Key takeaways
- Standard SIA 181 imposes precise requirements for impact noise transmitted to the neighbour.
- The attenuation of footstep noise in the room improves ambient comfort without guaranteeing insulation for the neighbour.
- An underlay that is too compressible irreparably destroys tongue-and-groove joints under daily traffic.
- The parquet layer carefully uncouples the floating parquet from each perimeter wall to eliminate acoustic bridges.
Distinguishing between impact noise transmitted to the neighbour and footstep noise perceived in the room
The most frequent mistake on the floating parquet construction site is to confuse the interior resonance of the room with the acoustic insulation towards the lower floors. When a user moves on a floating floor, two distinct acoustic phenomena occur simultaneously. On the one hand, the impact of heels or the repeated dropping of ordinary objects sets the parquet board into vibration, which radiates direct sound into the emission room: this is the footstep noise perceived in the room. On the other hand, this mechanical vibration passes through the parquet, crosses the underlay, penetrates into the floating screed or the raw slab and propagates via structure-borne transmission right into the lower apartment: this is the impact noise transmitted to the lower floor.
- Acoustic distinction of the underlay
- Transmitted impact noise designates the structure-borne vibration that reaches adjacent rooms according to the criteria of standard SIA 181. Footstep noise corresponds to the acoustic pressure reflected in the room where the step is exerted.
For the skilled parquet layer, these two concepts impose different physical compromises. Improving the walking acoustics in the room requires a heavy, dense and compact material that absorbs the dry clacking of the wood without creating a resonance box effect. Conversely, curbing the impact noise transmitted to the lower floor requires a resilient system capable of mechanically uncoupling the floor covering from the structural work in order to dissipate kinetic energy. A very elastic basic mousse can slightly deaden the footstep in the room while transmitting residual energy into the structure, thus completely failing the requirement set by the acoustic planner.
| Analysis criterion | Impact noise at the neighbour's | Interior footstep noise |
|---|---|---|
| Sound wave path | Structure-borne transmission through the slab to adjacent floors | Direct airborne radiation in the volume of the occupied room |
| Swiss normative framework | Standard SIA 181 with contractual performance obligations | Standard SIA 253 for use comfort without binding legal level |
| Sought-after characteristic | Certified elastic resilience with high impact attenuation | High surface mass to muffle the clacking of the board |
Controlling thickness under load and continuous installation to avoid acoustic bridges
Acoustic efficiency must never be achieved to the detriment of the mechanical rigidity of the work. Manufacturers sometimes offer thick felts or mousses promising spectacular gains on impact noises. However, under a permanent static load such as a bookcase or under the rolling load of an office chair, a material that is too soft undergoes progressive crushing. This creep phenomenon under load generates excessive vertical displacement at the joints. The tongue heats up, the click-fit profile shears and the parquet ends up squeaking, uncoupling or opening up over several metres.
Standard SIA 253 requires checking the compressive strength of the underlay in direct relation to the thickness of the wood boards. For a standard floating parquet, a too-soft underlay whose thickness under load sags destroys the longitudinal locking. Choosing a high-density cross-linked polyolefin product, agglomerated cork or hard wood fibres makes it possible to ensure certified impact sound attenuation while maintaining minimal millimetric deformation under continuous usage stress.
- Substrate inspection and continuous installationUnroll the underlay strips perpendicular to the installation direction of the wood boards, edge to edge and without any overlap to maintain rigorous planarity.
- Sealing joints of the stripsSystematically bridge transverse and longitudinal joints using a waterproof adhesive tape to prevent panels from sliding and sound wave leaks.
- Uncoupling of vertical elementsRun the edge strip or underlay up against each wall, pipe and door frame to a height exceeding the finished surface of the parquet.
- Trimming after installationCut the peripheral resilient strip only after the complete clicking-in of the parquet and fix the skirting boards to the wall without any contact with the boards.
The interaction between the underlay and the integrated vapour barrier deserves special attention when applied over a mineral screed. Many manufacturers now offer combined membranes equipped with a factory-glued dust or vapour barrier film. The parquet layer scrupulously ensures pointing the waterproofing sheet downwards and overlapping the cover flaps provided on the strips. This precaution guarantees both the durable maintenance of the insulation's elasticity against residual rising damp and the perfect durability of the mechanical behaviour of the wood assembly.
Qualification of performances under standard SIA 181 and standard SIA 253
On a Swiss finishing work construction site, the suitability of a resilient underlay is never reduced to a simple raw decibel value displayed on a technical data sheet. The parquet layer is confronted with two completely distinct physical issues that obey separate propagation modes: the impact noise transmitted to the lower floor and the footstep noise perceived in the emission room. Confusing these two phenomena inevitably leads to disputes upon acceptance of the work, in particular regarding the comfort or soundproofing requirements prescribed by the contract.
Impact noise transmitted to neighbouring rooms results from the mechanical vibration of the load-bearing structure caused by footsteps, falling objects or furniture movement. Standard SIA 181 sets mandatory requirements for the standardised weighted impact sound pressure level, which directly engages the responsibility of the principal and the installation company. In a floating system, the attenuation of this noise depends directly on the dynamic uncoupling created by the resilient interface, preventing the striking energy from exciting the screed or the raw slab.
