
To take up the shear force, the bracing panel must transfer its shear load to the bottom plate by close structural nailing or stapling. This bottom plate transmits the force to the floor decking or directly to the rim board, which must be tied down to the top plate of the wall below. The tensile force located at wall ends, for its part, requires a continuous metallic solution: hold-down anchors must never terminate in a rim board without a direct link to the stud located below. Direct stud-to-stud transmission via through threaded rods or nailed flat straps with certified connectors guarantees a rigid load path.
| Force component | Primary load-bearing connector | Construction site watchpoint |
|---|---|---|
| Horizontal shear | Coach screws, structural screws or densified edge nailing | Position fasteners at the strict centres specified on the engineer's drawing |
| Overturning tension | Metal hold-downs and continuous through tie rods | Torque-tighten after equilibrium drying without crushing the timber |
| Vertical compression | Direct wood-on-wood bearing, doubled end studs | Align the centreline of upper studs with load-bearing studs below |
Cumulative settlement of flat-laid timbers and compensation during erection
Deflections perpendicular to the grain under permanent load must be assessed by summing moisture shrinkage and compression creep of transverse members.
norme SIA 265
A standard frame assembly stacks one top plate, one joist or floor rim, and an upper storey bottom plate per level. These elements receive the vertical load runs on their tangential or radial face. Under the principles of standard SIA 265, the modulus of elasticity and transverse crushing strength of softwood are low compared to axial values along the grain. On a building of two to three storeys above ground floor, mechanical crushing under permanent loads combined with drying shrinkage can reach several centimetres over the total facade height.
- Timber moisture content measurement upon deliveryCheck that the moisture content of plates and rim boards in solid or glulam timber does not exceed the specified value before erecting each frame element.
- Insertion of incompressible shimsPlace calibrated rigid shims under heavily loaded studs or replace transverse floor rim boards with end-grain timber blocks or rigid multiply panels.
- Adjustment to laser datum levelCompensate for predictable theoretical settlement during assembly by raising the storey bottom plate by a fraction of a millimetre calculated by the site management.
- Deferred installation of rigid envelope connectionsLeave the required sliding play on storey metal fixings to prevent panel cantilevering during loading.
Assembly compensation is primarily achieved by limiting the total thickness of members loaded perpendicular to the grain. Using sole plates of dry finger-jointed timber or glued laminated timber helps mitigate dimensional loss. When calculations predict significant crushing of rim joists, the carpenter fits relief corbels or uses vertical anchor dowels that transfer concentrated load runs without stressing the softer fibres of the flat-laid timber.
Transmission of shear and tensile forces between storeys
The junction between two stud walls separated by a box beam or joisted floor represents the most heavily stressed zone for overall bracing. Standard SIA 265 addresses timber behaviour under mechanical loads and requires continuous load transfer of horizontal wind and seismic forces from the upper diaphragm down to the foundations. When the upper-storey wall rocks or slides, the force cannot simply pass through the secondary fixings of the cladding panel: it requires a direct kinematic chain between frame studs and girders.
- Storey nailing line
- Linear arrangement of fasteners (ring-shank nails or structural screws) connecting the shear wall panel of the upper storey to the bottom plate, then to the floor rim, ensuring horizontal shear flow transfer without discontinuity in the path.
For floor shear transmission, the shear panel either extends downwards to overlap the floor rim board and the top plate of the level below, or terminates flush with the top of the finished floor. In this second configuration, the shear force flow must pass through shear angle brackets or angled screws driven through the bottom plate, the floor decking and the rim board, into the underlying top plate. For tensile forces due to overturning, metal hold-down anchors with thick bearing washers must link the end studs from storey to storey using threaded rods or through-bolts.
| Connection component | Resisted force | Structural path | Watchpoint on construction site |
|---|---|---|---|
| Continuous hold-down anchor | Pure tension (overturning) | Upper stud to lower stud via through rod | Exact positioning of hole drilled through the floor, torque-controlled tightening |
| Structural screws driven at 45° | Horizontal rim shear | Bottom plate to rim joist and lower top plate | Strict compliance with edge and end distances to avoid splitting end grain or edges |
| Shear wall overlap by continuous panel | Combined shear and tension | Upper stud to floor joists and ground-floor studs | Allowance for clearance needed for transverse shrinkage of timber joists |
Control of transverse settlement and execution tolerances during assembly
Stacking frame components generates an accumulation of timber members compressed perpendicular to the grain: sole plates, bottom plates, timber decking, rim boards and top plates. Under continuous load, cross-grain compression combined with residual drying causes significant mechanical and hygrometric settlement. If load runs bear on standard softwood whose moisture content exceeds the indoor equilibrium value, each intermediate floor can lose several millimetres in height, disrupting metal tie rods and building services connections.
