Skip to content
Website
🧱 CFC 283Moisture in timber and in the roomChapter 6 of 10 in the section

Excessively dry air: heating, humidity below the threshold, and instructions left for the client

After this chapter, you will be able to calculate the mechanical shrinkage of solid parquet exposed to dry winter air, document the relative humidity ranges required by the SIA 253 standard, and formalise written maintenance instructions that release you from technical liability for damage caused by air sub-cooling or overheating of the dwelling.

Key takeaways

  • Heated winter outdoor air without water addition causes ambient humidity to drop below twenty-five percent.
  • The SIA 253 standard prescribes maintaining a minimum relative humidity of thirty percent.
  • Severe tangential shrinkage destroys full-surface bonding and splits solid oak boards.
  • The operating manual handed over to the client contractually defines your professional obligations as a parquet installer.

The physics of winter air and the dimensional collapse of solid wood

In January, outdoor air at zero degrees saturated with water contains only about four grams of vapour per kilogram of dry air. Introduced into the living space through infiltration or controlled mechanical ventilation and then heated to twenty-two degrees without active humidification, its absorption capacity soars while its absolute water content remains identical. The relative humidity of the room then frequently plummets to around twenty to twenty-five percent. This elementary physical phenomenon often goes unnoticed by occupants, who blame the brutal shrinkage of the wood on a material defect or installation error.

The ambient climate required for the durability of wooden floor coverings and parquet flooring dictates a relative humidity of between 30 % and 60 %, for a target temperature between 18 °C and 22 °C.

norme SIA 253

Wood is a living hygroscopic material: it constantly exchanges water vapour with the environment to reach its equilibrium moisture content. A solid oak parquet floor stabilised at the factory between seven and nine percent moisture content corresponds to an average environment of fifty percent at twenty degrees. Placed for several consecutive weeks in an atmosphere with twenty-five percent relative humidity, the wood loses its bound water, dropping towards an equilibrium of about five percent. This desorption is accompanied by inevitable volumetric shrinkage, oriented mainly along the tangential axis of the grain.

Behaviour of solid oak according to ambient relative humidity at 20 °C
Relative air humidityWood equilibrium moisture contentAverage dimensional variation (140 mm board)Floor condition and stresses
50 % to 55 % (summer comfort)9.0 % to 10.0 %Installation referenceClosed joints, zero adhesion stresses
35 % to 40 % (lower winter threshold)7.0 % to 7.5 %Shrinkage of 0.8 mm to 1.1 mm per boardAppearance of regular compliant fine joints
20 % to 25 % (critical dryness)4.5 % to 5.2 %Shrinkage of 2.2 mm to 2.8 mm per boardExtreme stress on the adhesive film, grain cracks

When shrinkage occurs on a nailed or fully bonded parquet floor, the mechanical stresses locked in the underside create an internal bending moment. The board cups, its edges lift and the transverse tensile stress exceeds the mechanical strength of the end grain. The widest boards end up splitting along their length, generally at grain irregularities or in the immediate vicinity of the grooves. The disorders recorded by the thermo-hygrometric logger then demonstrate that the work was subjected to stresses far harsher than the tolerances provided for a building in service.

Written humidification instructions and the boundary of responsibilities

The parquet installer's role consists of delivering work complying with recognised rules of the art, on a suitable substrate and under controlled climatic conditions on the day of acceptance. Once the construction site is handed over to the client, managing the indoor climate falls under the normal use of the rented or inhabited property. Without clear instructions transmitted on a traceable medium, the lay client assumes that the floor requires no special care apart from routine cleaning. In the event of a winter dispute, the lack of maintenance instructions often attributes the damage to a failure of information by the artisan.

  1. Recording parameters at the acceptance of the workMeasure the air temperature, ambient relative humidity and parquet surface temperature with a calibrated hygrometer, then record this data in the acceptance report.
  2. Handing over the maintenance and operating bookletHand over the technical notice in person against signature, specifying the mandatory hygrometric ranges of the SIA 253 standard, namely thirty to sixty percent relative humidity.
  3. Formulating ventilation and humidification requirementsDetail the impact of underfloor heating and controlled ventilation, specifying the need for a mechanical evaporative air humidifier as soon as the outdoor temperature drops below zero.
  4. Setting the limits of contractual liabilityExplicitly mention in writing that desiccation cracks and delamination resulting from a moisture level below the normative threshold constitute a building operation defect.

The parquet contractor cannot be held liable for weather fluctuations or the target settings imposed by the occupants of the premises. When the expert hygrometric survey demonstrates prolonged exposure below the prescribed minimum threshold, the professional's liability stops where the client's maintenance obligation begins. Maintaining a healthy indoor climate jointly protects the respiratory health of the inhabitants and the dimensional stability of solid wood assemblies.

Mechanical manifestations of air at 25 % humidity and on-site diagnosis

When the air in a heated room drops to 25 % relative humidity in the middle of winter, the hygroscopic equilibrium of the wood collapses to around 5 %. For solid oak machined and laid at an initial rate between 7 % and 11 %, this brutal water loss generates considerable transverse shrinkage. In a full-surface bonded installation, the rigid or elastic adhesive offers continuous resistance to the shrinkage movement of the underside of the boards, while the facing exposed to the dry environment shrinks without direct restraint. This stress differential causes very pronounced reverse cupping, longitudinal checks in the solid wood and, in extreme cases, mechanical tearing of surface fibres or complete cracking of the widest boards.

