Skip to content
Website
🧱 CFC 283Finishes: lacquer, oil and waxChapter 2 of 10 in the section

How many coats: use of the room, priming coat, intermediate sanding between coats

On a construction site, limiting sealing to two passes in an entrance leads straight to the premature breakthrough of the film within three years. This chapter guides you in sizing the finishing system according to the intensity of use, applying the appropriate priming coat and executing mechanical intermediate sanding between passes to guarantee the adhesion and longevity of the work.

Key takeaways

  • The priming coat seals the substrate and prevents dangerous side-bonding of the parquet strips.
  • An entrance hallway requires three passes of sealer in addition to the primer to withstand traffic.
  • Intermediate sanding removes raised wood fibres and creates mechanical bonding between each coat.
  • The SIA 253 standard prescribes adapting finishes to the actual operational constraints of residential rooms.

Define film thickness according to stress and the SIA 253 standard

Observing premature wear of a parquet floor after three years in an apartment building lobby or a villa entrance almost systematically results from under-dosing the varnish. The summary application of two direct passes without a primer deposits an insufficient dry film thickness against the abrasive friction of soles loaded with silica. To meet the mechanical resistance requirements of the SIA 253 standard, the flooring contractor must adapt the finishing system to the actual destination of the room.

Recommended sealing systems according to the destination of the rooms
Traffic zoneExamples of roomsRecommended application systemTargeted thickness and durability
Moderate trafficBedrooms, interior hallways without direct access to the outside1 priming coat + 2 single-component sealer coatsStandard protection for light frictional wear without aggressive dust.
Sustained trafficLiving rooms, dining rooms, open-plan kitchens in apartments1 priming coat + 2 reinforced coats or 3 single-component coatsDense film capable of withstanding liquid spills and castor chairs.
Intense trafficEntrance halls, access corridors, offices, commercial spaces1 priming coat + 3 two-component polyurethane finishing coatsEnhanced barrier against micro-scratches and daily mineral abrasion.

Each wet coat applied with a roller at a rate of one hundred to one hundred and twenty grams per square metre loses a large part of its volume during the evaporation of water or solvents. With a water-based varnish containing about thirty percent dry extract, one pass leaves only about thirty micrometres of protective material on the wood. An application limited to two coats deposits a dry film that is too thin to withstand the mechanical stresses of a heavy traffic zone. The SIA 253 standard requires delivering a flooring finish capable of withstanding the declared use constraints: under-sizing the number of passes exposes the company to having to redo the entire sanding at its own expense when grey oxidation stains appear prematurely on the exposed bare wood.

Apply the primer and master the sanding between each pass

The priming coat never replaces a sealer coat. Its primary role is to saturate the surface porosity of raw wood, homogenize the substrate and block tannin bleed-through on species such as oak or chestnut. It also prevents the side-bonding effect of the strips. Without an insulating primer, the sealer infiltrates the edges and glues the joints together: during seasonal dimensional variations governed by ambient humidity, the wood can no longer move freely joint by joint, which causes erratic splitting or material tearing in the core of the strips.

  1. Application of the priming coatApply the sealer primer with a short-pile roller or stainless steel trowel depending on the product viscosity. Scrupulously respect the drying time prescribed by the manufacturer, generally two to four hours depending on the ventilation and temperature of the room.
  2. Application of the first sealer coatApply the first coat of varnish in a criss-cross and regular manner, without excessively stretching the material. The contact of the water contained in the varnish inevitably causes the superficial fibres of the wood to rise, making the surface rough to the touch.
  3. Methodical mechanical sandingAfter complete core drying of this first coat of varnish, perform the sanding using a single-disc machine equipped with a grain 120 or 150 abrasive mesh, or using a suitable abrasive pad. The operation cuts the raised fibres, removes small dust inclusions and flattens the film to create the mechanical adhesion essential for the next coat.
  4. Total vacuuming and finishing passesMeticulously dust the surface with an industrial vacuum cleaner fitted with a soft brush, followed by damp sweeping using a clean antistatic cloth. Then apply the second and, if prescribed, the third finishing coat within the required recoating intervals, avoiding any draughts carrying particles.