Conversely, the footstep noise perceived in the room corresponds to the reflection of sound in the air of the room where people move around. A floating parquet naturally acts as an acoustic membrane stretched over an air cushion, often amplifying a sharp clacking noise that is particularly unpleasant for the user. Treating this indoor atmosphere problem requires a high-density underlay capable of adding weight to the assembly or absorbing surface resonance, which frequently opposes the elasticity mechanisms required to curb the shock wave downwards.
Mechanical resistance under load and control of acoustic bridges
To ensure the durability of the system according to the guidelines of standard SIA 253, the choice of the resilient material depends directly on its behaviour under permanent and dynamic mechanical stress. Thickness under load constitutes the critical factor: an underlay that crushes excessively under traffic or under the weight of heavy furniture loses all elastic capacity and induces sagging of the parquet joint edges, causing joint breakage or permanent squeaking.
| Underlay material | Impact attenuation at the neighbour's | Walking acoustics in the room | Creep resistance under load |
|---|---|---|---|
| High-density cross-linked polyolefin mousse | Excellent (18 to 20 dB) | Average (residual metallic footstep noise) | Good stability if density is greater than 100 kg/m³ |
| Pure agglomerated cork (2 to 3 mm) | Moderate (15 to 17 dB) | Very good (dull and muted sound) | Excellent resistance, almost zero crushing |
| Mineral complex with polyurethane binder | Very high (up to 21 dB) | Optimal (heavy mass muffling the clacking) | Remarkable under heavy traffic and point loads |
| Compressed wood fibres (felt) | Correct (16 to 18 dB) | Good attenuation of hollow noises | Sensitivity to long-term settlement |
Overall acoustic efficiency remains entirely conditioned by the rigour of installation at singular points. Any rigid contact between the parquet and vertical walls creates an acoustic bridge that immediately ruins the uncoupling calculations of standard SIA 181. Underlay strips must be laid edge to edge, without thickness overlap, and bridged using waterproof adhesive tape if an integrated vapour barrier function is required vis-à-vis the mineral substrate.
- Raise the peripheral resilient strip by at least 20 mm against vertical walls, door frames and pipes before starting to assemble the boards.
- Install skirting boards while respecting a clear gap above the parquet to avoid any vertical loading on the floating floor.
- Cut the excess insulation resilient strip only after the final mechanical fixing of the skirting boards to the wall.
- Prohibit caulking peripheral joints with rigid mastics or structural glues that transmit vibrations to the masonry.
Acoustic disputes and defects under load: diagnosis and remedial measures
When acoustic non-conformity is reported after moving in, the dispute almost always concerns two distinct findings: the downstairs neighbour complains of impact noise transmitted to the lower floor during walking, or the occupant denounces footstep noise perceived in the room as a hollow clacking. Facing these complaints, the parquet layer must first determine whether the defect stems from a weakness of the insulating assembly, crushing under heavy load or a local acoustic bridge.
- Inspection of peripheral uncouplingsRemove skirting boards at critical areas to check the integrity of the edge strip. Ensure that no grout, plaster residue or nail bridges the parquet with the wall or screed, in accordance with the uncoupling rules of standard SIA 253.
- Sounding of the underlay and sagging measurementDisassemble a row of boards in a furnished area to examine the state of the insulation. Irreversible residual crushing or excessive creep under operating load proves compressive strength unsuited to actual mechanical stresses.
- Contradictory in situ acoustic measurementsHave a standardised measurement with a tapping machine performed by a qualified acoustician to isolate the portion transmitted via lateral airborne paths from that transmitted by the raw floor.
If the acoustic bridge comes from peripheral pinching, sawing a clean joint at the edge restores uncoupling without complete disassembly. On the other hand, if the underlay has delaminated or settled under traffic, the only compliant repair requires complete removal of the parquet and installation of a certified resilient material.
Frequently asked questions
Why does an underlay that is very effective against footstep noise not protect the neighbour downstairs?
The reduction of footstep noise perceived in the room depends on the density of the underlay, which absorbs the resonance of the floating floor in the emission room. Conversely, insulation against impact noise transmitted to the lower floor requires dynamic flexibility and elastic decoupling of the assembly according to standard SIA 181. A rigid product attenuates local clacking but integrally transmits vibrations to the neighbour's ceiling.
How to avoid acoustic bridges when mounting skirting boards on a floating parquet?
The skirting board must never touch the floating parquet boards nor be fixed into the floor. It is glued or screwed exclusively against the wall surface, leaving a clear gap of at least one to two millimetres above the wood surface. To guarantee dust tightness while maintaining the acoustic break, an uncompressed elastomer flexible joint or the upturned resilient strip is inserted.
What underlay thickness should be chosen so as not to compromise the strength of tongue-and-groove joints?
According to trade rules and the requirements of standard SIA 253, an underlay under floating parquet must not exceed two to three millimetres in thickness for a standard resilient material. Excessive thickness or a mousse that is too compressible generates a spring effect during passage. This repeated bending shears the tongues and grooves or breaks the assembly clips under the weight of users.
Does the presence of floor heating influence the choice of the floating acoustic underlay?
Yes, the underlay and floating parquet assembly must not create an excessive thermal barrier penalising the heating performance. The parquet layer must add the thermal resistance of the sound insulation and that of the wood board to check overall compliance. In addition, the underlay must maintain its dimensional stability and creep resistance under continuous thermal exposure without emitting odours or hardening prematurely.
Texts and standards cited
- norme SIA 181Protection against noise in buildings: acoustic requirements for impact noise and airborne noise
- norme SIA 253Glued and floating floor coverings: execution criteria, peripheral uncoupling and tolerances
