🧱 CFC 283Moisture in timber and in the roomChapter 5 of 10 in the section

Wood breathes: joints that open in winter, close in summer, and why this is normal

This chapter provides you with the technical tools to explain the natural hygrothermal behavior of a parquet floor in French-speaking Switzerland. You will learn to distinguish permissible seasonal joint openings according to SIA 253 from abnormal shrinkage, while formalizing reservations and prior information to the client to protect your liability as a tradesperson before the first heating season.

Key takeaways

  • Wood adjusts its equilibrium moisture content to the ambient air, creating inevitable shrinkage during the heating period.
  • Standard SIA 253 sets the framework for an indoor service climate between 30 and 60 percent relative humidity.
  • Regular winter gaps below the permitted thresholds constitute normal breathing, not faulty execution of the work.
  • Written information provided to the client before work begins legally defuses disputes during the winter drop in humidity.

Hygrothermal behavior of wood and criteria for acceptability of shrinkage

Equilibrium moisture content of wood
Stabilized water content that wood reaches when continuously exposed to a given air temperature and relative humidity, causing it to swell or shrink dimensionally.

In French-speaking Switzerland, the alternation of seasons imposes marked climatic constraints on indoor parquet floors. During summer, the relative humidity of the indoor air generally fluctuates between 55% and 65%, keeping the wood at a moisture content between 10% and 11%. As soon as heating is switched on in autumn and during harsh winter months, the indoor air dries out and regularly drops below the 30% relative humidity threshold, particularly in contemporary dwellings equipped with controlled mechanical ventilation. The wood then releases its bound water to adjust to an equilibrium moisture content of 6% to 7%. This shift inevitably leads to transverse shrinkage of the boards.

Standard SIA 253 regulates the requirements for glued and floating wood flooring by specifying the normal operating climate range, between 30% and 60% relative humidity for an ambient temperature between 20 °C and 22 °C. Within this hygrometric envelope, the dimensional behavior of the material remains perfectly sound and reversible. The magnitude of shrinkage depends closely on the wood species chosen, the sawing method (quarter-sawn or flat-sawn) and the specific structure of the boards. A solid oak floor sawn flat will exhibit a high tangential shrinkage coefficient, whereas a multi-layer engineered parquet limits surface movement thanks to the cross-laid arrangement of its stabilizing layers.

Comparative diagnostic of seasonal parquet movements
Observed parameterNormal behavior (breathing)Anomaly or technical defect
Distribution of gapsMicro-cracks distributed evenly across the entire floorVery wide joints concentrated on two or three consecutive boards
Opening widthOpenings from 0.2 mm to 0.8 mm on wide boards in the heart of JanuaryGaps greater than 1.5 mm or tearing of the joint edges
Time cycleTotal closure of joints observed when humidity returns in JunePersistence of cracks and uneven levels during the summer season
Integrity of the facingFlat boards with no visible geometric deformation on the finished surfacePronounced cupping, through-cracking or rupture of the finish film

Written formalisation of tolerances and preventative advice to the client

Faced with a client who notices gaps between their recently laid oak boards in the middle of January, any ex post explanation is perceived as a dilatory pretext by the tradesperson to mask poor workmanship. To avoid unjustified payment retentions and sterile expert appraisals, the management of this natural phenomenon must take place upstream. The general obligation of information and diligence imposed on the contractor by the Code of Obligations begins as early as the technical tender phase. The quote must not be limited to measurements and prices: it must state unambiguously the living nature of the material and its physiological reactions to dry winter air.

  1. Integration of a hygrothermal notice in the quoteSystematically attach a technical data sheet recalling the humidity ranges compliant with standard SIA 253 and the direct impact of overly dry air on the appearance of shrinkage cracks.
  2. Joint inspection record of the installation climateVerify and record on the construction site report that the ambient humidity and room temperature comply with the acclimatisation criteria for the packages before opening the packaging.
  3. Handing over the maintenance protocol at acceptancePrecisely record during the acceptance of the work, conducted according to standard SIA 118, the recommendations regarding the use of air humidifiers during the heating period.

