Key takeaways
- A ground-bearing slab continuously diffuses moisture that simple screed drying can never stop.
- Standard SIA 253 requires a water vapour barrier beneath wooden elements.
- The polyethylene sheets must have a sealed overlap of at least twenty centimetres bonded along the centreline.
- The perimeter upturn exceeds the edge of the finished parquet before being concealed by the skirting board.
Understanding the continuous moisture supply from a ground-bearing slab in accordance with standard SIA 253
A ground-bearing slab or a slab located above an unventilated crawl space behaves differently from an intermediate floor slab. Even when the cement or calcium sulphate screed shows compliance during the calcium carbide moisture test provided by the screed layer, the underlying ground constitutes an inexhaustible reservoir of water. Rising damp through the non-waterproofed concrete and partial vapour pressure migrate constantly towards the heated indoor environment.
For parquet installers, standard SIA 253 prescribes the installation of a sealing layer impermeable to water vapour diffusion as soon as the substrate rests on the ground or on unheated spaces. This barrier durably protects the parquet against upward moisture flows. In the case of floating installation or mounting on timber joists, this physical device forms the essential line of defence before acoustic underlay or the backing board.
- Sd value (equivalent air layer thickness)
- Physical quantity expressed in metres characterizing a material's resistance to water vapour diffusion. For a vapour barrier film under parquet on a ground floor resting on the ground, the minimum required value is generally at least one hundred metres.
| Structural work configuration | Main source of moisture | Interposition requirement |
|---|---|---|
| Ground-bearing slab without heavy waterproofing | Continuous vapour pressure and capillary rise from the ground | Systematic sealed vapour barrier with an Sd value greater than or equal to 100 m |
| Floor above a ventilated crawl space | Saturated outside air and condensation on the underside of the slab | Continuous vapour barrier film with bridged joints |
| Slab above a heated and insulated subterranean basement | Residual drying of the screed only | Standard polyethylene film or integrated acoustic underlay according to specification |
Install the vapour barrier with sheet continuity and perimeter upturn at the edge
The effectiveness of a vapour barrier depends on its absolute continuity. The slightest perforation, slit or absence of sealing adhesive tape creates a concentration of moisture flow towards the underside of the parquet. The parquet installer typically uses a polyethylene membrane of at least two hundred micrometres in thickness, rolled out directly over the dust-free screed.
- Substrate inspection and cleaningSweep and vacuum the substrate thoroughly. Remove any grain of sand, mortar lump or sharp edge likely to puncture the membrane under the imposed load.
- Unrolling and overlapping the sheetsRoll out the polyethylene film strips maintaining a longitudinal overlap of at least twenty centimetres between two contiguous sheets.
- Bridging and sealed bondingSeal the entire overlap joint along its entire length using a wide vapour-impermeable adhesive tape, firmly smoothed down to eliminate creases.
- Upstand against wallsExtend the plastic sheet vertically up against walls, partitions, door frames and penetrating pipework to a height exceeding the finished surface of the parquet.
At heating pipe penetrations, technical ducts or metal columns, cut the film in a star shape without excessive tearing. Reconstitute the seal using preformed sealing collars or compressible elastomer adhesive strips, ensuring that water vapour cannot bypass the barrier via capillarity along the rough walls of the pipes.
Treatment of singular points and duct penetrations on ground-bearing slabs
On a ground-bearing slab, water vapour pressure is exerted continuously from the underlying ground towards the tempered indoor environment of the building. Unlike an intermediate floor exposed to dry ambient air, the base slab not provided with a ventilated crawl space remains in direct hygrometric equilibrium with the loose soil. Telluric water migrates via capillary rise through the porosity of the concrete before vaporising beneath the floor covering. As soon as standard SIA 253 is applied to design the protective barrier, each technical duct penetration, heating pipework or drainage sleeve constitutes a preferential exhaust conduit. A local rupture of two millimetres in the membrane cancels out the performance of the entire room by creating a concentrated flow that moistens the balancing layer of the parquet and causes localized cupping or adhesive failure.
| Configuration | Capillary and vapour risk | Execution of the sealed connection | Visual inspection point |
|---|---|---|---|
| Single pipe penetration (copper, multilayer) | Concentrated moisture rise along the external wall of the pipe. | Prefabricated flexible EPDM sleeve or collar cut from a film offcut, fixed with vapour-sealed adhesive tape. | Absence of residual creases and maintenance of an upstanding collar of at least 30 mm along the pipe. |
| Bundle of grouped electrical ducts | Passage of air and vapour in the gaps between bent ducts. | Installation of a bead of compressible acrylic or butyl mastic between the tubes, covered by an adhesive sleeve bridged to the vapour barrier. | Complete coating of the duct base without air voids crossing the membrane. |
| Internal corner of raw masonry | Tension in the film causing it to tear under the weight of the parquet or underlay. | Folding in a fox-ear shape without cutting with a utility knife, carefully folded flat against the wall. | Perfect pressing of the membrane into the corner without detachment of the fixing tape. |
| Sliding bay or French door threshold | Thermal condensation and infiltration through the edge of the screed assembly. | Extension of the membrane up to the lower edge of the frame profile, sealed with a non-detachable vapour barrier tape. | Total coverage of the expansion gap without any tear initiation during passage. |
For vertically insulated thermal pipes, the insulating sheath must never stop below the vapour barrier film, as this risks forming a damp convection channel. The parquet installer ensures that the thermal insulation is clean, then incises the membrane in a star shape to the exact diameter of the conduit. Each tab is turned up along the duct, then bonded using a certified aging-resistant vapour barrier bridging adhesive. A second circular adhesive bead locks the junction with the horizontal floor, ensuring complete continuity without mechanical traction on the polyethylene.
