Skip to content
Website
🧱 CFC 283Finishes: lacquer, oil and waxChapter 10 of 10 in the section

Patina: wood changes colour, the sun leaves marks under rugs, and this is not a defect

Solar radiation and oxidation inevitably transform the shade of new parquet flooring. This natural patina phenomenon often surprises clients when they discover a distinct demarcation under a rug. This chapter details the chromatic evolution of timber species, the kinetics of finishes and the contractual written information protocol to be handed to the client prior to installation to defuse any disputes.

Key takeaways

  • The change in wood shade when exposed to ultraviolet rays is an intrinsic and normal property.
  • Standard SIA 253 points out that natural oxidation in no way represents a defect.
  • The contrast under rugs fades naturally once removed, through uniform exposure to light.
  • The explanatory notice signed prior to installation protects the tradesperson against subsequent aesthetic complaints.

Understanding photochemical oxidation and the chromatic behaviour of timber species

From the very first days following installation, parquet flooring undergoes a dual physical and chemical transformation. Lignin contained within the wood cell walls absorbs ultraviolet radiation from the solar spectrum as well as diffuse visible light. This photo-oxidation partially degrades the lignin molecules and modifies the extractable pigments present in the grain. Concurrently, the finishing coat—whether a water-based polyurethane varnish, an oxidative natural oil or a hard wax—reacts to ambient light and atmospheric oxygen. Together, these produce an inevitable colorimetric shift that the floor layer must technically anticipate.

Photochemical patina
Superficial and progressive chromatic alteration of wood caused by the combined action of ultraviolet radiation, visible light and atmospheric oxygen on lignin and tannins.

The kinetics and direction of this colour variation depend directly on the selected species and the surface chemistry used. Freshly sanded European oak finished with a neutral varnish presents a light beige or cool straw hue. After two years of exposure in a light-flooded living room, tannins migrate, the lignin yellows and the coating takes on an amber or deep honey tone. Conversely, conifers such as larch or Scots pine rapidly darken towards pronounced reddish-brown hues, while teak or merbau often lighten after a short initial period of darkening.

Typical chromatic behaviour of timber species under light radiation
Timber speciesInitial shade upon machiningEvolution under UVRelative sensitivity
European oakLight brown, greyish undertonesYellowing towards a golden honey toneMedium
Sycamore mapleVery bright creamy whitePronounced yellowing, butter shadeVery high
White ashPearly white to pale ochreProgressive warm gildingHigh
Valais larchLight reddish brownDarkening towards copper brownHigh
Doussié / MerbauOrange-brown to dark redInitial browning followed by lighteningVery high
American walnutDeep chocolate brownClear lightening towards golden brownMedium

The nature of the finish influences this shift. Modern water-based vitrification systems incorporate anti-UV agents that slow down oxidation without completely eliminating it. Pure vegetable oils and oil-waxes penetrate deeply into the pores without forming a surface filter barrier; they faithfully accompany the patina of the substrate while accentuating the optical depth of the wood grain. Attempting to permanently freeze the initial colour is a technical illusion.

Managing rug marking and formalising contractual written information

The most frequent dispute arises when a client moves a living room rug, low piece of furniture or sofa that has been resting on their new parquet for one or two years. The area sheltered from the sun has retained its original very light shade, while the perimeter has darkened and yellowed under the effect of glazed bay windows. The sharp geometric contrast that then appears is often mistakenly perceived by the client as faulty workmanship, varnish instability or a failure of the impregnation product. Faced with this situation, the tradesperson must rely on Swiss rules of the trade.

To avoid refusal of acceptance of the work or unjustified financial withholding, the floor layer has the obligation to inform the client prior to the start of installation. This approach must not be limited to a verbal remark made on the construction site. It must be explicitly stated in the quote, confirmed in the technical description and reiterated on the maintenance sheet handed over upon acceptance of the work. This written traceability defuses the conflict before it arises.

  1. Contractual clauses in the quoteInsert a statement specifying the foreseeable chromatic variation of the chosen timber species under the effect of ultraviolet rays, mentioning compliance with standard SIA 253.
  2. Warning regarding opaque objectsAdvise the client in writing not to place any rugs or dense mats during the first six months of occupancy to allow for initial uniform exposure.
  3. Handing over the equalisation protocolExplain in writing that in the event of demarcation under a moved rug, the area exposed to light once again will catch up with the ambient shade within a few months without abrasive intervention.
  4. Signature of the acceptance sheetHave the information document on the physical characteristics of the wood countersigned during the floor delivery report.

Impact of finishes and glazing on the speed of the patina

The kinetics of photochemical oxidation of a wooden floor depend directly on the selected surface treatment and the light spectrum entering the room. While ultraviolet radiation initiates the degradation of lignins, short-wavelength visible light also contributes to warming the shades. The application of a vitrifying sealer or oil does not block the natural phenomenon of the wood; it modifies its rate of evolution and perceived appearance. According to the execution specifications of standard SIA 253, the floor layer must anticipate the behaviour of each protection system to prevent any dispute during acceptance of the work.

Light ageing behavior according to the surface treatment system
Finishing systemDominant chromatic evolutionPatina kineticsBehaviour under occlusion
Oxidative natural oilDeep golden warming, accentuation of growth rings.Rapid: initial shift visible within the first six weeks.Pronounced contrast under rugs; gradual catch-up after releasing the area.
Oil with white pigmentsTemporary neutralization of yellowing, greyish-beige shift in the medium term.Moderate: mineral pigments act as a shield against radiation.Difference in oxidation less abrupt at the edges of textile elements.
Solvent-based polyurethane vitrifying sealerPronounced amber yellowing of the film itself combined with that of the wood.Continuous: the polymerized varnish oxidizes concurrently with the substrate.Very sharp geometric marking, very slow catch-up under natural light.
Water-based vitrifying sealer with UV absorbersMaintenance of the initial tone for longer, slow drift towards blonde.Slow: the filter delays the onset of the radical reaction of tannins.Mitigated residual demarcation, visible fading after uniform exposure.

