Skip to content
Website
🧱 CFC 211.1Reinforcement: bending, laps and placementChapter 3 of 10 in the section

Cutting and bending of reinforcement: mandrel diameter and hooks

After this chapter, you will be able to dimension and check mandrel diameters according to SIA 262, verify the geometry of anchorage hooks, and enforce the strict ban on cold bending or straightening on your construction site.

Key takeaways

  • The minimum mandrel diameter prevents steel cracking and localised concrete crushing.
  • Standard SIA 262 distinguishes between mandrels for stirrups and those reserved for longitudinal bars.
  • Any attempt at cold straightening of a bent reinforcing bar is strictly prohibited on the construction site.
  • Hooks require a standardised residual straight length to ensure reliable mechanical anchorage.

Minimum mandrel diameter and steel bending mechanics

The cutting and bending of reinforcing steel cannot be improvised with a bending iron on the corner of a workshop bench. Standard SIA 262 sets strict geometrical requirements for bending bars in order to avoid two destructive phenomena: the formation of microcracks on the outer tensioned face of the metal and the spalling of concrete inside the bend caused by concentrated transverse compressive stresses. B500B steel bent around too small a radius undergoes severe work hardening, which destroys its ductility and creates notches prone to brittle fracture.

Minimum mandrel diameter (D)
Diameter of the forming cylinder around which the reinforcing bar is wrapped during bending. This diameter directly determines the inside bend radius of the shaped bar.
Indicative minimum mandrel diameter values by structural use
Reinforcement typeNominal bar diameter (d)Minimum mandrel diameter (D)
Links, stirrups, and crosstiesd ≤ 16 mm4 · d
Bent longitudinal barsd < 16 mm4 · d
Bent longitudinal bars16 mm ≤ d < 25 mm7 · d
Bent longitudinal barsd ≥ 25 mm10 · d

For large-diameter reinforcing bars, the bearing pressure under the bend transmitted to the concrete frequently exceeds the tensile strength of the adjacent material. When the anchorage force is high, the civil engineer specifies a mandrel larger than the standard minimums to prevent spalling or premature splitting of the reinforced concrete element along the plane of the bend.

Compliance of hooks and formal prohibition of cold straightening

Bends and hooks, such as 90-degree, 135-degree, or 180-degree hooks, must ensure full transmission of the tensile force to the concrete without premature slip. In addition to complying with the bending mandrel required by SIA 262, each hook requires a minimum straight tail length beyond the curve. For a standard right-angle hook, this straight extension generally measures at least 5 nominal diameters, providing adequate mechanical interlock within the confined core of the structure.

Repeated bending and cold straightening of installed or starter reinforcement are strictly prohibited, as they destroy the crystalline structure of the metal through excessive strain hardening.

Norme SIA 262
  1. Identification of an accidentally bent barImmediately isolate steel buckled by lifting equipment or bent to clear a penetration box. Strictly prohibit any attempt to hammer it back or lever it with a tube.
  2. Notification to site managementReport the defect to the structural engineer to determine the remedial solution: chemical anchoring of a replacement bar according to the required approval or installation of a mechanical coupler.
  3. Replacement or cropping of the defective elementCut off the damaged bar with an angle grinder to remove the work-hardened zone, then carry out the approved connection in compliance with lap lengths.

Every chargehand ensures that no illicitly straightened reinforcement is embedded during the pour. According to art. 229 CP, whoever, in directing or executing a construction or demolition project, intentionally contravenes the recognised rules of the trade and thereby knowingly endangers the life or limb of persons faces a custodial sentence of up to five years or a monetary penalty. The failure of a bar embrittled by unauthorised bending directly engages the criminal liability of the site manager and the operatives.

Bending specifications according to SIA 262 and impact of mandrel diameters

The cutting and bending of reinforcing bars on structural work construction sites tolerates no geometric improvisation. According to SIA 262, B500B reinforcing steel undergoes extreme plastic strain during cold deformation. Using a mandrel with a diameter below standard requirements causes microcracking on the tensioned extrados of the bar, while crushing the ribs on the compressed intrados. This internal mechanical damage drastically reduces the ductility of the metal, promoting brittle fracture under dynamic or seismic loading.

Minimum mandrel diameters by element type and bar size (B500B)
Type of shaped reinforcementNominal bar diameter (d_s)Minimum bending mandrel diameter (D)Direct consequence of undersizing
Links, stirrups, confining crosstiesd_s <= 16 mm4 d_sMicrocracking of steel during bending, rib failure
Main curved anchorage bars (bends, hooks)d_s <= 16 mm4 d_sLocalised spalling of concrete at the intrados under tension
Longitudinal bars and continuity hooksd_s > 16 mm (20 to 40 mm)7 d_sCritical work hardening of the steel and immediate risk of brittle cracking
Reinforcement welded prior to bending (on or near the bend)All permitted diameters20 d_sImmediate tearing of the heat-affected zone from welding

The rule applies with increased strictness to large-diameter reinforcement frequently found in transfer beams, raft foundations, or bridge piers. For a 26 mm or 32 mm bar, attempting to bend it using the standard bending rollers of a mobile site bender without checking the correct mandrel assembly leaves the reinforcement facing complete rejection. The radii mandated by SIA 262 also prevent the concentration of transverse compressive stresses on the intrados, a frequent cause of premature spalling of the cement matrix even before the yield strength of the reinforcement is reached.

