Key takeaways
- Continuous straight sanding preferentially wears down soft edges and hollows out assembly joints.
- The first pass is carried out diagonally to level out height differences and flatten the board.
- SIA 253 sets the permissible flatness tolerances for finished parquet flooring.
- The final passes must strictly follow the wood grain to remove residual transverse scratches.
Working exclusively along the axis of the boards hollows out the joints and ruins the levelling
The classic mistake on a construction site is engaging the heavy belt sander directly and exclusively in the lengthwise direction of the boards. When an abrasive drum moves parallel to the longitudinal joint, the contact drum applies linear pressure to an area where the wood often features a mechanical discontinuity or a bevel. The abrasive belt, even when tensioned, bites more aggressively into the free edge of the board. This results in disproportionate material removal on the sides of each element, a phenomenon referred to on construction sites as induced dishing or edge hollowing.
This behaviour is accentuated on softwood species or hardwoods with a high alternation between earlywood and latewood, such as oak or ash. Along the grain, the drum preferentially extracts the soft fibres of the early growth ring, leaving the hard walls in relief. If the operator persists in this same direction with coarse grits, the machine accentuates the undulations instead of levelling the surface. When the straightedge is applied, the floor reveals systematic hollows aligned with the joints, rendering the work non-compliant with appearance and flatness requirements.
Joint hollowing becomes critical during the subsequent application of water-based finishes or hard waxes. The hollows formed along the edges accumulate a film of varnish or an excess of product that dries poorly, creates heterogeneous gloss levels and traps dirt during use. To obtain a perfectly flat panel, the roller must work overlapping several rows of boards simultaneously, which requires abandoning the straight axis right from the rough sanding stage.
The diagonal attack levels the floor prior to smoothing along the grain
To eliminate height differences without distorting the surface, the first rough sanding pass is carried out at an angle between 30 and 45 degrees relative to the wood grain. By progressing diagonally, the sander roller rests permanently on several boards at once, clipping the high points without ever being able to plunge into a longitudinal joint. This working geometry makes it possible to rapidly abrade the lips of cupped boards, remove machining thickness differences and correct slight hygroscopic movements occurring after gluing or nailing.
Wooden floor coverings must present a flat surface, free of perceptible height differences and coarse machining marks, within the limits of tolerances applicable to substrates and interior joinery finishes.
Norme SIA 253
- Diagonal rough sandingCross the room with a heavy abrasive grit oriented at 45 degrees to the laying direction. This pass abrades excess thickness without hollowing the edges.
- Compensating cross-passCarry out a second pass in the reverse diagonal direction, at 90 degrees to the first, to balance surface tensions and verify the complete disappearance of height differences.
- Intermediate rectificationSwitch to a medium grit while reducing the angle to approximately 15 to 20 degrees to begin aligning the abrasive scratches towards the main light axis.
- Strict finishing along the grainOperate the belt sander followed by the single-disc machine or the rigid multi-disc sander strictly along the wood grain with a fine grit, eliminating all traces of transverse attack.
| Parquet type | First pass (flatness) | Intermediate pass | Final pass (smoothing) |
|---|---|---|---|
| Straight-laid or random-bond boards | Diagonal at 45° to longitudinal joints | Opposite diagonal at 45° or 20° pass | Strictly parallel to the wood grain |
| Chevron or herringbone | Diagonal at 45° to main runs | Pass parallel to the general axis of the room | Multi-directional multi-disc rotary finishing |
| Mosaic or checkerboard | Diagonal at 45° on square patterns | Reverse diagonal to cross the machining pattern | Multi-disc sanding with no dominant direction |
The transition to the final pass along the grain requires methodical rigour. If a coarse-grit diagonal scratch is not completely erased by the intermediate grits, it will appear as a dark slash as soon as a primer or stain is applied. The machine must be lowered in a fluid movement, without jerking, and then raised progressively before each direction change to avoid localised sagging of the drum. Regular inspection under grazing light makes it possible to validate flatness before starting pre-finishing fine sanding.
Pass kinematics: setting the attack angle and neutralising height differences
The diagonal attack obeys a strict geometric rule: the belt sander roller must simultaneously overlap several boards to act as a mechanical jointer. When the machine moves at an angle between 30° and 45° relative to the direction of the boards, the grooved rubber tyre never plunges into the bevels or height differences between strips. Contact pressure is exerted on a continuous ridge line, which abrades heartwood and sapwood in a strictly flat manner. Conversely, a trajectory parallel to the joint causes the abrasive belt to flex into the natural hollows of the layout pattern. The drum then follows the micro-undulations instead of planing them down, hollowing the soft wood and accentuating each thickness discontinuity.
On old curved parquet flooring or after nailed installation on battens exhibiting residual cupping, a first straight diagonal pass is not always sufficient to level the floor. The team leader then schedules a second pass in the reverse diagonal direction, crossing the initial trajectory at a right angle, i.e. 45° in the other direction. This cross-attack method cancels bidirectional geometric deformations and definitively eliminates ridges formed by raised edges. For complex patterns such as herringbone or chevron, where the wood grain changes orientation in each run, the 45° attack relative to the peripheral walls ensures fair treatment of each edge, preventing the abrasive from gouging at the end of the grain.
