🧱 CFC 283Parquet sanding: grits and flatnessChapter 3 of 10 in the section

Edges: edge sander, transition with the main machine, corners and half-moon marks

This chapter details professional methods for sanding the perimeter of a parquet floor without creating hollows or circular scratches. You will learn how to adjust the edge sander, blend the perimeter zone into the path of the belt sander, eliminate the half-moon mark under grazing light, and manually dress sharp corners with a scraper.

Key takeaways

  • The half-moon mark is caused by the oblique attack of the edge sander's rotating disc.
  • The grit progression on the edge sander must strictly follow that of the main machine.
  • The transition is executed by feathering the passes to prevent any hollow along the walls.
  • Internal corners and recesses require manual finishing with a scraper followed by a sanding block.

Operating the edge sander and neutralising the half-moon mark

Perimeter sanding is the most delicate operation in surface treatment. Unlike the belt sander, which works in a straight line parallel to the wood grain, the edge sander uses a flat-spinning abrasive disc. This circular motion cuts across the wood grain on half of its rotation, leaving a succession of curved micro-grooves. If the tradesman keeps the tool stationary or exerts asymmetrical pressure on the handles, this mark takes on the characteristic shape of a half-moon visible as soon as daylight enters in a grazing beam through a glazed bay.

  1. Adjusting the support rollers of the edge sanderAdjust the height of the rear rollers on a perfectly flat sample surface. The abrasive disc must skim the wood with a minimum cutting angle to distribute the effort without gouging the substrate.
  2. Sweeping in continuous arcs from left to rightMove the tool without stopping, describing a regular fan-shaped movement. The forward speed must remain constant to ensure a uniform pass depth along the skirting board or drywall.
  3. Respecting the complete grit sequenceNever skip more than one grit size. If the room started with grit 40 using the belt machine, treat the edges with grit 40, then 60, 80, and 100 to 120. Each pass must erase the striations left by the previous abrasive.

SIA 253 requires flatness and a homogeneous surface appearance, free from visible striations under standard lighting. To validate the erasure of the half-moon marks, position a halogen or LED spotlight flush with the floor, directed towards the skirting board. If a circular arc remains after grit 80, immediately rework the area with a random orbital sander equipped with an intermediate soft pad at grit 100, guiding the device parallel to the grain to break the orientation of the circular scratches.

Executing the machine transition and dressing corners with the scraper

The transition zone between the pass of the large belt sander and the perimeter strip worked with the edge sander generally measures between ten and twenty centimetres. This overlap is a frequent site of hollows or steps visible under varnish or oil. The main machine must not strike the border perpendicularly: it initiates its drum lowering by rolling and raises it in the same fluid movement, creating a tapering excess-thickness zone that the edge sander then crosses smoothly.

Sequence of tools and abrasives on perimeter areas
Work phaseSpecific toolingRecommended grain sizeSurface objective
Rough sanding of edgesShort-arm edge sanderGrit 36 or 40Levelling of boards and stripping
Perimeter refinementLong-arm edge sanderGrit 60 to 80Removal of coarse scratches
Cleaning of sharp cornersCorner scraper sharpened with a burrManual (tempered steel)Sanding of inaccessible corners
Transition and neutralisationOrbital sander or hand blockGrit 100 to 120Total disappearance of half-moons
  1. Treating internal corners with the manual scraperThe circular casing of the edge sander leaves an unworked triangle in each corner. Remove the old varnish and level the wood using a triangular scraper pulled in the direction of the grain. Ensure you create a regular burr on the burnisher to cut the wood cleanly without tearing out chips.
  2. Manually sanding recesses and door frame surroundsAround door frames and under low radiators, use a rigid cork block covered with abrasive paper of the same grit as the room's final pass. Work exclusively in the direction of the grain to rule out any transverse marks.
  3. Unifying the transition through overall sandingRun the single-disc machine equipped with a grit 120 abrasive mesh over the entire parquet floor, letting it extend as far as possible onto the edge without hitting the walls. This wide rotary sweeping softens micro-differences in gloss and unifies the wood texture before applying the finish.

Erasure of half-moons and optical neutralisation under grazing light

The perimeter zone of a parquet floor is the most critical part of mechanical sanding. While the belt sander works linearly and continuously along the axis of the boards, the edge sander uses a rigid rotating pad that attacks the wood grain intersectingly. This gyrating movement inevitably leaves arc-shaped scratches, commonly called half-moons. Invisible under direct overhead lighting, these micro-grooves reveal themselves with merciless clarity under grazing light, particularly in front of floor-to-ceiling glazed bays, French windows, or glazed corridors.

The definitive elimination of these circular machining marks relies on a strict principle of progressive softening and texture alignment. The 15 to 20 centimetre overlap band, located between the area worked by the large sander and the edge of the skirting boards, undergoes cross-abrasion. If a varnish, oil, or wax is applied directly without correcting this overlap zone, the refraction of light on the perpendicularly cut fibres will reveal a flagrant difference in texture, non-compliant with the appearance requirements prescribed by standard SIA 253 for wooden floor coverings.

  1. Intermediate edge sandingAfter roughing with grit 40 or 60, carry out the edge pass with grit 80 then 100 or 120. The machine must be guided by ample and fluid oscillating movements, avoiding any stillness of the pad which would dig an irreversible local hollow.
  2. Mechanical breaking of the half-moonPass a random orbital sander equipped with a soft pad and a corundum or zirconium abrasive disc of grit 100 to 150 over the entire width worked by the edge sander, overlapping widely onto the belt machine's trace.
  3. Longitudinal manual keying for erasureFinish the transition with a cork sanding block or a rigid foam block coated with abrasive paper of identical or slightly finer grit (grit 120 to 150). This gesture must imperatively be executed in the exact direction of the wood grain to straighten the fibres and erase residual transverse scratches.

