Key takeaways
- A single soaking wash saturates the wood pores and destroys the oil finish.
- Routine maintenance is carried out exclusively by damp mopping using a suitable relipidising plant-based soap.
- Dense felt pads and entrance mats stop the daily mechanical abrasion of the boards.
- The signed maintenance sheet certifies the handover of instructions and protects the tradesperson against wear-and-tear damage.
Prohibit standing water and prescribe compatible maintenance soaps
An oiled parquet floor does not provide an impermeable film comparable to that of a film-forming seal. The oil saturates the cellular network of the wood in depth while leaving the pores open to maintain hygrometric exchanges with the ambient air. The use of abundant water during cleaning is the primary cause of premature failure in this type of work. When a dripping mop or a bucket of water is tipped onto the boards, the liquid immediately penetrates through the edges, header joints and natural micro-cracks in the wood. The water stands beneath the surface layer, causes the fibres to swell asymmetrically, and generates irreversible cupping of the edges, while causing indelible grey tannic oxidation stains.
The daily hygiene of an oiled wooden floor relies primarily on dry dust removal, using a vacuum cleaner fitted with a soft natural-bristle brush or a flat mop equipped with a disposable electrostatic gauze. To remove adhered dirt, damp cleaning must only be carried out with a cotton fringe mop or a specific microfibre cloth, wrung out until it leaves only a damp film that evaporates in under two minutes.
| Product category | Compatibility | Action on the protective film and the wood |
|---|---|---|
| Natural soap for oiled parquet (soya- or coconut-based) | Mandatory | Cleans gently and re-deposits a film of nourishing plant oil with each pass. |
| Standard black soap or pure Marseille soap | Prohibited | Excessive alkaline content that dries out the fibres and bleaches the oak tannins. |
| White vinegar, household alcohol, bleach | Prohibited | Direct chemical attack on resinous binders and creation of discolouration rings. |
| Multi-surface cleaner or washing-up liquid | Prohibited | Agressively degreases the wood, leaving the surface unprotected against dirt. |
| Regenerating maintenance oil, solvent- or water-borne | Periodic | Restores saturation in high-traffic zones without requiring sanding. |
Install protective barriers and formalise the handover of the work
Preserving a wood floor covering requires preventive measures even before the premises are put into service. Mineral particles brought in on shoe soles from outside act like sandpaper under foot traffic. The parquet installer must demand the installation of a technical barrier mat at every exit opening to the exterior. This entrance system must feature an adequate minimum walking length to wipe shoe soles and trap abrasive quartz particles before they reach the interior floor work.
- Compressed felt wear pads
- Interface elements made of dense wool or synthetic materials, mechanically fixed by screwing or nailing under the legs of movable furniture, designed to eliminate direct friction and tear-out scratches on the finish.
Chairs, tables and sideboards must have these pads fitted under each leg. Basic self-adhesive versions detach rapidly under lateral shear and collect abrasive dust along their adhesive edges; screw-in base or plastic-nail models are preferred. For castor office chairs, the use of a rigid polycarbonate floor mat free of acidic plasticisers is required, or the mandatory replacement of hard type H castors with soft type W castors suitable for parquet floors.
- Final joint inspectionWalk through the entire finished surface under raking light with the client or the site management to verify the absence of scratches or fouling.
- Verbal explanation of techniques and bottlesPhysically show the appropriate mop, demonstrate the proper wringing out of the fringe, and present the specific relipidising soap supplied with the floor.
- Handover of the written maintenance protocolProvide the technical document detailing mopping frequencies, initial drying times before laying rugs, and the company's emergency contact numbers.
- Signing of the handover recordHave the client initial the instruction sheet to certify compliance with the duty to inform and prevent disputes concerning improper maintenance.
The maintenance guide in the acceptance report: handover and signing
Handover of the work marks the transfer of custody of the floor to the client. For the parquet installer, this pivotal moment confirms the conformity of execution and engages the responsibility of the end user in preserving the protective film or impregnation. According to the recognised rules of the trade governed by standard SIA 253, the tradesperson must provide instructions for use and cleaning adapted to the applied treatment. Verbally explaining how a natural oil or a water-borne seal works is not enough: providing a detailed technical data sheet, countersigned at the same time as the acceptance report according to standard SIA 118, constitutes the only material proof that the purchaser received the operational warnings.
During this critical drying and chemical curing phase, the wood remains particularly vulnerable to liquid stains and mechanical damage. The sheet handed over to the client must state very clearly the completion date of the work, the exact type of oil or varnish used, and the strict prohibition on covering the floor with impermeable plastic sheeting or rugs that would block the gas exchanges essential for curing.
- Joint walkthrough of the workInspect each room with the client or the site management under diffused natural light, checking the consistency of the satin sheen and the absence of dust trapped in the finish.
- Hands-on demonstration of routine cleaningDemonstrate the proper equipment in real conditions: handling the cotton fringe mop, rigorous wringing of the cloth which must leave only a damp film drying in two minutes, and precise dosing of the suitable plant soap.
- Joint signing of the maintenance sectionHave the technical maintenance annex attached to the acceptance report initialled, certifying receipt of the manufacturer's data sheets and the starter bottles supplied on the construction site.
