Acclimatisation: duration, stacked or unpacked boards, and the mistake of leaving them under plastic film

This chapter guides you through the methodical management of parquet acclimatisation on the construction site. You will learn how to arrange packs to ensure uniform air circulation, eliminate the trap of airtight packaging, and set the required adaptation period according to the board type. You will also learn how to carry out final hygrometric control measurements proving that the wood is ready for installation.

Key takeaways

  • Packs kept under airtight plastic film remain completely sealed against the ambient moisture of the construction site.
  • Acclimatisation requires packs to be raised off the floor and arranged in a cross-stacked pile to ventilate the assembly.
  • The minimum stabilisation period ranges from forty-eight hours to several days depending on the selected timber species.
  • Systematic control of the wood's moisture content validates the final authorisation for glued installation.

Break the seal of the packaging films and arrange the packs for air circulation

The most frequent mistake on construction sites consists of stacking parquet pallets in the centre of the room while leaving them under their factory plastic banding, under the illusion that the material is adapting to the room. Polyethylene stretch films form an almost absolute waterproof barrier against water vapour exchange. A hermetically sealed pack retains the exact hygrometry it had when leaving the factory, even after three weeks of storage on the screed. If the building's indoor climate differs from that of the manufacturing line, the wood will suffer a severe hygrometric shock as soon as the packs are opened on the very day of gluing.

Packaging management varies according to the typology of the boards. For traditional solid parquet, unfinished at the factory, it is essential to slit the protective films along their entire length, or even remove the boards entirely if the manufacturer expressly permits it. This exposure to air allows the wood to react uniformly on its visible and hidden faces. For prefinished or preoiled multi-layer parquet, opening must be controlled: neatly cut the ends of the cardboard boxes or protective sleeves to initiate the thermo-hygrometric transfer without brutally exposing the surface boards to plaster dust or construction site dirt.

  1. Isolation from the screedNever place timber packs directly on the mineral floor, even if the screed has been declared dry by the screed layer. Lay a polyethylene film of at least two hundred micrometres or place dry battens on the floor to create a clean capillary break.
  2. Cross-stacking on battensAssemble the packs flat, in alternating perpendicular layers like a cross-stacked pile. Insert dry timber battens of at least twenty millimetres in thickness between each row to maintain constant air circulation channels.
  3. Spacing from perimeter wallsLeave a minimum distance of fifty centimetres between storage piles and perimeter walls, strictly avoiding direct exposure to solar radiation behind glazed bays or the blast of mobile fan heaters.

This openwork arrangement ensures that each board experiences the same partial water vapour pressure. Without this ventilated stacking, the packs located in the centre of the mass remain cold and damp, while those exposed on the surface dry out prematurely, causing unmanageable dimensional discrepancies during the assembly of tongues and grooves.

Observe stabilisation times and validate the hygrometric balance before installation

The duration of stay of the packs in the installation area depends directly on the structural condition of the product and the prevailing climatic conditions. According to SIA 253 recommendations, installation work for wood flooring must only start if the indoor environment has a temperature between eighteen and twenty-two degrees and a relative air humidity between forty and sixty percent. Acclimatisation does not consist of correcting green or soaked wood, but of aligning its moisture content with the hygroscopic balance of the building in future service.

Recommended residence time of parquet flooring according to their manufacturing typology
Parquet typeConditioning on siteMinimum rest periodTarget equilibrium moisture content
Prefinished multi-layer (engineered)Cartons slit at both ends48 hours minimum7 to 9 %
Traditional unfinished solid (oak)Freed from film, stacked on battens4 to 7 days8 to 10 %
Solid on underfloor heatingUnpacked in very well-ventilated bays7 to 10 days7 to 8 %

At the time of installation, the substrate and materials must have a temperature and moisture content adapted to the subsequent conditions of use of the premises.

norme SIA 253

Authorisation to start installation depends exclusively on the instrumental check carried out after this adaptation period. The parquet layer carries out a series of measurements of the wood's moisture content using an electrical pin moisture meter calibrated according to the density of the timber species concerned. The insulated pins must penetrate at least one-third of the thickness of the board to read the core moisture and not a misleading surface film.

All recorded values, combined with ambient temperature and air humidity measurements taken with a dry-bulb or capacitive thermo-hygrometer, are scrupulously recorded in the parquet layer's inspection report. If the room air is abnormally dry in the middle of winter or saturated with water by fresh plaster on neighbouring floors, the parquet layer formally notifies the client that the physical conditions for acclimatisation are not met to begin gluing.

Physical arrangement of packs and aeration of piles in the room

Temporary storage on site before implementation is not limited to unloading pallets in a corner of the living room. Leaving packs under their waterproof heat-shrink sleeve prevents any gas exchange: the equilibrium moisture content of the wood remains fixed at its factory-exit level, making acclimatisation completely illusory. Upon delivery, packs must be prepared to allow ambient air to circulate around each element without causing mechanical deformations.