In modern, highly energy-efficient housing, humidity levels regularly drop below the 25% mark for several consecutive weeks of dry cold. Without artificial humidification regulated by the occupants, the wood undergoes forced drying that falls outside the normal operating conditions set by Swiss trade rules. From the moment the parquet installer has recorded these limits in writing prior to the intervention, the appearance of winter joint openings falls under the building's occupancy mode and not a defect attributable to the installation work.

The user of the room must ensure that the required indoor climate is maintained, particularly during the heating period, in order to prevent excessive dimensional variations in the wood.

Norme SIA 253

On-site diagnosis during the heating period: distinguishing hygrometric play from structural defect

A call from a concerned client in the middle of January regarding disjointed boards is a common situation for the parquet installer. Faced with this complaint, intervention on the construction site requires a rigorous metrological approach to determine whether the phenomenon stems from the natural breathing of the material or execution non-compliance. The first step is to immediately record the indoor climate using a calibrated thermo-hygrometer. During the heating season in French-speaking Switzerland, ambient air dropping below the prescribed relative humidity threshold inevitably leads to transverse dimensional shrinkage, which is all the more pronounced on solid parquet floors or large-width boards.

To objectify the opening of the joints, the site manager uses a precision leaf gauge or a thickness rule, coupled with a measurement of the wood equilibrium moisture content using a capacitive or pin-type moisture meter adapted to the species concerned. The analysis focuses not only on the gross width of the gap observed between two boards, but on the distribution of this shrinkage over the entire room. Shrinkage uniformly distributed across each row demonstrates the natural elastic behavior of wood in a dry climate. Conversely, the appearance of a single very wide joint, localized or accompanied by an uneven level, indicates peripheral mechanical blockage, a breakdown of the bond with the screed or an abnormal concentration of stresses.

Technical evaluation grid for winter defects on glued parquet floors
Visual and metrological findingMeasured indoor climateProbable physical originTechnical qualification
Fine joints of 0.2 to 0.8 mm regular over the entire surfaceTemperature 21 °C, relative humidity 35%Balanced radial and tangential shrinkage of the wood speciesNormal seasonal behavior
Localized openings of 2.5 to 4.0 mm with boards remaining contiguous next to themTemperature 22 °C, relative humidity 40%Point rupture of the glue film or absence of a peripheral expansion jointMechanical adhesion or joint-cutting defect
Joints of 1.0 to 1.8 mm on large-width solid oak (> 180 mm)Temperature 23 °C, relative humidity 25%Excessively dry indoor air linked to underfloor heating without humidificationClimatic operating deviation outside tolerances
Cupping of the edges associated with longitudinal surface cracksTemperature 20 °C, relative humidity 20%Severe hygrometric gradient between heated underside and dried surfaceCritical sub-humidification damage

Preventative protocol and contractual traceability of wood breathing

The parquet installer defuses any winter dispute by integrating the physical limits of wood directly into the contract and tender documents, well before the parquet is supplied. Waiting until the first winter to explain to the client that oak shrinks under the effect of underfloor heating systematically places the tradesperson in a defensive position. As early as the quote phase, a technical information sheet must explain the laws of wood volumetric shrinkage, the direct influence of board width and the absolute necessity of maintaining suitable ambient air.

  1. Formalisation in the offer and order confirmationAttach a document describing the foreseeable seasonal dimensional variation according to the selected species, structure (solid versus multi-layer) and type of finish (oil or varnish).
  2. Handing over the operating protocol at acceptanceRecord in the acceptance report according to standard SIA 118 the strict thermal and hygrometric management instructions, emphasizing the obligation to maintain air humidity between 30% and 50% in winter.
  3. Specification of regulation equipmentRecommend in writing the installation of air humidifiers in certified high-tightness buildings equipped with controlled mechanical ventilation, which are frequent vectors of drying out.
  4. Joint inspection clauseStipulate contractually that any finding relating to the opening of joints will be suspended until the end of the following summer period in order to verify the natural closure of the boards.