Perimeter upturn at edge, integrity check and finishing interface
Capillary rise from a ground slab does not stop at the horizontal plane: it directly affects the base of perimeter masonry or bare concrete walls that lack a continuous horizontal damp-proof course. The perimeter upturn of the vapour barrier along plasters and linings constitutes the only defence against lateral moistening of the edge boards. If the parquet installer folds back or cuts the membrane at the level of the underside of the parquet, residual moisture from the masonry base penetrates through the ends of the boards or through the outer edge of the engineered parquet. The material then undergoes permanent differential expansion that deforms the edges and causes the assembly tongues to tear off.
- Positioning and maintenance of the upturn at the wall baseRoll out the vapour barrier strip allowing the membrane to extend by at least 30 to 50 millimetres along plasterwork or lightweight partitions. Temporarily hold the film against the wall using low-tack adhesive tape to avoid tearing the plaster rendering while preventing the film from slipping below the work surface.
- Checking sheet overlaps and longitudinal bridgingCheck that the overlap between two consecutive strips reaches a minimum of 200 millimetres on raw ground. Apply a sealed vapour barrier adhesive tape of at least 50 millimetres in width along the entire length of the joint, firmly smoothing with a flat spatula to eliminate any creases or air bubbles likely to channel vapour.
- Installation of acoustic underlay and parquet boardsInstall any sound insulation then the floating parquet or nailed parquet on floating joists without trapping or damaging the perimeter upturn. The film forms a complete, airtight basin that mechanically and hygrometrically decouples the wooden structure from the primary structure.
- Final trimming after floor covering stabilizationTrimming the excess film length is carried out strictly after completion of the parquet installation, flush with the upper face of the finished board. Carry out the cut using a curved-blade utility knife supported on a sacrificial block, taking care never to go below the edge of the wood to maintain the sealed screen behind the future location of the skirting board.
The final interface with the joiner responsible for installing skirting boards requires specific attention. The vapour barrier film turned up and trimmed flush with the top level of the parquet will be entirely covered by the thickness of the skirting board. The parquet installer ensures that the resilient perimeter insulation strip does not compress the film downwards. This rigorous execution guarantees that upward moisture from the ground escapes towards the upper plasters without coming into contact with the facing wood, thereby preserving the dimensional stability of the floor in accordance with Swiss codes of practice.
Moisture claims on ground-bearing slabs: diagnosis and corrective measures
On a ground-bearing slab or above a poorly ventilated crawl space, the supply of water via capillary rise never stops. When the vapour barrier exhibits a discontinuity, an unbridged tear or an absence of a perimeter upturn behind the skirting board, moisture migrates directly into the installation assembly. Defects manifest themselves rapidly: pronounced cupping of the boards, swelling of solid wood edges, blistering of engineered wood or fungal rotting of insulating underlays.
- Conservatory removal and mappingRemove the skirting boards and take up a few boards in the deformed areas to locate the moisture ingress. Check the condition of the polyethylene membrane, the presence of sealed adhesive tapes and the height of the upstand at the wall base in accordance with the principles of standard SIA 253.
- Checking penetrations and connectionsInspect technical pipe penetrations and joints between sheets. Any perforation caused by subsequent fixings or a detached sealing tape due to dust constitutes an active breach.
- Repairing the seal or liquid barrierIf the film is locally perforated in a floating installation, bridge generously using a new strip bonded with a compatible butyl adhesive. For direct bonded installation on mineral screed without a prior membrane, complete removal of the parquet is required to apply a certified two-component epoxy resin forming a vapour barrier.
Before any re-installation of new elements, the parquet installer records the condition of the substrate in writing and demands complete stabilization of the environment. The replacement wood must be scrupulously acclimated to the operating conditions of the building.
Frequently asked questions
Can parquet be installed without a vapour barrier film on a perfectly dry concrete slab?
No. Even if the residual moisture measurement of the screed shows a compliant value, a ground-bearing slab remains subject to continuous vapour pressure coming from the natural ground. Without a sealed and continuous vapour barrier membrane according to standard SIA 253, the concrete transmits this moisture to the wood as soon as the indoor climatic conditions vary, causing cupping and rotting.
What should be done if the vapour barrier was cut flush with the floor before installing the skirting boards?
Premature cutting eliminates lateral sealing and allows moisture to bypass the underlay. The parquet installer must reconstitute perimeter continuity before installing the woodwork. They apply a sealed elastomeric mastic or a butyl adhesive tape extending up the plaster or masonry, which will then be concealed by the thickness of the skirting board and its flexible sealing joint.
Does a ventilated crawl space exempt the parquet installer from installing a vapour barrier under the parquet?
No. The atmosphere of a crawl space frequently exhibits humidity close to saturation, even when ventilated according to codes of practice. Vapour migration inevitably occurs towards the heated volume through the concrete floor. The installation of a polyethylene film of at least two tenths of a millimetre with a sealed overlap remains essential beneath the parquet and its insulation layers.
How should electrical ducts crossing the ground-bearing slab be treated?
Technical service voids form direct moisture chimneys. The parquet installer must never crudely slit the film without sealing. They cut the membrane as close as possible to the pipe, apply a prefabricated flexible sealing collar or coat the duct using a deformable butyl band collar, firmly pressed onto the clean duct and hermetically connected to the surrounding vapour barrier.
Texts and standards cited
- SIA 253Bonded and floating wood, cork, plastic and textile floor coverings: requirements relating to substrates, moisture protection and installation execution.