  1. Cutting protective filmsSlit the ends of the packaging with a utility knife or make regular longitudinal incisions without completely undoing the cardboards. This opening releases water vapour while retaining the strapping or envelope that keeps the boards flat and prevents cupping under the effect of asymmetrical moisture uptake.
  2. Elevation from the floorNever stack packs directly on the screed or concrete slab, even if it has been declared dry by the screed layer. Arrange dry rafters or joists of at least 50 mm thickness to create a ventilated air plenum under the first row of packs.
  3. Cross-stacking in openwork formationBuild up the packs flat in perpendicular cross-beds, leaving a lateral spacing of 30 to 50 mm between each pack. This pigeonhole layout ensures that the thermal air flow bathes all the rows, thus avoiding confinement at the core of the stack.
  4. Spacing from walls and thermal sourcesMandatorily keep piles at least 50 cm away from perimeter masonry and at least 1 m away from any auxiliary heating body or direct solar radiation zone behind glazed bays.
Storage configurations on slabs and physical consequences on boards
Storage methodAir circulationWood evolutionShort-term risk
Closed packs under plastic filmNoneStagnation at factory moisture contentSudden shrinkage or swelling after installation and gluing
Packs laid flat directly on the floorOnly on the upper faceAsymmetrical hygrometric gradientCupping of bottom bed boards
Boards fully unpacked and spread outExcessive and chaoticUnconstrained warping and bowingDifficulty in interlocking tongues and grooves
Opened packs stacked in openwork formation on raftersOptimal and uniformProgressive stabilisation towards room equilibriumDimensional stability complying with tolerances

Hygrometric check after acclimatisation and validation of substrate

The duration of presence of the boards on the construction site does not in itself constitute a guarantee of compliance. The acclimatisation period varies according to the density of the species, the thickness of the boards and the structure of the parquet, whether solid or engineered multi-layer. Authorisation for gluing depends exclusively on the matching physical reading between air humidity, ambient temperature and wood moisture content, in accordance with the requirements of standard SIA 253. The parquet layer applies their measuring equipment to establish the equilibrium curve before releasing the start of installation.

  • Check that the ambient climate of the room complies with the conditions of standard SIA 253: air temperature between 18 °C and 22 °C, relative air humidity between 35 % and 65 % (ideally 40 % to 60 % for multi-layer parquet).
  • Measure the moisture content of the wood using an electrical pin moisture meter with insulated pins, driving the electrodes parallel to the grain into the core of the board, after calibrating the device according to the species concerned.
  • Test at least three boards per manufacturing batch, taking samples from the centre of the pile and not only from the top.
  • Check that the wood moisture matches Swiss service values: a usual set value of 8 % to 10 % for solid parquet, and 7 % to 9 % for engineered parquet.
  • Record all readings on the daily installation report before mixing any packs and before opening glue tins.

If the check reveals a deviation greater than two percentage points between the measured moisture of the boards and the theoretical equilibrium moisture corresponding to the stabilised ambient climate, acclimatisation must be extended. When the temperature or relative humidity conditions of the room are not ensured by the client, installation work must be postponed. The parquet layer immediately records their written reservations to certify the incompatibility of the indoor climate with the installation of the wood material.

Management of acclimatisation discrepancies and remedial procedures on site

When parquet packs have remained hermetically sealed under shrink-wrap film on the construction site, acclimatisation is nil. Installing solid or engineered wood in this state exposes the work to immediate cupping, cracking or destructive thrusts against walls. Faced with this situation, the parquet layer suspends the start of work and notifies the interruption in writing to the site management.

  1. Unconditioning and redistribution of boardsSlit the polyethylene films along the entire length of the packs or unpack the parcels according to the manufacturer's guidelines. Reconstruct cross-stacked or openwork batten piles, raised off the floor by at least ten centimetres, to force ambient air circulation at the core of the pile.
  2. Restoration of room ambient conditionsVerify that closed rooms permanently maintain a climate complying with service requirements, without residual moisture input from other trades. If the ambient environment drifts, demand thermal regulation and stabilisation of air hygrometry.
  3. Extension of stabilisation durationImpose a new acclimatisation period in the regulated room, generally from several days to a week depending on the species and the thickness of the top layer, to allow balanced desorption or adsorption of wood fibres.
  4. Contradictory control measurement before installationCarry out a series of measurements with the calibrated pin moisture meter, with species correction, on boards sampled from the centre and perimeter of the piles. Note each value on the inspection report before any gluing or nailing.

If the client demands installation despite a non-compliant measurement or a shortened waiting time, the parquet layer logs a formal written notice detailing the risk of deformation according to standard SIA 253. No construction work must begin until the hygrometric equilibrium between the wood and the ambient air is measured and documented.

Frequently asked questions

Why do parquet boards not acclimatise at all through their original packaging?

Polyethylene covers and heat-shrink plastic films form a waterproof barrier against water vapour. The ambient air of the room cannot reach the wooden elements. The temperature of the room is slowly transmitted to the material, but the relative moisture of the wood remains strictly unchanged. The hygrometric equilibrium required before installation is therefore impossible without slitting or removing these airtight protections.

How long before installation should the boards be stored in the destination room?

The usual delay varies from 48 hours for prefinished engineered parquet to five days or more for thick solid wood. This duration only makes sense if the packs are opened and if the room climate already respects normal operating conditions. The final criterion is never the calendar but the confirmation of wood moisture using the moisture meter.

How to physically organise the arrangement of packs in the room for optimal ventilation?

Storage of compact pallets or direct placement of packs on the floor must be prohibited. Opened packs are stored flat on joists or shims of at least ten centimetres in thickness, away from exterior walls. The rows are staggered in a staggered pattern or separated by battens to guarantee a continuous air flow in the centre of the pile.

What hygrometric control must the parquet layer perform once the acclimatisation period has elapsed?

The parquet layer measures the moisture content of the boards with an electrical pin moisture meter calibrated according to the species concerned. They drive the insulated electrodes into the core of the wood, on several samples distributed in the peripheral and central packs. According to standard SIA 253, the value obtained must strictly match the equilibrium hygrometry planned for the room before starting any assembly work.