Levelling requires absolute mastery of the sander's turning points. The characteristic hollow left by the machine at the end of a run comes from a residual dwell time while the abrasive drum is still touching the floor. To prevent this marking, the operation of the control lever must be perfectly synchronised with the movement of the carriage: the expansion roller is lifted off the parquet before the machine stops its forward motion, and then reapplied progressively once the machine is restarted for the return run. Any stationary contact with an aggressive grit creates a localised hollow of several tenths of a millimetre, which cannot be removed by subsequent passes.
Finishing along the grain, scratch removal and compliance with SIA 253
Once general levelling has been achieved through diagonal passes, the abrading work is complete: the parquet layer switches to straight sanding, strictly oriented along the wood grain. This finishing stage no longer serves to level the surface but to erase the transverse shearing marks left by the coarse grit. In the axial direction, fine grits cut the residual fibres without tearing them. If an intermediate pass were maintained at an angle, the crossed scratches would remain embedded beneath the surface and would appear dramatically as whitish ghosts when applying a varnish or natural oil under grazing light.
| Phase | Travel orientation | Grain size | Mechanical role on the work |
|---|---|---|---|
| Heavy roughing | Diagonal at 30° - 45° | P36 to P40 (zirconia) | Levelling of height differences, removal of cupping and stripping |
| Intermediate levelling | Reverse diagonal at 45° | P60 (aluminium oxide) | Flatness rectification and reduction of coarse grooves |
| Pre-finishing | Along the board axis (grain) | P80 (corundum) | Erasure of oblique scratches, alignment of micro-grooves |
| Finishing / Smoothing | Along the board axis (grain) | P100 to P120 (silicon) | Polishing of the fibre prior to sealing, oiling or waxing |
Inspection of the planed substrate is carried out using a rigid two-metre metal straightedge and a set of bevelled shims, in accordance with the provisions of SIA 253 relating to glued floor coverings. Flatness inspection is carried out in all directions, parallel, perpendicular and diagonally to the joints. The measured deflection must under no circumstances exceed the permissible values set by the standard, with no sudden discontinuity or step when crossing edges. Using a single-disc sander equipped with a satellite plate or a fine abrasive pad during the final pass helps homogenise the general texture while preventing fibre reversal at pass junctions.
Management of flatness non-conformities and repair of gouged joints
On a renovation or new installation construction site, finding transverse undulations or bevelled joints caused by a straight pass requires stopping operations before applying the wear layer. When the belt sander drum has continuously bitten into the soft fibres or hollowed out the space between two poorly levelled strips, varnish or oil will not mask any defects: grazing light reflection amplifies the hollows. Inspection is carried out using a two-metre metal straightedge in accordance with the surface tolerance requirements defined by SIA 253.
- Profile diagnosis using the straightedgePlace the control straightedge on critical assembly areas. If edge hollows exceed the limit values permitted by SIA 253, the floor must be re-flattened through overall mechanical action.
- Corrective cross-attackRework the entire parquet with a heavy belt sander equipped with a medium grit (P50 or P60), oriented strictly at 45 degrees to the fibres. This pass clips raised lips and levels joints without plunging back into the laying axis.
- Stabilisation by intermediate sandingCarry out a reverse diagonal pass at 45 degrees to cross the previous scratch network and neutralise any memory of drum undulation on the wood screed.
- Axial finishing and multi-directional surfacingPass along the wood grain again with a fine grit (P100 or P120) to erase oblique traces, then lock the surface finish with a single-disc machine equipped with a multi-disc pad prior to staining or sealing.
In the event of deep tearing or excessive gaps opened by mechanical gouging, complete filling with filler mixed with 80-grit wood dust must imperatively take place between the diagonal attack pass and finishing along the grain. This timeline avoids sanding unbonded filler and guarantees the final flatness required by Swiss tradesmanship rules.
Frequently asked questions
Why does a belt sander hollow out the wood when moving straight along the grain?
Wood features an alternation of hard and soft growth rings. By moving strictly along the axis of the boards, the drum compresses and wears down the softer springwood first and empties out the natural bevels between strips. The diagonal attack allows the abrasive roller to rest simultaneously on several boards and several hard rings, which abrades the floor without gouging the junction lines.
What should be done if diagonal scratches remain visible after the finishing pass along the grain?
This defect indicates too large a grit jump or excessive feed speed during the longitudinal pass. An intermediate grit should be inserted, for example 80 grit before 120 grit, always guided parallel to the fibres. The final use of a satellite disc sander or a single-disc machine fitted with a fine abrasive pad allows the sanding spectrum to be fully homogenised before applying the varnish.
How should patterned parquets such as chevron or herringbone be treated?
On these geometric installations, the wood grain changes orientation in each run. Rough sanding is carried out at 45 degrees to the main axis of the rooms to cut the edges to an even level. The finishing pass cannot follow all the grains: it is therefore entrusted to a multi-directional rotary sander with multiple pads to avoid nicking the perpendicular boards.
What are the flatness requirements applicable under SIA 253 for sanded parquet?
SIA 253 sets the execution and acceptance criteria for interior wooden floor coverings. It imposes precise tolerances under the control straightedge, prohibiting perceptible height differences underfoot or recurring waves caused by machine suspensions. Joint hollows resulting from poor guidance constitute a clear non-conformity requiring mechanical repair.
Texts and standards cited
- norme SIA 253Wooden floor coverings (installation criteria, surface flatness and parquet acceptance)
