🧱 CFC 211.1Walls, columns and vertical elementsChapter 8 of 10 in the section

In-situ cast concrete stairs: riser shuttering, going and constant rise

This chapter details the setting out and shuttering stabilization methods for an in-situ cast staircase. You will learn how to strictly set out the going and rise on the waist, how to wedge the riser boards taking into account future finishes, and how to carry out geometric checks on the whole assembly before ordering concrete to eliminate any irreversible defects.

Key takeaways

  • Connecting levels correctly requires taking into account the exact thickness of finished floor coverings at both landings.
  • The one-metre datum transferred onto the wall guides the full layout of the treads and risers.
  • Fixing the riser boards requires rigid axial bracing to block any thrust during pouring.
  • Checking each step down to the millimetre is mandatory before the final fixing of the stop ends.

Setting out the full-scale layout on the wall and adjusting the waist

The execution of an in-situ cast concrete staircase tolerates no geometric improvisation. A difference in height between steps constitutes a major non-conformity, noticeable at every stride and particularly complex to rectify after the structure has hardened. Even before placing the first soffit formwork panel, the complete layout of the flight must be marked out on the staircase wall or side formwork using a chalk line, a three-metre aluminium straightedge and a precision laser level.

Stair waist
An inclined reinforced concrete slab that constitutes the load-bearing element of the flight of stairs, connecting two consecutive landings and supporting the treads and risers.

The starting point of the layout must be based on the one-metre datum transferred from the general building benchmark. The total rise to be overcome between the starting finished floor level and the landing finished floor level must be calculated. The first pitfall lies in forgetting the thicknesses of screed, adhesive and tiling. The first rough step must therefore include the screed allowance of the lower landing, while the final rough riser must incorporate that of the arrival landing. Without this strict compensation during setting out, the first rough step will be several centimetres too high once the finishing work is completed, or the final one will be too low.

Once the nosing points of each step are marked on the vertical face, the underside line of the waist is determined by drawing a parallel line to the slope of the step intersections, offset by the nominal thickness of the inclined slab, generally between 14 and 18 cm. The waist soffit shuttering is then erected on shoring towers or single props with softwood bearers and prefabricated beams. The soffit must have flawless rigidity to prevent any deflection under the combined load of fresh concrete and heavy reinforcement.

  • Transfer of the official one-metre datum checked with an optical level or rotary laser.
  • Marking of each step nosing with a carpenter's pencil or chalk line directly onto the wall.
  • Check of the comfort formula (two rises plus one going between 600 and 640 mm).
  • Calculation of the minimum throat thickness to ensure compliant cover to the bottom and top reinforcement.

Securing riser boards and dimensional checks before pouring

Placing the riser boards takes place once the reinforcement layers are positioned and wedged with fibre-reinforced concrete spacers. The boards, often made of three-ply panels or planed planks at least 27 to 35 mm thick depending on the flight width, are cut to the exact dimension of the step. To prevent concrete from welling up under hydrostatic pressure as the pour rises, the bottom of the riser board must be bevelled backwards at an angle of 15 to 30 degrees, which also facilitates hand trowelling of the rough tread surface.

Standard fabrication tolerances for rough stairs
Checked itemMaximum allowable deviationConsequence in case of non-compliance
Height of consecutive steps± 3 mmTrip hazard, mortar levelling required
Going width± 5 mmIrregular step width, complex tile cuts
Step horizontality± 3 mm across the widthWater ponding outdoors, difficult floor covering installation
Waist thickness- 5 mm / + 10 mmStructural weakness or unnecessary overload on propping

The stability of the riser boards constitutes the most critical point. They are fixed laterally to the side forms or by means of cleats anchored to existing masonry or concrete walls. However, for flights wider than 1.00 metre, the boards deflect under concrete pressure if they are not stiffened. A central spine is systematically nailed: a timber raker running in the direction of the slope, secured by struts and props wedged against the upper ceiling or a fixed point of the structure.

The alignment of the riser nosings is verified by placing a straightedge diagonally across all edges: all boards must touch the straightedge continuously, with neither dips nor humps. If the material provided by the client or the ground designated by them is found to be defective, or if any other circumstance compromises the proper or timely execution of the work, the contractor shall immediately inform the client pursuant to art. 365 CO. This duty of care applies strictly when an setting out error on the floor slabs prevents accommodating a whole number of regular steps.

Whoever intentionally breaches the recognised rules of the trade while directing or carrying out a construction or demolition project, thereby knowingly endangering the life or physical integrity of people, shall be liable to a custodial sentence not exceeding five years or a monetary penalty; in cases of negligence, to a custodial sentence not exceeding three years or a monetary penalty.

art. 229 CP

Execution tolerances and step level transfer

On an in-situ cast staircase, a variation in height between two consecutive risers is an unacceptable defect for the user. The human locomotor system locks into the stride rhythm within the first two steps; a local deviation of a few millimetres systematically causes tripping. Structural work must therefore guarantee absolute consistency in the rough stair step, by precisely incorporating the thickness of future floor coverings defined by the architect's working drawings.

The classic layout error on the waist stems from forgetting differential floor finishes between levels. If the lower landing receives a 70 mm floating screed with tiling and the staircase remains exposed stained concrete, the first shuttered riser must be increased by the exact value of this floor assembly. Conversely, arriving at the upper slab, the thickness of the landing covering reduces the height of concrete to be shuttered for the final riser. If these allowances are not deducted on the side forms when setting out with chalk or a scribe, the starting step will be too low and the top step too high once the finishing work is complete.