Operating instructions: dirt barriers, pads and prohibition of standing water
Water is the structural enemy of installed timber. An oiled floor has no impermeable film barrier like a two-component polyurethane varnish: its pores remain open and saturated with drying oils or waxes. When a bucket of water is emptied onto the parquet or a soaked mop is left on it, water penetrates by capillary action along the long edges and tongue joints. The effect is destructive: oak reacts immediately with tannin bleed causing indelible black rings, the wood swells locally, creating irreversible lipping and marked cupping of the parquet boards.
- Absolute prohibition of high-pressure steam cleaning appliances, the heat of which degrades the oil instantly and ruptures the wood fibres.
- Strict prohibition of multi-purpose detergents and products containing ammonia, chlorine, vinegar or chelating agents, which strip the protective finish.
- Banning of abrasive microfibres with high degreasing power, which strip the wood by removing nourishing waxes over successive passes.
- Mandatory requirement to use exclusively soaps for oiled parquet rich in natural plant fats, ensuring the regeneration of the surface film with each maintenance cycle.
| Risk factor | Consequence on the parquet | Mandated technical measure |
|---|---|---|
| Quartz grains and grit under shoe soles | Deep scratches, local abrasion of the finish, indentation | Outdoor foot-scraper mat combined with an indoor absorbent mat of at least 1.50 metres |
| Chair legs and movable furniture | Scuff marks, circular wear down to bare wood | Thick wool felt pads screwed or nailed under legs (prohibit hard plastic pads) |
| Castor office chairs | Surface delamination under repeated rolling loads | Soft type W castors compliant for hard floors or installation of a polycarbonate mat |
| Plant pot saucers | Trapped condensation, black fungal decay stains | Slotted wheeled stands ensuring a circulating air gap under the container |
Indoor climate management completes this preventive framework. The parquet installer provides written notification of the equilibrium hygrometry ranges compliant with Swiss standards, namely a relative humidity between 30 and 60 % for an ambient temperature fluctuating between 18 and 22 °C. During the winter heating period, the drop in relative humidity inevitably leads to dimensional shrinkage and the opening of continuous joints. Installing air humidifiers helps limit this natural hygroscopic behaviour and prevents abnormal stress in glued or nailed joints.
Maintenance damage and post-handover deterioration: management protocols
When a freshly oiled parquet floor displays defects a few days after acceptance, the client's immediate reaction is to blame the finish or the impregnation. In the vast majority of cases, the damage results from post-construction cleaning carried out with excessive water or an alkaline multi-purpose detergent. The massive ingress of water causes wood fibres to raise, boards to cup along the edges, and surface whitening due to emulsification of oils and waxes that are not fully cured.
As soon as such damage is identified, the parquet installer arranges an on-site joint inspection. It is advisable to check for the absence of pads under furniture being installed, the saturation or absence of the entrance doormat, and to request the technical data sheet of the products used by the cleaning team. The key document remains the maintenance sheet handed over against signature upon acceptance of the work, in accordance with standard SIA 118 and the Code of Obligations (CO). This receipt proves that the user received the instructions prohibiting washing with excessive water and detailing the obligation to use relipidising plant-based soaps.
Remedially, the intervention depends on the depth of moisture ingress and how long the liquid remained standing. If the wood fibres display only a light greyish haze without irreversible geometric distortion, gentle cleaning with a single-disc rotary machine using a suitable pad and a concentrated regenerating soap will dissolve limescale deposits and residual grease. Once the substrate is completely dry under controlled humidity, a new coat of maintenance oil is applied and then buffed to rebuild the protective film and restore the original beading effect. Conversely, if abundant washing has caused pronounced cupping or joint opening of the boards, one must wait several weeks for the room to stabilise before considering levelling sanding and a complete refinishing of the system.
Frequently asked questions
Why is a soaked mop fatal to an oil-impregnated parquet floor?
Oiled parquet keeps open pores to regulate ambient humidity. A large quantity of standing water quickly penetrates through the oil layer and infiltrates into the board joints. The wood fibres absorb this liquid, swell and cause edge cupping. As it dries, the water dissolves residual soaps and bleaches tannins, leaving whitish water marks that cannot be removed without mechanical sanding or heavy chemical stripping followed by re-oiling.
Which cleaning soaps must be prescribed for an oiled floor?
Only natural parquet soaps based on soya or coconut plant oils must be prescribed, free of solvents and synthetic detergents. Unlike universal household cleaners that degrease and strip the finish, these specific soaps clean away dirt while depositing a thin relipidising film with each pass. This microscopic layer nourishes the wood and offsets wear on the oil. Any universal household cleaner or alkaline washing-up liquid remains strictly prohibited.
Why are the doormat and felt pads an integral part of the warranty?
Sand and grit carried in on shoe soles act like an abrasive on wood finishes. Installing an outdoor and indoor matting zone stops the vast majority of mineral particles before the threshold. Similarly, felt pads under chair and furniture legs prevent indentation and deep scratches. Damage resulting from abrasive friction constitutes a lack of precaution by the user, not an installation defect.
What risk does the parquet installer run by failing to have the maintenance sheet countersigned?
Without a written sign-off by the client or their representative, the installer remains exposed in the event of a dispute under the Code of Obligations (CO). If the customer uses a steam cleaner or an aggressive detergent, they can claim they never received any instructions. The expert will then deem the lack of information to be negligence attributable to the tradesperson. The signed sheet is the only tangible proof that the duty to inform was properly fulfilled.
Texts and standards cited
- SIA 118General conditions for construction works
- Code des obligationsGeneral rules governing the works contract and the contractor's duties to inform