The modern installation of large glazed bay windows to the Minergie standard accentuates thermal and light disparities within the same room. While triple insulating glazing filters a major fraction of ultraviolet rays, it allows visible radiation to pass through, which sustains photochemical degradation. In front of a south-facing transom, solid oak receives a photon flux density tenfold higher than the back of a hallway. It is essential to explain to the client that this difference in shade within the same surface in no way constitutes a defect in execution, but the direct manifestation of the heterogeneity of radiative inputs.

Acceptance protocol and traceability of prior information

Handling a dispute concerning the parquet patina is settled as early as the tender phase. In Swiss law of contract, the tradesperson's liability is waived for natural phenomena inherent to the material if their duty to advise has been formally fulfilled prior to the conclusion of the contract or the start of installation work. The floor layer who omits to record in writing the tendency to yellow or darken of the chosen timber species exposes themselves to an unjustified claim at the moment the client moves their furniture.

  1. Drafting the technical notice on the quoteInsert an explicit statement specifying the initial chromatic instability of the wood under the action of light, with express reference to standard SIA 253.
  2. Handing over the usage protocol upon deliveryFormally record on the handover report the prohibition of placing watertight rugs or occulting coverings during the first months of occupancy.
  3. Joint inspection record in the event of demarcationIn the presence of a geometric mark due to an early rug, prescribe in writing a period of free exposure to solar radiation of six to twelve months to rebalance the patina before considering equalisation sanding.

When the client notices a colour difference after removing a mat, the layer's reflex often consists of proposing localized light sanding. This technical action generally worsens the problem by breaking the continuity of the wear layer and stripping the peripheral patinated area. The technical protocol compliant with the rules of the art dictates leaving the illuminated area open to the air: catch-up oxidation occurs autonomously under light rays. Handing over a signed maintenance notice upon acceptance of the work definitively protects the installation company against any unjustified financial withholding.

Recourses and corrective measures in the face of client dissatisfaction

When the client discovers a contrasted demarcation when moving a rug after several months of occupancy, the dispute arises almost systematically. The client blames a weakness in the vitrification, abnormal discoloration or a sanding defect. If the tradesperson has not taken the precaution of recording this phenomenon in the quote or order confirmation, the dialogue quickly becomes confrontational. However, standard SIA 253 clearly specifies that natural wood floorings undergo inevitable chromatic alteration under the joint action of light and oxygen. Within the meaning of the Code of Obligations, the floor layer fulfils their duty to information by warning the client of the physical constraints inherent to the chosen material.

Faced with this aesthetic nuisance, the golden rule consists of biding one's time without precipitation. The surface that remained light must be immediately cleared of all obstacles and exposed unfiltered to solar radiation to reactivate the photo-oxidation of the lignin. In direct contact with ambient light, the oak fibres will rapidly secrete their tannins and yellow to match the adjacent honey patina. Depending on the season, the size of the glazing and the orientation of the building, a period of three to six months is generally sufficient to significantly mitigate the contrast. No tinted oil application nor any localized varnish should be attempted on this reserve area, as these artifices would accentuate the divergence as soon as the wood regains its own coloration.

  1. Joint inspectionAssess the visual imprint at eye level under diffuse natural lighting, without grazing construction spotlights, to verify the absence of mechanical or chemical alteration of the finishing layer.
  2. Contractual traceabilityPresent the client with the technical data sheet or signed quote explicitly mentioning the obligation to defer the placement of rugs during the shade stabilization phase.
  3. UV waiting protocolRecord an observation period of at least six months without covering to allow solar radiation to naturally equalise the surface before deciding on a global remedial measure.

Frequently asked questions

How long must one wait before placing a first rug on freshly installed parquet flooring?

For vitrified or oiled parquet, it is recommended to wait a minimum of four to eight weeks before installing a rug. This period allows first for the complete hardening of the protective film to its core and limits the onset of a brutal contrast during the initial photo-oxidation phase. Ideally, on sensitive species such as oak or exotic woods, the occupant should regularly shift the location of rugs during the first year of occupancy.

Does the phenomenon of darkening or lightening affect all timber species in the same way?

No, chromatic kinetics vary according to the chemical composition of each species. European oak and ash tend to yellow to take on a honey or amber patina under the action of ultraviolet rays. Conversely, dark woods such as European walnut lighten over years. Exotic woods, rich in extractable substances such as merbau or ipe, darken very rapidly at first, accentuating the risk of differential marking under furniture.

Is it possible to avoid the colour change of an oak floor thanks to vitrifying sealers with anti-UV filters?

Varnishes and oils formulated with ultraviolet absorbers significantly slow down the speed of yellowing, but do not totally prevent it. Visible sunlight penetrates the transparent layer and ends up reacting with the phenolic compounds of the solid wood. These anti-UV additives delay the contrast under rugs for a few seasons, but a progressive chromatic evolution towards warmer tones remains inevitable over the medium term.

What should be done if the client refuses to wait for the natural equalisation of the light mark under the rug?

If equalisation by solar radiation is refused and the floor layer has failed in their prior information duty arising from the Code of Obligations, the technical solution consists of full bare-wood sanding of the entire room. A new complete finishing system must then be applied. This total restoration eliminates the contrast zone, but restarts the complete patina cycle, thus requiring rigorous postponement of the replacement of the incriminated rug.

Texts and standards cited

  • SIA 253Wood floor coverings and parquet: appearance tolerances and material properties
  • COCode of Obligations: contractor's duty of information and diligence

In the same section