Impact of floor build-ups on shuttering risers (indicative construction site values)
Step positionFloor covering situationCorrection on rough riser board
First riser (start)Screed and floor tiles on lower floor (60 mm), exposed concrete flightBoard height = Theoretical height (h) + 60 mm
Intermediate stepsIdentical thickness covering across the entire flightBoard height = Theoretical height (h) constant
Final riser (arrival)Screed and floor tiles on upper landing (60 mm), exposed concrete flightBoard height = Theoretical height (h) - 60 mm
Fully tiled flightUniform applied covering on steps and landings (15 mm)Board height = Theoretical height (h) constant

Pre-pour inspection protocol and flight securing

Before approving the positioning of the concrete skip or pump line, the foreman applies a strict sign-off procedure for the formwork. The hydrostatic pressure of fresh concrete, combined with the inclined thrust component on the riser boards, tends to lift the shuttering and tilt the boards forward. The mechanical rigidity of the entire system must be verified; otherwise, the goings will deform during pouring.

  1. 1. Dimension check with an alignment laserCheck the cumulative height from the reference one-metre datum to each upper board edge. Check the actual clear going between the outside face of one riser and the edge of the next. Any deviation beyond tolerance must be rectified immediately by wedging against the side forms.
  2. 2. Verification of riser rakeEnsure that the risers feature the prescribed angle (generally vertical or with an undercut rake of 10 to 20 mm to enlarge the foot bearing area). An accidental forward slope is a major non-conformity that is difficult to correct after the binder sets.
  3. 3. Inspection of axial stiffening (temporary central stringer)Beyond a flight width of 1.20 m, boards deflect under the concrete thrust. Inspect the presence and locking of the axial bracing board (raking central spine), firmly propped against the upper floor or tied back with anchors fixed to the soffit shuttering.
  4. 4. Cleaning the waist soffitUsing an industrial vacuum cleaner or compressed air, remove wood shavings, tying wire cut-offs and accumulated dust at the base of the risers before sealing the cleanout access openings at the foot of the flight.

Checking the propping beneath the waist is the final critical point. The angle of the flight transfers a portion of shear force onto the prop heads. Bracing and tripods must prevent any longitudinal slipping of the shuttering downwards as concreting progresses from the first step to the arrival landing. The foreman and the civil engineer record these checks on the pour card before calling in the truck mixers.

Managing shuttering deviations and rectifying geometric non-conformities

An unanticipated step variation on an in-situ cast concrete staircase constitutes a structural defect with heavy consequences. When pre-pour checks reveal a setting out discrepancy or waist formwork distortion, corrective action must take place before introducing concrete. Any geometric defect cast in concrete transfers the problem to the finishing work, alters balustrade parapet heights, and subjects users to a recurring trip hazard.

Corrective measures according to the scale of deviations observed during inspection
Observed dimensional deviationInspection stageCorrective action on the construction site
Going or rise out of tolerance (≤ 5 mm)Before concreting (on shuttering)Loosening side forms, re-wedging riser boards and re-bracing
Major setting out error (> 5 mm)Before concreting (on reinforcement)Full realignment of lines on the wall, checking minimum waist thickness
Non-compliant step after settingAfter striking formwork (hardened concrete)Immediate notification to site management; concrete planing or structural repair mortar approved by the engineer

If the layout on the wall reveals an irreconcilable level conflict with the connecting slabs, the contractor complies with the obligations of art. 365 CO by notifying site management of drawing discrepancies without delay. Regarding stability, OTConst requires taking measures to ensure that falling materials or collapsing building components do not endanger workers. Waist propping that is inadequately triangulated against the thrust of pouring leads to the progressive sagging of the first steps.

Frequently asked questions

How do you compensate for a 15 mm setting out error discovered on the final step?

If the staircase has not yet been poured, immediately alter the wedging of the final riser and redistribute the deviation across the preceding three steps if tolerances allow. If concreting is complete, you must obtain approval from site management to rectify the geometry using a proprietary repair mortar or careful scabbing of the step nosing, without compromising the specified cover to reinforcing steel.

What should be done when the waist sags slightly while vibrating the concrete?

Stop concrete placement immediately to inspect the soffit of the flight. Tighten and wedge the failing props immediately using screw jacks, then check the level using a straightedge and laser level. If the deformation exceeds permissible tolerances, remove the excess fresh concrete before it sets in order to accurately realign the distorted riser boards.

Why is the first rough concrete riser often higher than the others?

This rough extra height anticipates the acoustic insulation and floating screed of the departure floor. If the finished level includes a 70 mm screed with covering while the steps only receive paint or a thin resin, the first structural riser must incorporate this extra height. Without this compensation, the first finished step will remain permanently too low after the finishing work.

What tolerance for going variation is acceptable between two consecutive steps?

The dimensional difference between two successive steps must strictly remain below the threshold of allowable site tolerances, generally set at a maximum of 3 to 5 mm depending on contractual specifications. An irregularity felt by the foot alters the user's stride and creates a constant hazard. Any subsequent remedial work on hardened concrete requires prior approval from the responsible civil engineering consultancy.

Texts and standards cited

  • CO art. 365materials and ground: notification to the client if any circumstance compromises proper execution