To prevent this defect from assembly onward, several technical solutions are required in the workshop and during erection. Using cross-laminated timber or engineered wood products with low deformation for horizontal plates greatly reduces shrinkage. Plates can also be fitted with steel dowels or end-grain bearing blocks transferring the load from stud to stud. Finally, when vertical tie rods with threaded bars link the storeys, installing elastic spring washers or adjusting jacks compensates for vertical shortening without releasing the pre-tension required for seismic anchoring.
- Timber moisture content check on deliveryMeasure the moisture content of plates and rim joists with a pin-type or capacitive moisture meter. The value must correspond to the internal service class to limit future hygroscopic shrinkage.
- Installation of non-deformable shimsInsert structural synthetic or high-density hardwood shims under heavily loaded studs to prevent crushing of the bottom plate when tightening connections.
- Adjustment and retightening of bracing tie rodsAfter erecting the walls of the upper storey and temporarily loading the floor, check the seating of hold-down washers and methodically retighten all bolts.
Throughout the phase of installing facade and floor elements at height, art. 23 OTConst mandates the use of perimeter edge protection in unprotected areas where the fall height exceeds 2 m. The team leader continuously adapts erection brackets and guardrails as the structure ascends to higher storeys, ensuring a safe workstation when threading anchor rods.
Managing settlement deviations and remediating bracing anchors
On a multi-storey timber frame construction site, vertical misalignment or unexpected crushing of storey plates directly compromises the transfer of tensile and shear forces. When laser level measurements reveal differential settlement exceeding permissible tolerances between the load-bearing facade and the rigid core, the carpenter must intervene before erecting the upper elements.
- Metrological inspection and levelling shimsMeasure the exact level at each end stud. In the event of localised sagging of the bottom plate or rim member, insert non-deformable structural shims under the studs rather than under the shear panel.
- Restoring diaphragm panel continuityIf the diaphragm expansion joint has opened excessively, restore shear capacity by fitting structural panel gussets, nailed or screwed in accordance with the timber engineer's specifications.
- Adjustment of tensile connectionsRemediate storey anchors using continuous through threaded rods or adjustable 3D connectors. Leave temporary vertical sliding play to absorb the initial creep of cross-grain timber.
Standard SIA 265 requires that member deflections be checked taking into account shrinkage effects and stresses perpendicular to the grain. If geometric tolerances cannot be met due to defects in the concrete base or excessive moisture content of delivered timber, the contractor applies art. 365 CO by informing the client that these circumstances compromise the regular execution of the works.
Frequently asked questions
How do you correct an out-of-plumb defect caused by floor rim settlement?
The load should be temporarily relieved using mechanical jacks positioned under the affected studs. The crew then inserts steel or composite shims under the vertical stud ends to restore the datum level. Once plumb is re-established in accordance with standard SIA 265, tension-resisting connectors are redrilled or secured to a sound area to guarantee the direct passage of vertical loads.
Can nailed perforated plates be used to connect two walls separated by a floor?
This solution is permitted only for transferring low-magnitude tensile forces and provided the nails respect the specified edge distances. If settlement of the flat-laid timber members is significant, the plate risks buckling as the top plate compresses. It is preferable to adopt vertical hold-downs with thick bearing plates or rods passing directly through the floor thickness.
What timber moisture tolerance does standard SIA 265 require to limit storey settlement?
Standard SIA 265 recommends installing timber with a moisture content matching the average in-service equilibrium moisture content. For an insulated and heated frame structure, the target value is between 9% and 15%. Installing plates or joists above 18% leads to significant radial and tangential shrinkage during in-situ drying, which accentuates differential settlement at supports and disrupts bracing connections.
How do you compensate for differential deflection between a timber-frame facade and a concrete stair core?
The concrete core remains rigid while the timber-frame facade settles due to cumulative flat-laid plates and creep. To neutralise this difference, the carpenter details the facade height with an initial erection camber specified by the timber engineer. The junction connections between both materials must also incorporate slotted holes or sliding bearings to prevent uncontrolled shear on fasteners.
Texts and standards cited
- norme SIA 265Timber structures: design rules, verification of deflections and connections
- CO art. 365Materials and site: the contractor informs the client when circumstances compromise the execution of the works