In the event of a formal dispute notified by the architect during the cold period, the company's written response relies on compliance with the guidelines of standard SIA 253 and the thermo-hygrometric readings of the room. When the ambient climate proves non-compliant with the required ranges, the shrinkage phenomenon relates directly to the building's usage conditions and releases the parquet installer from any liability regarding the observed deformation. This methodical traceability protects the company while providing a pedagogical, credible and irreproachable technical response.

Management of winter complaints: inspection protocol and postponement

When the client reports shrinkage in the middle of January, the technical response never consists of intervening mechanically on the work as an emergency. The professional reflex requires immediately objectifying the climatic conditions of the room before considering any remedial work. A parquet floor that opens under indoor air dried out by heating does not present an execution failure, but demonstrates the normal physical reaction of the woody material.

  1. Joint ambient readingMeasure on site the ambient temperature, floor surface temperature and relative air humidity using a calibrated thermo-hygrometer. Simultaneously record the moisture content of the wood using a capacitive probe or insulated pins.
  2. Comparison with the criteria of standard SIA 253Check whether the measured climate falls within the standard range of 30% to 60% relative humidity. If the air drops below 30%, record in writing that the dimensional shrinkage results directly from the building's climatic conditions.
  3. Formal refusal of winter fillingProhibit any refilling, resin injection or joint caulking during the heating period. Filling a winter void blocks summer swelling and causes crushed edges or lifting when humidity returns.
  4. Setting a joint summer inspectionEstablish a waiting protocol suspending any final expert appraisal until June or July. The reversibility observed when humidity rises will confirm that the parquet's behavior is compliant.

If cracks persist beyond permissible tolerances during the summer inspection under humidity stabilized at 50%, the diagnosis points to a root defect: faulty bonding on screed, non-compliant delivery moisture or peripheral blocking against masonry. Recourse to the written notice provided before work protects the tradesperson against unfounded claims regarding natural hygrometric variations.

Frequently asked questions

Can parquet cracks that appeared in January be filled to calm the client?

No. Filling in the middle of winter constitutes a serious technical fault. By sealing joints opened by heating, you prevent the natural expansion of wood in spring and summer. When air humidity rises, the parquet swells, which expels the joint or compresses the edges until the wood fibers break. The only correct measure is to humidify the air and wait for summer.

At what width does a winter crack become abnormal?

For common oak boards 70 to 90 mm wide, winter shrinkage play between 0.5 mm and 1 mm remains acceptable under dry air at 30% relative humidity. Conversely, localized spacing exceeding 2 mm on a standard board or an isolated crack concentrating play across an entire room reveals peripheral blocking or a local failure of the glue bond.

How to establish that the opening of the parquet is due to the dry environment of the apartment?

The parquet installer carries out an immediate joint inspection. They record the relative air humidity, room temperature, floor surface temperature and residual wood moisture. If the thermo-hygrometer indicates ambient humidity below 30% or floor overheating, the values are recorded in a report signed by both parties, clearing the intrinsic compliance of the work according to standard SIA 253.

What approach should be taken when faced with a client who refuses to humidify their rooms in winter?

The tradesperson reiterates in writing the maintenance guidelines provided during acceptance. They confirm that wood reacts physically to its environment and that maintaining air humidity between 30% and 60% falls under normal room usage under the occupant's responsibility. If the client refuses to humidify, the aesthetic defects resulting from this dryness cannot be the subject of a claim for defects.

Texts and standards cited

  • SIA 253Glued floor coverings: indoor climatic conditions, substrate moisture and permissible tolerances
  • SIA 118General conditions for the execution of construction work: acceptance of the work and management of notices of defects