The contradictory diagnosis conducted on a winter defect requires separating a workmanship defect from structural behaviour linked to climatic drying. The parquet installer carries out methodical measurements upon entering the premises. They record the ambient temperature and air humidity using a calibrated thermo-hygrometer, then probe the core moisture content of the wood using insulated pin electrodes. If the device displays wood moisture below 6 % and the air stagnates at less than 30 %, the technical finding is unequivocal: the observed defects result from an indoor climate outside contract tolerances.

Behaviour of a solid parquet floor according to ambient air relative humidity ranges at 20 °C
Relative air humidityWood hygroscopic equilibriumMechanical behaviour of boardsObserved pathological risk
Less than 30 %Less than 6.0 %Violent shrinkage, maximum surface transverse tensile stressesHeart checks, edge detachment, fibre rupture, longitudinal splits
35 % to 45 %6.8 % to 8.5 %Moderate shrinkage complying with acceptable seasonal variationsOpening of fine capillary joints, general bonding stability
45 % to 60 %8.5 % to 11.0 %Nominal dimensional equilibrium recommended by the SIA 253 standardStable parquet, no tension, closed joints without excessive compression

Active humidification prescriptions and actual application limits

Handing over the maintenance and operating instructions is a fundamental act during the acceptance of the work according to the SIA 253 standard. This document expressly reminds the client that maintaining a minimum relative humidity of 35 % to 40 % is essential for the durability of the wood, for a target temperature between 20 °C and 22 °C. The effect of underfloor heating or radiators drastically lowers the saturation of incoming cold air, which contains very little absolute water vapour in winter. Without artificial water addition, no modern building can maintain this humidity threshold during periods of continuous frost.

However, these instructions run up against considerable physical and practical limits for the occupants. In a standard apartment equipped with single-flow or double-flow mechanical ventilation without humidity recovery, the constant renewal of air evacuates the humidity generated by daily life. To compensate for this deficit and bring an indoor environment back from 25 % to 40 % humidity in a 50 m² living room, the user must evaporate between 4 and 8 litres of water per day. Passive dishes placed on radiators are completely ineffective, and only electric cold-evaporation air humidifiers can achieve this flow rate continuously.

On a contractual level according to the Code of Obligations, proven non-compliance with the ambient conditions set in the technical notice transfers the cause of the damage to the building operator. Nevertheless, the expert called in for a dispute systematically assesses whether the instructions given were realistic and achievable for an individual. Recommending a rate without explaining the means to achieve it weakens the artisan's position. The parquet installer must explicitly recommend the use of domestic control hygrometers and the installation of humidification devices suited to the volume of the reception rooms.

Management of winter damage linked to under-humidification

When the outdoor thermometer plunges below zero and heating systems operate at full tilt, unhumidified indoor air frequently drops below the critical mark of 25 % relative humidity. On a glued or nailed solid parquet floor, the brutal tangential shrinkage immediately generates the appearance of longitudinal cracks, audible creaking, and edge cracking up to fibre delamination or adhesion failure. Faced with these spectacular defects in the middle of the cold season, the client almost systematically blames the quality of the laid wood or the professionalism of the parquet artisan.

Dispatched to the scene of the damage, the foreman establishes a contradictory ambient report using an approved thermo-hygrometer, then records the surface temperature of the floor. In particular, they ensure that the underfloor heating system does not exceed authorised operating temperatures. The cardinal technical rule is to prohibit any filling, gluing or planning during this crisis phase: since the wood is at its lowest shrinkage point, any hurried material intervention would block the natural movement of the boards and cause destructive lifting during summer rehydration.

The priority is to neutralise ambient dryness by installing evaporative humidifiers until the regulatory threshold is recovered. This environmental reconditioning must be maintained for several weeks to allow the progressive moisture recovery of the parquet. It is only in spring, under balanced thermo-hygrometric conditions, that the parties will carry out a final contradictory inspection: residual joints and any damaged boards can then be targeted for repairs, the financial cost of which will fall on the party responsible for non-compliance with operating instructions.

Frequently asked questions

Why does solid parquet crack specifically in January in a new apartment?

In the middle of winter, cold and dry outdoor air is heated by the heating system without sufficient humidity addition. Its relative humidity frequently collapses below 25 %, causing severe drying of the solid wood. The wood gives up its equilibrium moisture to adjust to the environment, undergoing brutal dimensional shrinkage. When internal mechanical stresses exceed the transverse resistance of the fibres, the boards shrink, split and end up bursting.

What does the SIA 253 standard stipulate regarding air humidity levels during the winter period?

The SIA 253 standard defines the ambient requirements necessary for the stability of parquet floors. For a classic indoor temperature of 20 to 22 °C, the relative humidity of the air must imperatively be maintained between 35 % and 60 % throughout the year. Below this threshold, deformations such as shrinkage cracks or detachments are considered non-compliant operation of the premises, provided the artisan has formally informed the client in writing.

Can one fill or plug parquet cracks that open in the middle of winter?

One must never fill a parquet floor in the dead of winter. At this time of year, the wood has reached its maximum contraction due to the dried air. If you fill the current cracks with resin or wood filler, the hardened material will prevent the natural expansion of the boards as soon as summer humidity returns. The boards will then lift in the form of destructive cupping. One must wait until spring.

How does the parquet installer prove that they have properly handed over the humidification instructions?

To protect against any dispute, the parquet installer attaches the maintenance sheet and climatic directives to the acceptance report of the work. This document, which must be dated and signed by the client or their representative, explains the risks of bursting linked to winter dryness below 35 % relative humidity. Without formal signature or express mention in the contractual delivery documents, the artisan struggles to prove their advisory duty.

Texts and standards cited

  • SIA 253Bonded floor coverings - Installation and requirements relating to substrates and ambient climate

In the same section