Sanding of corners and peripheral manual finishing

The circular pad of an edge sander can under no circumstances penetrate internal 90-degree corners, under very low heating elements or around complex metal door frames. In these inaccessible areas, the raw wood retains old finishes or presents an excess thickness compared to the sanded area. Geometric connection requires work with a triangular corner scraper followed by rigorous manual sanding, executed with blocks adapted to the reliefs.

Protocol for sanding and transition according to tool and grain orientation
Treated zoneMain toolGrit size or finishing toolMandatory working direction
Main fieldDrum belt sanderSuccessive grits 40 - 60 - 80 - 100/120Direction of grain or slight bias on chevron parquet
Peripheral edgesRotary disc edge sanderSuccessive grits 40 - 60 - 80 - 100Movements in arcs of a circle with regular pressure
Transition zone (15-20 cm)Random orbital sanderGrit 100 then 120/150 discsCrossed blending movement over the demarcation
Internal corners (room corners)Corner scraper sharpened with burrHard block by hand grit 80 then 120Strictly in the wood grain, never across
Door frame feet and pipeworkParquet chisel or gougeGrit 100/120 abrasive paper on profiled blockFollowing the profile of elements without cutting into uprights

To dress an internal corner, the tempered steel blade scraper must be prepared with a clean burr, dressed with a fine file and burnisher. The tradesman pulls the scraper towards them in the direction of the wood grain, maintaining constant pressure without making the blade chatter. Fine chips must detach without tearing material. As soon as the corner level is sanded down to the plane of the sanded surface, the corner is reworked with the hand block to connect the micro-profile.

The team leader performs a systematic self-inspection before authorising the application of the finish. An inspection lamp or a spotlight placed flush with the floor makes it possible to track down the final half-moon traces and corner over-thicknesses. Any anomaly detected at this stage is immediately rectified with the grit 120 manual block. Once the varnish or oil is applied, the cost of reworking a scratched edge requires complete refinishing of the room, as partial vitrification of an edge always leaves a visible transition.

Reworking edge defects: visible half-moons and edge hollows

When the application of the first coat of primer or oil highlights circular half-moon scratches or a demarcation line between the central strip and the perimeter, the site must immediately stop the impregnation stage. According to standard SIA 253, wood floors must present a homogeneous surface free from tool traces perceptible in a standing position under diffuse natural lighting. Any optical excess thickness or disc attack mark visible under grazing light constitutes a surface non-conformity that will not disappear with successive finishing coats.

  1. Diagnosis under grazing spotlightSweep the perimeter with an inspection lamp positioned ten centimetres from the floor to spot abrasion ridges, hollows dug by the pad, and unkeyed scraper marks.
  2. Equalising the transition with the orbital sanderRework the transition zone between the main strip and the edge with a soft pad grit 100 then 120, guiding the device parallel to the parquet boards to break the orientation of circular scratches.
  3. Manual sanding in cornersDress the right angle with the rigid cork block grit 120, always in the direction of the wood fibres, eliminating iron chatter marks left by the scraper.
  4. Dust removal and full re-vacuumingEliminate residual dust lodged in the pores to check the total disappearance of half-moons before locally reworking the treatment system.

If the edge sander has dug a local depression greater than the tolerances permitted by standard SIA 253, purely manual reworking becomes impossible without creating a perceptible hollow under the skirting board. The team must then re-engage the belt sander from the middle of the room by feathering its attack angle at 15 degrees relative to the grain, before making another parallel finishing pass. It is only after this global mechanical softening that the colour and texture transition will become invisible again.

Frequently asked questions

How to spot a half-moon trace with certainty before applying the finish?

Before applying any product, inspect the perimeter on your knees with a grazing lamp projecting a beam almost parallel to the parquet, observing perpendicularly to the rays. Lightly rubbing a degreasing solvent pad or applying a carpenter's pencil stroke obliquely instantly reveals the circular micro-grooves left by the edge sander disc before definitive drying.

What to do when the corner scraper has deeply marked the hardwood?

Defective sharpening or an excessive scraping angle creates transverse notches in the corners. Do not try to fill them with wood filler, which would change colour under oil. Sharpen a flat scraper to sand down the burr, then rework the corner with a hard block grit 80 then 120 in the exact axis of the wood grain.

Why is a difference in gloss sometimes observed between the edge and the centre?

This appearance gap almost always stems from a disparity in keying. The large belt sander crushes the fibres while the edge sander's rotary disc creates a rougher texture, which absorbs more product. To neutralise this gap, systematically finish the edge strip and the centre of the room to the same fine grit by a uniform pass with the single-disc machine.

What are the acceptance criteria for peripheral sanding according to standard SIA 253?

Standard SIA 253 requires an overall assessment of flatness and visual appearance in natural daylight, without forced artificial direct end-on reflections. Machining traces, ledges, or half-moons visible from a normal standing position at eye level constitute execution defects that the parquet layer must correct without degrading the general flatness of the work.

Texts and standards cited

  • SIA 253Wood flooring (parquets) and other glued floor coverings: flatness requirements, appearance tolerances, and conditions for acceptance of finishes.