Sizing of the varnishing system according to mechanical stress

Observing premature wear of a parquet floor after only three years of operation in a building lobby or an apartment hallway almost systematically testifies to an under-sizing of the dry film. An economical system composed of a sealer primer and two passes of standard sealer offers insufficient thickness to withstand the abrasive friction generated by mineral dust and gravel embedded under soles. In bottleneck areas or sustained linear circulation, the combined stresses of shear and abrasion soon pierce the few tens of micrometres of resin, exposing the raw wood to fouling by moisture and dirt without the possibility of invisible local touch-ups.

The SIA 253 standard relating to wooden floor coverings requires adapting surface characteristics to the intensity of use of the building. The flooring contractor must distinguish between the moderate traffic of a bedroom, the average traffic of a private living room, and sustained or even intensive traffic specific to distribution corridors, entrances, shared offices or school premises. In environments subject to a high concentration of traffic, the composition of the varnish plays a decisive role: the choice must imperatively fall on a two-component water-based polyurethane varnish (2K varnish cross-linked by an isocyanate hardener), whose macromolecular structure resists Taber abrasion stresses and household chemical aggressions considerably better than a standard single-component.

Varnishing configurations according to room usage
Room usageStress levelSystem structureIndicative total consumptionCross-linking system
Bedrooms, enclosed hallwaysLow1 primer + 2 coats of 1K sealer240 to 280 g/m²Single-component polyurethane-acrylic varnish
Living rooms, dining rooms, private kitchensMedium1 primer + 2 reinforced coats or 3 1K coats300 to 350 g/m²High-performance single-component or two-component
Entrance corridors, building circulationsHigh1 primer + 3 coats of 2K sealer380 to 450 g/m²Two-component polyurethane with catalyst
Shops, restaurants, community hallsVery high / commercial1 bonding primer + 3 to 4 coats of 2K ceramic450 to 520 g/m²Two-component reinforced with mineral particles

The grammage applied per coat directly conditions the efficiency of the system. A normal pass with a 10 mm to 12 mm microfiber roller deposits between 100 and 120 grams per square metre of fresh product. Applying a varnish in coats that are too thin in an attempt to save on drying times leads to a brittle and micro-porous dry film. Conversely, excessively loading a single pass traps residual solvents and water, causing whitish cloudiness, outgassing blisters and deep structural softening of the varnish.

Role of the primer, sanding mechanics and adhesion control

The application of a priming coat or sealer primer constitutes an essential technical phase that the practitioner must never substitute with a first coat of diluted finishing varnish. The primer has three essential functions: to block tannin bleed-through or extractive materials (particularly critical on oak, chestnut or exotic woods), to regulate variable capillary absorption between springwood and summerwood, and to prevent side-bonding of strip edges, which is responsible for the appearance of sudden shrinkage cracks during the winter heating period.

Upon contact with the aqueous solvent of the primer, the superficial cellulose fibres cut by the last passes of the parquet sander inevitably rise due to moisture reabsorption. This phenomenon creates a surface that is rough to the touch, comparable to fine sandpaper. This is where intermediate sanding comes into play, carried out after complete drying of the primer or between the first and second finishing coat according to the resin manufacturer's recommendations. This operation is not intended to strip material but to mechanically level the lignified fibre tips and create a micro-roughness favourable to the mechanical anchoring of the subsequent coat.

  1. Hardening checkCheck that the underlying coat is perfectly dry to the core according to the manufacturer's technical data sheet (generally 2 to 4 hours for an aqueous primer, 12 to 24 hours for a 2K sealer). Insufficiently hardened varnish clogs the abrasive, fuzzes and tears off in patches under the effect of friction.
  2. Mechanical sanding passOperate a heavy single-disc machine fitted with a grain 120 or 150 silicon carbide abrasive mesh, or a fine diamond abrasive pad. Work in regular, criss-cross movements without ever staying in one place in order to guarantee uniform matting without breaking through the protective film on the edges of the strips.
  3. Vacuuming and static dustingRun an industrial vacuum cleaner equipped with a non-marking felt lip attachment. Imperatively follow up by sweeping with an antistatic textile gauze or a trapezoidal broom fitted with a dry microfiber. The use of water or liquid solvent is totally banned at this stage so as not to reactivate the wood fibres.
  4. Application of the next passSpread the sealer coat continuously with a roller, respecting the open time of the resin, crossing the passes and finishing in the direction of the wood grain or main light in order to erase lap marks.