Curved anchorages, hooks, and strict management of bending errors

Curved anchorages, formed by a 90-degree bend, a 135-degree hook, or a full 180-degree hook, are designed to transmit tensile forces to the concrete without exceeding ultimate bond stresses. The length of the straight tail located beyond the bend radius is critical. For stirrups or crossties, this tail extension must not fall below 5 times the bar diameter (with an absolute minimum of 50 mm) to prevent premature slip during confinement of the load-bearing element.

Fixing errors sometimes lead operatives to attempt to rebend an incorrectly formed bar or manually adjust an anchorage angle directly inside the formwork. This practice is prohibited by SIA 262. Cold straightening of already bent reinforcement strains the steel into the post-yield range under a reverse hysteresis cycle. This action destroys the crystalline structure of the material through low-cycle fatigue, causing irreversible embrittlement and an almost certain crack initiation at that cross-section.

When a shaped bar does not achieve the angle specified on the working drawings or starter bars have been bent during skip rotation phases, the only permitted course of action is to cut the defective element flush and install a compliant replacement anchorage: chemical anchoring approved by the civil engineer or a lap joint with a new bar bent according to the rules of the trade.

Supervision of site bending stations or the inspection of pre-bent rebar delivered from the steel yard is the responsibility of the foreman. Art. 364 CO stipulates that the contractor's liability is subject to the same rules as that of an employee, whether executing the work personally or under their personal direction. Ensuring that steel fixers use the specified mandrel and discard any inadvertently bent steel guarantees the strict structural compliance of the build without giving rise to disputes during inspection by the engineering consultancy.

Management of bending non-conformities and disputes on the construction site

On a reinforced concrete construction site, non-compliant bending discovered during placement is never corrected using sledgehammers or scaffolding tubes. When a bar has a bend radius smaller than required, the metal has undergone excessive work hardening. The strain may have initiated microcracks invisible to the naked eye on the tension face of the reinforcing steel. Applying a reverse bend to realign the bar compounds the crystalline damage and leads to instantaneous brittle fracture when the structure is loaded.

  1. Isolation of the defective batchStop fixing as soon as non-compliant radii are identified. Mark the reinforcement with grease chalk and record the relevant bar mark numbers from the bending schedule.
  2. Formal notification of the deviationNotify site management and the engineering consultancy in writing, providing the record of the actual mandrel diameters used by the bending plant or site yard.
  3. Assessment and technical alternativesThe civil engineer rules on structural capacity. Permitted solutions are limited to full replacement of the bars, adding drilled and chemically bonded straight rebar, or lapping with new reinforcement providing the code-mandated anchorage length.
  4. Traceability and disposalRejected bars are immediately removed from the lifting skip or cut up to prevent any accidental re-use in the load-bearing structure.

If the dispute concerns a batch delivered by the steel supplier, the contractor applies the Code of Obligations (CO). Art. 365 CO para. 3 provides that if the material supplied or any circumstance compromises regular execution, the contractor shall inform the client. This duty to notify protects the enterprise against defective deliveries. In the event of a serious failure to adhere to the rules of the trade through negligence endangering human lives, art. 229 CP establishes the sanctions faced by those in charge of execution.

Frequently asked questions

How should one react when starter bars bent during formwork operations need to be straightened?

Pre-bending starter bars to simplify formwork operations and subsequently straightening them manually destroys the load-bearing capacity of the steel. If this detail is unavoidable on drawings, the contractor must install factory-certified rebar continuity strip boxes featuring special ductile steel, or use threaded rebar couplers compliant with SIA 262.

Can reinforcing steel be heated with a torch to adjust a bend angle?

Applying heat with a cutting torch is completely prohibited on building construction sites. Modern reinforcing steels are thermo-mechanically treated. Uncontrolled local heating destroys the metallurgical structure, alters the yield point, and renders the reinforcement brittle at the bend. Any bar heated in the formwork or on the site bending bench must be systematically rejected and replaced with new material.

What tolerance applies to the mandrel diameter of an anchorage hook?

No negative tolerance is permitted on the minimum mandrel diameter prescribed by SIA 262. An undersized mandrel work-hardens the steel during bending and generates excessive radial pressures in the concrete upon pouring, leading to premature bursting of the cover. The actual mandrel mounted on the bending machine must strictly equal or exceed the design value determined by the engineer.

What should be done when a precast beam arrives with links bent to excessively tight radii?

The chargehand halts installation of the element and draws up an immediate non-conformance report. Incorrect bending of the links compromises shear transfer and stirrup anchorage. The structural engineer must evaluate whether core confinement remains assured. If calculations cannot validate the detail, the component is rejected and returned to the precast plant.

Texts and standards cited

  • norme SIA 262Technical specifications for concrete structures, reinforcement bending, and minimum mandrel diameters
  • CO art. 365Contractor's duty to notify if supplied material or circumstances compromise execution of the work (para. 3)
  • CP art. 229Breach of the recognised rules of the trade endangering life or limb

In the same section