Omitting sanding between each finishing varnish coat is sometimes attempted to speed up the construction site by relying solely on the chemical affinity window. While this method remains feasible in a rarely used living room between two coats applied the same day, it remains strictly forbidden in an entrance corridor. Sanding before the final pass guarantees the optical flatness of the film, eliminates airborne dust inclusions inherent to finishing work construction sites and provides the client with an impeccable finish compliant with acceptance of the work requirements according to the SIA 253 standard.

Management of premature wear defects and film touch-ups

The premature breakthrough of a varnish film, which is recurrent in dense traffic areas such as entrance hallways in apartment buildings or multi-family housing, almost systematically results from under-sizing the number of passes or omitting a technical priming coat. When a parquet floor is exposed down to the bare wood after three years, the protective film no longer provides the watertightness required by the SIA 253 standard. Washing water and abrasive dirt directly penetrate the wood, causing blackish tannin oxidation and irreversible fibre bursting that simple surface revarnishing cannot fix.

  1. Substrate diagnosis and cross-cut testEvaluate the extent of peeling or abrasion. If the varnish flakes off in patches without heavy mechanical stress, the absence of intermediate sanding between coats or exceeding the recoating time has blocked mechanical bonding. A cross-cut adhesion test confirms whether the failure is cohesive or adhesive.
  2. Arbitration between partial resurfacing and stripping down to bare woodIf the film is intact and simply surface-scratched, meticulous sanding with grain 150 followed by a two-component polyurethane finishing pass is feasible. On the other hand, as soon as the wood is marked, water-stained or worn down to bare wood over more than 5% of the traffic area, complete stripping down to bare wood by mechanical belt sanding is required to reconstitute the complete system.
  3. Reconstruction of the complete system according to trafficResume work from finishing sanding with grain 120. Imperatively apply the primer coat to block pores, followed by three passes of heavy-traffic sealer for high circulations, with systematic single-disc sanding before the last pass.

Frequently asked questions

Can the priming coat be replaced by a pass of diluted varnish?

No. Finishing varnish does not have the rheological properties of a sealer primer. The primer seals the wood pores, neutralizes tannin bleed-through and prevents solvents or water from the sealer from soaking the fibres. Diluting a sealer weakens its dry extract without guaranteeing the sealing function, which exposes the floor to local dimensional variations or system adhesion defects.

Why is mechanical intermediate sanding mandatory between passes?

The application of a water-based varnish inevitably raises the superficial wood fibres. Single-disc sanding removes this fibrous fuzz and eliminates the rough feel. Above all, after superficial polymerization, sanding creates the micro-scratches essential for the mechanical anchoring of the subsequent coat. Without this step, the upper film will not adhere and will eventually peel off under regular foot traffic.

How to size the varnish coats in an entrance corridor?

According to trade practice and the recommendations of the SIA 253 standard, a high-traffic area such as an entrance hall requires a complete system: a priming coat followed by three passes of high polyurethane resin content varnish. Two passes are sufficient in a bedroom, but wear out prematurely in areas where shoes bring in abrasive dust.

What abrasive should be used for intermediate sanding without scratching the film?

A grain 120 to 150 silicon carbide abrasive mesh is used, or a maroon abrasive pad type mounted on a low-speed single-disc machine. An abrasive that is too coarse leaves circular scratches visible in grazing light under the final coat, while one that is too fine polishes the varnish without creating the mechanical bonding required for the next application.

Texts and standards cited

  • norme SIA 253Wooden floor coverings and wood-based materials: installation requirements, surface protection and usage stresses.

In the same section